SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 11 March 2016.

Slides:



Advertisements
Similar presentations
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
Advertisements

UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Line Efficiency     Percentage Month Today’s Date
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
EU Market Reviews PFG Update - September 2002 Elaine Axby Project Director.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Coordination of Capacity Products Meinhard Janssen GTE ExCom Member GTE+ Workshop on GTE+ Work Programme 24 June 2008.
Accident Investigation SGRP CD Slide # Meeting 1 Northern Ontario Safety Group.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 14 January 2016.
SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL.
Power of Choice (PoC) Program Overview
EXECUTIVE forum DATE: MON 29 MAY 2017 TIME: 1:30 PM– 2.30 PM (AEST)
Power of choice – embedded networks information session
Power of choice executive forum
B2B Working Group Meeting
PROGRAM CONSULTATIVE FORUM Meeting pack
Power of Choice – Program Consultative Forum (Poc-PCF) Meeting pack
Recommendation of Texas Test Plan Team to RMS
EXECUTIVE forum DATE: 15 DECEMBER 2016 TIME: AM – PM
PROGRAM CONSULTATIVE FORUM Meeting pack
Jan 2016 Solar Lunar Data.
Implementation Review Team Meeting
PROGRAM CONSULTATIVE FORUM Meeting pack
Transmission Planning Attachment K Public Input Meeting
Power of choice (POC) Executive Forum
POC Procedures Working Group (POC-pWG)
PROGRAM CONSULTATIVE FORUM Meeting pack
PROGRAM CONSULTATIVE FORUM Meeting pack
POWER OF CHOICE PROGRAM CONSULTATIVE FORUM
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
EXECUTIVE FORUM 8a Meeting pack
Five-Minute Settlement Program: Information Session 1
Five-Minute Settlement Program: Executive Forum 1
Five-Minute Settlement Program: Program Consultative Forum 1
Average Monthly Temperature and Rainfall
PROGRAM CONSULTATIVE FORUM Meeting pack
PROGRAM CONSULTATIVE FORUM Meeting pack
EXECUTIVE forum DATE: 27 MARCH 2017 TIME: 2.00 PM – 3.30 PM (AEDT)
80-Hour SHARP Certification Course Schedule
BUSINESS OWNER MEETING
Amendment Invoice Task Force Progress Report
Revised engagement approach for draft GTAC
ESB Networks Market Release Meeting of the IGG, March 5th 2009
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Exit Capacity Substitution and Revision
Power of Choice (PoC) Program Overview
Electricity Cost and Use – FY 2016 and FY 2017
Work plan and next steps – RDE-LDV working group
DSC ChMC CSS Consequential Update 13th March 2019
Safety Group Program Timeline
SC SC SC WS SC S HIS Background document Seminar document
Amendment Invoice Task Force Progress Report
Gas Customer Forum DN Interruption Update - Introduction
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Proposed June 2020 UK Link Major Release Scope / Governance Timeline
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Code change proposals completed – Sep 16
Structure of the Code Don Thomson, Task Force Chair IESBA CAG Meeting
Safety Group Program Timeline
Presentation transcript:

SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 11 March 2016

SLIDE 2 AGENDA SLIDE 1.Background 2.Pre-Consultation Paper 3.Procedure Updates Work Packages 1, 2 and 3 Consultation Process Overview Program Overview – Work Package 2 4.AEMC update on MRP rule change

SLIDE 3 1. BACKGROUND AEMO has facilitated three POC-PWG workshops since February 2016 The workshops have discussed specific topics relating to matters from the following AEMC rule determinations: o Competition in metering and related services o Embedded networks o Meter replacement process The aim of the workshops has not been to litigate the rules, but rather to focus on topics where AEMO has needed further input and information from stakeholders to update the Procedures

SLIDE 4 1. BACKGROUND Attendance at the workshops has been excellent, comprised mainly of technical SMEs from a broad range of industry stakeholders AEMO has circulated meeting notes from each workshop that capture industry stakeholder views to topics that were discussed at the workshops, including specific questions posed to workshop attendees. Workshop #1 (3-4 Feb) Identification of type 4 metering Validation and substitution for type 4 Sample metering Network device management requirements Emergency priority requirements Meter churn Workshop #2 (15-16 Feb) MSATS requirements Change Request Codes Objection code review B2B requirements RoLR requirements Network Tariff Code Updates Workshop #3 (2 Mar) Minimum Services Specification Embedded Networks Metrology Requirements – Revisited Metrology Part A – Jurisdictional Matters

SLIDE 5 1. BACKGROUND  Another workshop is planned on 17 March to discuss draft B2B Procedure changes A large quantity of information has been collected by AEMO at these workshops - AEMO is currently assessing this information as part of its update to the Procedures At this stage there are no further topics where AEMO needs further input and information from industry stakeholders to update the Procedures The next POC-PWG meeting is scheduled for April (as per the placeholder in the 2016 Industry Meeting Schedule)

SLIDE 6 2. PRE-CONSULTATION PAPER At the workshop on 2 March, AEMO indicated that would develop a Pre- Consultation Paper outlining its position on each of the topics discussed at the workshops (excluding B2B Procedures) The positions conveyed in this paper will be the same position that AEMO will take to formal consultation commencing on 22 April The paper will be released by 8 April, along with the new glossary and at least one sample procedure

SLIDE 7 3. PROCEDURE UPDATES The changes to the NER require that AEMO and the IEC create or amend existing procedures There are approximately 45 documents that need to created or amended, spread over three Work Packages Work Package 1 – to be published by 1 September 2016 o Metrology Procedures, Service Level Procedures, MSATS Procedures, B2B Procedures and Formatting Procedures Work Package 2 – to be published by 1 March 2017 o Accreditation and Deregistration Procedures, guidelines, etc. Work Package 3 – to be published by 1 December 2017

SLIDE 8 WORK PACKAGE 1 RefDocument New or Existing 1Meter Churn ProcedureExisting 2Network Device ProcedureNew 3Service Level Procedures for MDPExisting 4Service Level Procedures for MPExisting 5Metrology Procedure: Part AExisting 6Metrology Procedure: Part BExisting 7Minimum Services SpecificationNew 8Meter Data File FormatExisting 9Emergency Priority ProceduresNew 10Glossary and FrameworkNew 11MSATS Procedures: MDM ProceduresExisting 12MSATS Procedures: CATS Procedure Principles and ObligationsExisting 13MSATS Procedures: Procedure for the Management of Wholesale, Interconnector, Generator and Sample (WIGS) NMIs Existing 14NEM RoLR Process Part A - MSATS Procedure: RoLR ProceduresExisting 15B2B Procedure Customer and site Details Notification ProcessExisting 16B2B Procedure Service Order ProcessExisting 17B2B Procedure Technical Delivery SpecificationExisting 18B2B Procedure Technical GuidelinesExisting 19B2B Procedure Meter Data ProcessExisting 20B2B Procedure One Way Notification ProcessExisting

SLIDE 9 WORK PACKAGE 2 RefDocument New or Existing 21 MSATS Introduction GuideExisting 22 MSATS User Interface GuideExisting 23 Operating Procedures MSATS CATS History ModelExisting 24 Operating Procedures MSATS NMI Discovery Questions and AnswersExisting 25 Operating Procedures MSATS-CATS Hints and TipsExisting 26 Metering Service Provider Accreditation ChecklistExisting 27 Metering Service Provider Accreditation ProcedureExisting 28 Metering Service Provider Application Form (Part 2)Existing 29 Metering Service Registration Procedure (Part 1)Existing 30 Service Provider Compliance & Assessment and Deregistration ProcedureExisting 31 MC Application FormNew 32 Service Level Procedure for ENMNew 33 ENM Accreditation ChecklistNew 34 ENM Accreditation/deregistration procedureNew 35 ENM Application Form (Part 2)New 36 ENM Registration Procedure (Part 1)New 37 Metering Coordinator Registration Procedure (new)New 38 Metering coordinator default procedure (standalone?)New

SLIDE 10 WORK PACKAGE 3 RefDocument New or Existing 39 List of accredited ENMs in the NEMNew 40 Exemption Procedure - Type 4ANew 41 List of National Electricity Market Procedures, Guidelines, and Documents required by Chapter 7 Existing 42 Exemption Procedure - malfunctioning metering installationsExisting 43 National Metering Identifier ProcedureExisting 44 National Metering Identifier Allocation ListExisting 45 Role of the Responsible Person (MC) - explanatory infoExisting

SLIDE 11 CONSULTATION PROCESS OVERVIEW

SLIDE 12 CONSULTATION DATES Deliverable / MilestoneProjectDescription Planned date AEMC publish final rule determinationMRP10 Mar 16 AEMO pre-consultation workshops concludeMC,EN,MRP17 Mar 16 AEMO releases Pre-Consultation PaperMC,EN,MRP08 Apr 16 AEMO publishes notice of first stage consultation (B2B)B2B: MC,EN,MRP08 Apr 16 Industry Workshop PlaceholderTBC14/15 Apr 16 AEMO publishes notice of first stage consultationMC,EN,MRP22 Apr 16 Industry Workshop PlaceholderTBC16/17 May 16 AEMO concludes first stage consultation (B2B)B2B: MC,EN,MRP17 May 16 AEMO concludes first stage consultationMC,EN,MRP31 May 16 AEMO publish draft procedure determination (B2B)B2B: MC,EN,MRP16 Jun16 Industry Workshop PlaceholderTBC20/21 Jun 16 AEMO publish draft procedure determinationMC,EN,MRP30 Jun 16 AEMO concludes second stage consultation (B2B)B2B: MC,EN,MRP1 Jul 16 Industry Workshop PlaceholderTBC7/8 Jul 16 AEMO concludes second stage consultationMC,EN,MRP15 Jul 16 AEMO seeks IEC recommendation for B2B changes(B2B) MC,EN.MRPNo later than 1 Aug Jul 16 AEMO publishes final procedure determinationB2B) MC,EN,MRP12 Aug 16 AEMO publishes final procedure determinationMC,EN,MRPNo later than 1 September26 Aug 16

SLIDE 13 PROGRAM OVERVIEW – WP 2 Work package 2 pre-consultation to begin during the first consultation.

SLIDE 14 CONSULTATION TWO DATES* Tentative dates for consultation two. PoC workshop placeholder dates could be utilised for other work streams or projects - SMP | IEC as required. Deliverable / MilestoneProjectDescription Planned date Industry Workshop PlaceholderTBC16/17 May 16 Industry Workshop PlaceholderTBC20/21 Jun 16 Industry Workshop PlaceholderTBC07/08 Jul 16 Industry Workshop PlaceholderTBC20/21 July 16 Industry Workshop PlaceholderTBC22/23 Aug 16 Industry Workshop PlaceholderTBC08/09 Sep 16 AEMO publishes notice of first stage consultationMC,EN10 Oct 16 Industry Workshop PlaceholderTBC24/25 Oct 16 Industry Workshop PlaceholderTBC14/15 Nov 16 AEMO concludes first stage consultationMC,EN15 Nov 16 Industry Workshop PlaceholderTBC28/19 Nov 16 Industry Workshop PlaceholderTBC13/14 Dec 16 AEMO publish draft procedure determinationMC,EN14 Dec 16 AEMO concludes second stage consultationMC,EN03 Jan 17 AEMO publishes final procedure determinationMC,ENNo later than 1 March Feb 17

SLIDE 15 CLOSE Questions? Contact: