TRT (and a bit beyond) – Overview 1. TRT Desynchronization – [206248: 1 -> 206248: 533), elogelog – ROD firmware issue Reverted to the before-the-TS settings.

Slides:



Advertisements
Similar presentations
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Advertisements

Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
TRT Leak Repair Anatoli Romaniouk, EC leak tests Side C Side A 2.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
TRT Detector Status Report Konstantin Zhukov (Lebedev Physics Institute) for the ATLAS TRT group ID week, 19 May
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
ATLAS Inner Detector MO_B 2012 closure 2013 mid-year status 2014 request H. Pernegger / Pixel PL & ID Resource Coordinator D. Robinson / SCT PL and ID.
TRT active gas leak repairing F. Perez, C. Degeorge, S. Katunin, I. Zhukov, V. Myalkovskiy, S. Konovalov, A. Romaniouk, H. Danielsson, A. Catinaccio, K.
Anatoli Romaniouk TRT Introduction TRT in ATLAS p. 2-4TRT in ATLAS p. 2-4 TRT design p. 5-7TRT design p. 5-7 TRT operation principles p. 8-9TRT operation.
Main priorities for the next years. Where do we stand Muon system in good shape (in my opinion) – Sub-systems hardware quite robust (see later for main.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Active gas system status & plans. S.Konovalov, K.Zhukov, K.Vorobev.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Trigger & Tracking detector for CMS
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
MICE Spectrometer Solenoids Step IV running
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
Institute of Nuclear Physics Polish Academy of Sciences
Vito Palladino Straw Working Group 23/3/2015
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Mini-drawers, FE-ASIC , Integrator
TRT ROD Data Compression
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
Example of DAQ Trigger issues for the SoLID experiment
University of California Los Angeles
SVT detector electronics
Presentation transcript:

TRT (and a bit beyond) – Overview 1

TRT Desynchronization – [206248: 1 -> : 533), elogelog – ROD firmware issue Reverted to the before-the-TS settings to resolve the issue HV Crate issues – [215027: 1 -> : 268) : (TRT_NODATA_06, HV Crate in the barrel tripped and had to be replaced) – [215414: 1 -> : 163) : (TRT_NODATA_06, HV Crate tripped and had to be replaced) – An environmental / external issue? Lacquered contacts in the end of last year, no problems since then 100% in other runs, despite gas leaks and minor problems – Got a number of tolerable defects (TRT_BADGAS_01, TRT_BADGAS_02) Number of dead channels Is stable – within declared 2.7% (2.4%) TRT Days, June 20132

– Goal: 100kHz trigger high occupancy – Bottlenecks: Front End to ROD bandwidth – Changing from full readout mode (27 low threshold bits) to reduced mode (23 low threshold bits) increases trigger rate limit from 89 kHz to 105 kHz (ongoing activity) – Dropping last 4 LT bits – minimal impact on tracking (not losing the leading age) ROD processing rate – Event processing time proportional to occupancy due to on-board compression – Solutions include: » Increasing clock speed from 80 MHz to 100 MHz on compression chip increases bandwidth » Hard-coding common words to decrease occupancy that compression chip must process » Applying validity gate on all words to decrease overall occupancy ROD to ROS bandwidth – Extrapolation to high lumi indicates that this is not limiting factor – Optimization of compression table reduces load – Monitoring of fragment size in place 3TRT Days, June 2013

Increasing number of automatic resyncs during stable beams at end of 2012 (order once per hour) – May be caused by power instabilities in VME crate which affect sensitive components on ROD – Crates will undergo upgrade to increase current limits on relevant lines Maraton LV power supply upgrades (connector upgrade and internal wire replacement) – Rolling upgrade to be completed during LS1, currently on- schedule Sufficient number of spares 4TRT Days, June 2013

Increasing number of automatic resyncs during stable beams at end of 2012 (order once per hour) – May be caused by power instabilities in VME crate which affect sensitive components on ROD – Crates will undergo upgrade to increase current limits on relevant lines Maraton LV power supply upgrades (connector upgrade and internal wire replacement) – Rolling upgrade to be completed during LS1, currently on- schedule Sufficient number of spares 5TRT Days, June 2013

Upgrade the existing FastOr trigger – – Physics motivation: HIP (monopole, Q-ball…) Potential timeline 6TRT Days, June 2013

February’2012: crates 003 (tripped), found that crate 004 had similar damage – Crates in the same rack – external factor? – To solve the problem: HV pins were covered with lacquer November’2012: Two issues caused by the same problem – Small debris of Al / dust found on the board – The issues got addressed (cleaning + protection lacquer), no problems since then Have 3 spare crates (1 x USA15, 2 x SR1) – And a few spare HVM modules Lacquer all the contacts to prevent similar issues – Ongoing activity TRT Days, June 20137

Excellent work of TRT active gas team – Despite all the leaks, the DQ didn’t suffer TDR specs: Xe 100 l/day – Before early 2012 the leaks were a few times smaller – By the end of 2012 we got ~200 l/day Leaks – Stress corrosion enhanced by Ozone presence – Strategy discussions since few months, study insitu / repair during last few weeks Repair work finished TRT Days, June 20138

Repaired whatever was accessible – Both EC Side C / Side A TRT Days, June A1 crack along the pipe (PPF1 connector) PPF1 brackets Detector connector

10 Electronics Gas manifold Gas Straws/radiator Electronics Gas manifold Gas Straws/radiator Gas IN Gas OUTPEEK pipes shown in pink Places of stress EC wheel type A connectivity TRT Days, June 2013

Will do our best to start running in 2015 with in Xe mode only – Work is ongoing to automate active gas system operation 80 channels to regulate Adjustments of leaking channels have been done manually so far Can we stabilize leaks at 150 l/h? – Ar affects quite a few physics aspects (TR!) Had a combined Ar / Xe mode of operation in 2013 to study Will post a note summarizing this in the coming days – Electron ID, triggers are affected… – What about tracking with Ar? TRT Days, June

Resolution Ar is not affected) – Run : Ar/CO 2 /O 80/17/3, 1365 V – Barrel: mm (Xe) / mm (Ar) – EndCap: (Xe) / (Ar) TRT Days, June

Studies with both the TRT and at test stands – measurements of signal shapes for different gas mixtures and ASDBLR shaping options (report by X.Poveda link)link Main conclusion: afterpulses at 100 ns after the main pulse are observed if Xe shaping has to be used, more pronounced for high HV values – Different mixtures, HV settings (report by K.Vorobev link)link Study stability, gas gain limitations etc TRT Days, June

Very successful operation in Run 1 – Quickly prepared tools for Xe/Ar combined running Massive upgrades planned for LS1 (report by E.Banaś, Z.Hajduk, J.Olszowska link)link – As a part of general DCS upgrade (windows -> linux etc) Need to develop some TRT specific tools Constraints from central DCS Overall strategy for the LS1 upgrade – Fully reversible upgraded old DCS – All the time most of TRT hardware is under control Also will upgrade GGSS (report by B.Mindur link)link – Standard PCs, exchange of all existing internal PCI cards to internal ones, can replace straws if needed All proposed HW components are linux/windows compatible – Need to rewrite the core of GGSS so that it runs on linux TRT Days, June

TRT Days, June

Many discussions on how to operate ATLAS – See the “ATLAS Post-LS1 Operation Workshop” Fewer shifters – More information to look at (muon system will be completed + IBL + etc) – Better tools / more uniformity (or more headache during the operation) Updates of the CR layout, calibration procedures, shifters’ training etc etc etc – Will be (again and again) asking for inputs to make sure that TRT is properly taken care of by the shift crew TRT Days, June

Run 1 was success – Thanks to all the expertise and dedication of the TRT team: the team made the TRT a great detector! Will have things ready for the Run 2 – DAQ updates: get ready for high occupancies and rates (ongoing) – Hardware and firmware improvements Improved Maratons, HV crates, etc – Active gas system Possible repairs are (almost) done, have more work ahead (automation and optimization) Studies of Ar mixture, possible modes of operation are ongoing – eFastOr is progressing well TRT Days, June

BBQ Prevessin: – – Sign Sign TRT Days, June

TRT Days, June

Possible to stabilize most leaks. Need to control 2 parameters: – gas flow in a leaking channel Remote flow regulation? – pressure in the TRT outlet (pump inlet pressure) Need mbar accuracy (with the original requirement of 1 mbar) – precise pressure sensor – additional buffer for pressure sensor – pump input resistance regulation – cavern-USA pressure difference feedback to the pump operation Ar mixture blow out setup – Have a temporary setup operating for the pPb running Automate N2 removal (because of the TRT leak) TRT Days, June

Excellent performance even with extreme occupancies (plots taken from link)link TRT Days, June

TRT Days, June

Put Ar in few parts of the detector (both in barrel and EC) – Prepare tools / Learn from the operation / Save Xenon – Vary gas mixtures / HV settings to study operation Studies with the TRT and on a test stand Argon shaping issue – Mis-stuffed resistors in a fraction of EndCaps (and hence bit problems) – Under studies Xe->Ar => electron ID is affected – Argon can be operated with larger gain than Xe – Electron Drift-time for Ar is shorter than Xe – Transition Radiation absorption down by ~10 compared to Xe – Need to understand the consequences TRT Days, June

This is under study, but here are few points below – No TRT seeding hits for conversion finding => CPU time for conversion finding increases by a factor of 10 Overall, back tracking is affected – High-PT electron trigger affected Increase by 20-30% without HT hits HLT – Jpsi -> ee trigger affected Rates increase by a factor of 2 So…many things to try – Find / repair the EC – AND Cheaper Xenon (30% lower price) from the Russian supplier? – AND Optimize performance / study combined Xe / Ar operation effect on physics / etc TRT Days, June

8-13 March – ID End-plate leak search (CO2) 18 April – September – TRT gas leak repair work Developing tools… 18 February – November 2014 – Active gas racks test / modifications etc – Replacements of Maratons – PP2 replacement/tests/repair TRT Days, June