Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,

Slides:



Advertisements
Similar presentations
ILC Global Design Effort 1 ILC SCRF (WG2) program GDE Status Debriefing Hitoshi Hayano 2008/2/25.
Advertisements

HOMSC12, ICFA Mini Workshop, Cockcroft Institute, 25 th - 27 th June 2012 Welcome and Introduction to the Workshop! Roger M. Jones Cockcroft Institute.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
ECFA LC2013 ECFA LC13 SRF Technology Summary Wolf-Dietrich Möller Rongli Geng Hitoshi Hayano ECFA LC13 SRF Technology Summary Hamburg, Mai 31 st 2013.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Mechanical issues SPL cavities/cryomodules: Objectives V.Parma Mini-workshop on Mechanical issues SPL cavities/cryo-modules, CERN 30th September 2009.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
05/12/2011O. Napoly1 TESLA Technology Collaboration JLab, 5-8 November 2012 O.Napoly, CEA-Saclay TTC Chairman Introduction and update since last meeting.
05/12/2011O. Napoly1 TESLA Technology Collaboration Beijing, 5-8 December 2011 O.Napoly, CEA-Saclay TTC Chairman Introduction and update since last meeting.
TTC TB Nov.7, TESLA Technology Collaboration At Jlab, 5-8 November, 2012 Nobu Toge and Wolf-Dietrich Moeller Report from the Technical Board (TB)
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Hans Weise, DESY TTC Meeting, Milano, February 28 – March 3, 2011 Technical Board Meeting TESLA Technology Collaboration Meeting Milano, February 28 th.
05/12/2011O. Napoly1 TESLA Technology Collaboration JLab, 5-8 November 2012 O.Napoly, CEA-Saclay TTC Chairman Collaboration Board Report.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
05/12/2011O. Napoly1 TESLA Technology Collaboration Meeting Beijing, 5-8 December 2011 O.Napoly, CEA-Saclay TTC Chairman Collaboration Board Report.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
ILC10 Beijing Global Design Effort
SRF summary accelerator WG
ILC R&D Board Meeting: SRF Cavities Status and Plans
Summary of WG2: Design and Fabrication of Cavities and Cryomodules
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Meeting for S1-Global module design Cryomodule and Cryogenics
WG-1 Session Cavity Performance Cryomodule Performance
TTC - JLab - Bob Laxdal - TRIUMF
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
2009 TESLA Technology Collaboration Meeting at Orsay
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
TESLA Technology Collaboration KEK, 2-5 December 2014
, A. Yamamoto SCRF WebEx Meeting.
WG3: Main Linac SCRF(cavity,cryomodule)
Olivier Napoly, coordinator CEA/Irfu
Report of TTC-TB meeting at INFN-Milano
TTC meeting at Milano, 2011' Feb. .28
Daresbury ESS In-Kind Contributions
TTC meeting, Milano Global Design Effort
TESLA Technology Collaboration Meeting at Milano
Welcome & Introduction
Hans Weise, DESY February 5th, 2019
Report of TTC-TB meeting at TRIUMF, UBC
Introduction WG2 Martina Martinello, Oliver Kugeler TTC Meeting 2019.
Presentation transcript:

Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8, 2011, Beijing

TTC NEW Technical board membership Chairman N. Toge (KEK) W.-D. Moeller (DESY), co-chair Cavity and couplers C. Antoine (CEA) S. Bousson (CNRS-Orsay) R.L. Geng (JLab) C. Ginsburg (FNAL) E. Kako (KEK) R. Laxdal (TRIUMF) D. Reschke (DESY) Ji Yuan ZHAI (IHEP) Red = registered at this meeting TESLA Technology Collaboration Meeting, Dec. 5-8, 2011, Beijing RF and Tuning O. Brunner (CERN) P. McIntosh (STFC) S. Noguchi (KEK) Cryomodule and cryogenics H. Nakai (KEK) T. Peterson (FNAL) P. Pierini (INFN) Integration and Operation H. Hayano (KEK) Sang-Ho Kim (SNS) M. Liepe (Cornell) S. Schreiber (DESY) Honoris Causa J. Mammosser (JLab) C. Pagani (INFN) M. Ross (GDE) H. Weise (DESY) A. Yamamoto (KEK) Nobu Toge and Olivier Napoly have formed a new TTC TB. The goal is to include more representatives from different institutions and projects.

Charge of TTC TB MoU of TTC the Technical Board TB: shall provide advice to the collaboration on technical activities towards reaching the goals of the Collaboration Mission. TB will: – compile information on the technology activities in different technical areas, – provide findings and recommendations to the CB. – Involve the low beta community TESLA Technology Collaboration Meeting, Dec. 5-8, 2011, Beijing

Follow up topics from the last TB meetings Documentation of existing cavity preparation infrastructures – Wolfgang Weingarten delivered within EuCARD a booklet for Europe:  Oliviers proposal: we ask every TB representative once a year for just a table with the main information. This will be published at the TTC homepage. Pressure vessel certification – No presentations at this meeting. – Procedure for the XFEL cavities is almost fixed and realisation already started. – An international approach is not investigated and also not visible now. – Not a topic this meeting  We propose: XFEL and KEK procedure presentation at the next meeting. TESLA Technology Collaboration Report, Dec. 5-8, 2011, Beijing

Cavity field emission: calibration of the different test stands (vert., hor.) at different institutes – Paper from D. Kostin at the SRF11 conference about the Desy test stands – First activities at Fermilab and Jlab.  This is still very important! We propose presentations from various Labs at the next TTC meeting. Which data can TTC expect from the larger scale cavity/coupler/module production of e.g. XFEL? – In a mass production the components are probably not qualified up to its limits, but only up to the needed performance – this is not R&D – This is a loss of information for later projects and R&D. – Which additional systematic measurements could be included in the tests? (recording of processing events? one or more power rise?)  We propose to get information on the module test procedures from XFEL and Jlab next meeting (Sept.2012 first XFEL module tests). TESLA Technology Collaboration Meeting, Dec. 5-8, 2011, Beijing

Follow up topics from the last TB meetings, cont. Cavity degradation is discussed this meeting – After the module assembly – During the test, vert. and in module  Because of the importance we propose to continue. The low beta experience would be very helpful. Power coupler – We had a session at this meeting – Technology – Operating – Cleaning of power coupler  Will be continued. High Q discussion – CW operation – was addressed at this meeting – Low field high Q discussion should be continued. – Magnetic shielding and microphonics  should be continued. TESLA Technology Collaboration Meeting, Dec. 5-8, 2011, Beijing

General topics In depth discussion: – we saw how it works - We recommend: – Contact the new “Open Collaboration Meeting on Superconducting Linacs for High Power Proton Beams (SLHiPP-1)” and find out how we can work together – Avoid project status or lab activity talks in favor of: – More time for discussion even when the schedule slips (we are a small workshop) – Avoid webex talks (if possible) TESLA Technology Collaboration Meeting, Dec. 5-8, 2011, Beijing

We thank our hosts for the perfect organization and warm hospitality. We wish everybody a good trip home and welook forward to see you next time TESLA Technology Collaboration Meeting, Dec. 5-8, 2011, Beijing