CCPC – Coal Plant Repowering with Fuel Cells September 29, 2014.

Slides:



Advertisements
Similar presentations
Source Separated Organic Materials Anaerobic Digestion Feasibility Study Prepared for Ramsey/Washington Counties Resource Recovery Project Board And the.
Advertisements

Transform PV to Load Capacity Status by Coupling PV Plants to CAES Plants James Mason Renewable Energy Research Institute ASES Forum on Solar and the Grid.
CO2 Capture Status & Issues
Carbon Management Research in UKy-CAER Supported by Carbon Management Research Group Kentucky EEC - DEDI ARPA-E US DOE International Collaboration US Department.
The SunAirCool Eco Power Station
GLENARM POWER PLANT REPOWERING PROJECT WORKSHOP
Installing Generation - Behind the Meter Chris Rogers Sega, Inc. November 6, KMEA Annual Conference.
Direct Reduction Iron Plant Group Golf Selimos, Blake A. Arrington, Deisy C. Sink, Brandon Ciarlette, Dominic F. (Scribe) Advisor: Orest Romaniuk 1.
DISTRICT HEATING: AN OVERVIEW PRESENTED BY: NIELSEN SYSTEMS APRIL 8, 2011.
PLANT DESIGN (I) Prof. Dr. Hasan farag.
B9 Coal Deploying Fuel Cells to Generate Cheap, Clean Electricity from Fossil Fuels.
This tutorial is a PowerPoint ® file which includes recorded narration. Automatic slide sequencing is coupled to the sound track. For the most effective.
Senior Design Presentation Direct Fe Reduction Iron Plant Group Golf Selimos, Blake A. Arrington, Deisy C. Sink, Brandon Ciarlette, Dominic F. (Scribe)
SINTEF Energy Research Power cycles with CO 2 capture – combining solide oxide fuel cells and gas turbines Dr. ing. Ola Maurstad.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
“Energy Efficiency Guide for Industry in Asia”
From Research to Application Best Practices George Teather and Suzanne Lafortune Performance Management Network Inc.
Post-Combustion CO 2 Capture using Solid Sorbents Sharon Sjostrom, Chief Technology Officer CREA Energy Innovations Summit, October 27, 2014 Carbon Capture:
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
POWER GENERATION TECHNOLOGIES
This tutorial is a PowerPoint ® file which includes recorded narration. Automatic slide sequencing is coupled to the sound track. For the most effective.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
By Coffman Electrical Equipment April Allows for simple integration with renewables.
Engineering Technology Division
Creating Energy-Efficient Data Centers
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
Economics – Why Today? Collecting data Additional information for request –Single vs multiple units –Quantity –Quality Future decisions Economic analysis.
Engineering Technology Division
Community Energy Independence Initiative Demonstration Project March 14, 2006.
WORKSHOP ON TECHNOLOGY PATHWAYS FORWARD FOR CARBON CAPTURE & STORAGE ON NATURAL GAS POWER SYSTEMS April 22, 2014 Revis W. James Director, Generation R&D.
Optimizing Greening Schools for a Carbon Constrained Future Presented to: The Association of California Construction Managers Presented by: Stephanie R.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
1 Atmospheric Vortex Engine Development and Economic.
Lansing Board of Water & Light REO Town Headquarters & Cogeneration Plant REO Town Cogeneration: Concept to Commercial Operation.
16 September 2015© IneosSlide 1 Energy Management at Grangemouth University of Strathclyde Thursday 22 nd March 2006 Colin Pritchard.
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
Carbon Neutral Energy from Waste Gasification Presented by Allen Medearis and Trip Dacus April 14, 2010 University of Tennessee at Chattanooga.
1 FUTURE EU ENERGY MIX - WILL COAL PLAY AN IMPORTANT ROLE? International Conference in Gliwice 29 May 2006 Matthias Dürr RWE AG.
2011 Governor’s Conference on Energy and the Environment LG&E and KU Carbon Capture and Storage Project September 27, /27/2011.
Clean Air Act Section 111(d) Indiana State Bar Association Utility Law Section September 4, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department.
Production of Ammonia Plant Feedstock From Natural Gas Team Charlie Michael Gardiner - Scribe Rami Qafisheh Alexandria Rinella – Team Leader Advisor: Orest.
FOOD ENGINEERING DESIGN AND ECONOMICS
Senior Design Presentation Direct Fe Reduction Iron Plant Group Golf Selimos, Blake A. Arrington, Deisy C. Sink, Brandon Ciarlette, Dominic F. Advisor.
Direct Reduction Iron Plant Group Golf Selimos, Blake A. Arrington, Deisy C. Sink, Brandon Ciarlette, Dominic F. (Scribe) Advisor: Orest Romaniuk 1.
On-Site Hydrogen Production From High-Pressure Liquids NHA Hydrogen Conference and Expo Ben Oster May 5, 2010.
Post combustion capture of CO 2 Nick Otter International Workshop on “Power Generation with CCS in India” Ashok Hotel, New Delhi, India 22 nd January 2008.
 Moving to Advanced Supercritical Plant & Capture-Ready Measures Dr P. Mahi; P. Napier-Moore Mott MacDonald.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
CHP Project Costs Screening Public Utility Commission of Ohio Public Utility Commission of Ohio Combined Heat and Power: Financial.
Ultra-Clean, Efficient, Reliable Power Potential Demonstration of MW-Class Electrochemical Membrane (ECM) Combined Electric Power And CO 2 Separation (CEPACS)
Demonstration of oxy-fuel combustion in once-through steam generators for CO 2 capture Carbon Capture & Storage Workshop 28 March, 2013 The High Commission.
1 Canadian Clean Power Coalition: Delivering Results for Over a Decade Presented to Alberta Innovates – Energy and Environment Solutions CCPC 19 December.
INTRODUCTION : 80% of total electricity produced in the world, is hydral, while remaining 20% is produced from nuclear, thermal, geo-thermal energy and.
1 Canadian Clean Power Coalition: Delivering Results for Over a Decade 3) Fuel Cell Repowering Results.
Progress Meeting 20 Nov 2012, Karlsruhe LEADER 1LEADER1 WP1 REFERENCE DESIGN OBJETIVES AND SPECIFICATION (SCK-CEN)
Introduction And Thermal Power Plant
Brownsville Overview Management Presentation November 2000
DISTRICT COOLING A promising and sustainable option for HFC phase-down
Costing and Project Evaluation
A biomass based 5 MW power plant operates on fuel wood
Victor Valley Water Reclamation Authority Biogas to Energy Project with Omnivore™ Digester Demonstration May 30th, 2013.
Energy Conservation CERD /12/2017
Delta Water Supply Project
Presentation transcript:

CCPC – Coal Plant Repowering with Fuel Cells September 29, 2014

Cost & Performance Review Agenda Introductions Project Basis Deliverables –BFD –Layout –Performance Data –Cost Data Further Work CCPC - PCC Capture using CEPACS | 2

Project basis Retrofit Lingan Generation Station to meet Federal CO2 emissions regulations of 420 kgCO2/MWh Currently 4 units generating 165 MW gross each Units 1 and 2 will be retired by 2019 PCC using CEPACS to be fitted to units 3 and 4 Assumed WFGD installed on units 3 and 4 Units 1 and 2 cooling water, switchyard and transmission capacity reused by retrofit CCPC - PCC Capture using CEPACS | 3

Integration Flue gas from LGS provides CO2 for CEPACS Excess heat from CEPACS provides BFW preheating for LGS Excess process water from CEPACS fed to LGS Net power production from CEPACS increases power output and net efficiency of LGS CCPC - PCC Capture using CEPACS | 4

CEPACS Process CCPC - PCC Capture using CEPACS | 5

Pre-Capture BFD CCPC - PCC Capture using CEPACS | 6

Post Capture BFD CCPC - PCC Capture using CEPACS | 7

Plant Layout CCPC - PCC Capture using CEPACS | 8

CO2 Mass Balance CCPC - PCC Capture using CEPACS | 9 Stream #Stream Name Existing Power Plant Retrofit with CEPACS 1Coal Fed 1 MTPD 2,947 2Power Plant Flue 2 MTPD 3,605 3Total Plant FlueMTPD 7,210 4To CEPACS treatmentMTPD 3,609 5Nat Gas CO 2 EquivalentMTPD 1,485 6CEPACS VentMTPD 862 7CO 2 CapturedMTPD 4,238 8Power Plant Untreated FlueMTPD 3,601 Notes: 1. As coal, two units of equal flow 2. As CO2, two units of equal flow

CO2 Product CCPC - PCC Capture using CEPACS | 10 PressureBar(a)153 Temperature°C50 FlowrateMTPD4,238 Composition HydrogenMol %0.29 NitrogenMol% 0.02 Carbon MonoxideMol%0.02 Carbon DioxideMol%99.66

Plant Performance Summary CCPC - PCC Capture using CEPACS | 11 Existing Power PlantRetrofit with CEPACS GenerationAux LoadGenerationAux Load Units 3 and 4 Gross PowerMW327.5 Auxiliary LoadsMW 17.0 Wet Flue Gas DesulfurizationMW 2.0 Additional power from BFW integrationMW 2.2 Net Power ExportedMW CEPACS Summary Gross DC Power GeneratedMW Auxiliary LoadsMW 27.4 InvertersMW 6.8 Transformer LossesMW 0.5 SW Cooling Water PumpsMW 1.6 Net CEPACS ExportMW Total Net Power GeneratedMW CO2 Intensitykg/MWh

Energy balance Existing Power Plant Retrofit with CEPACS Units 3 and 4 Coal InputMW935 Natural Gas InputNm3/h 31,537 NG Heating ValueMJ/Nm NG Energy InputGJ/hr (HHV) NG Energy InputMW 344 Total Energy InputMW 935 1,278 Net Power OutputMW Plant Net Overall Efficiency% HHV Base Plant Net Heat RatekJ/kWh10,906 10,828 Reduced Steam ExtractionMW 24.0 Heat Rate of CEPACS UnitkJ/kWh 9,260 Heat Rate Combined Power PlantkJ/kWh 10,356 CCPC - PCC Capture using CEPACS | 12

Utility Consumption CCPC - PCC Capture using CEPACS | 13 Existing Power Plant Retrofit with CEPACS Units 3 and 4 Total Site Sea Water Availablem3/h77,106 Quantity used by units 3 and 4m3/h38,55339,695 CEPACs Cooling Water Requiredm3/h 8,558 Total Site Sea Water Usedm3/h38,55348,252 Excess water from CEPACsm3/hr 25.9 Fresh Water Usage in Power Plantm3/hr10.4 Water Dischargem3/hr 15.4

Capital Cost CCPC - PCC Capture using CEPACS | 14 Item Capital Cost Nova Scotia Basis CAD (million) USGC Basis USD (million) CEPACS Utilities & Offsites Direct Field Costs Total Indirect Field Costs Total Field Costs HO Costs - FEED & Detailed Engineering Vendor Reps (Allow) Sub-Total Total Before Contingency Contingency Total Project Cost734513

Owners Costs CCPC - PCC Capture using CEPACS | 15 Owners costsCAD (million) Connections to Surrounding Infrastructure 1.0 Spare Parts Inventory 6.1 Commissioning and Start-up 36.7 Land 0.0 Environmental Permitting 2.0 Plant Mobile Equipment/ Furniture/ Laboratory and Shop Equipment 1.0 Owner's Project Management 2.0 Project Development 2.0 Operator Training 3.0 Insurance and Process Technology License Fees 5.0 TOTAL OWNER’S COSTS 58.8

Total Plant Investment and Opex Total Project CostsCAD (million) Plant Installed Cost (Table 6-1)734 Owners Costs (Table 6-2)58.8 Initial Catalyst & Chemicals0.04 Total793 CCPC - PCC Capture using CEPACS | 16 Annual Operating Cost Nova Scotia Basis CAD (million)USGC Basis USD (million) 26.9*20.5* Note: Excludes costs for 22 plant staff and operators

Acknowledgments EPRI for the use of the PCC Retrofit study on the Lingan generating Station FCE for data on the cost and performance of the CEPACS technology CCPC - PCC Capture using CEPACS | 17

Acknowledgments EPRI for the use of the PCC Retrofit study on the Lingan generating Station FCE for data on the cost and performance of the CEPACS technology CCPC - PCC Capture using CEPACS | 18

Further work to Commercialize CEPACS Market survey to review locations for CEPACS installations. Optimise design for CO 2 product to meet pipeline product specifications. FEL 0 study - cost and performance for PCC retrofit using amine to meet 420 kgCO 2 /MWh. Review lab studies, to make CEPACS suitable for installation and the most likely locations identified in item 1. Optimisation study on integration of CEPACS technology considering for example: CO 2 recirculation; air enrichment FEL 1 study on commercial scale plant to develop a ±30% to ±40% estimate Confirm with FCE size of CEPACS “demonstration unit” Locate suitable host site for demonstration unit Carry out FEL 2 study on host site to develop a ±20% to ±30% estimate, opex utilities and power produced, generate permitting data and develop estimate for FEL 3 study. Secure funding for FEL 3 package Secure site, air and construction permits Execute FEL 3 package to generate ±10% estimate, Proceed with EPC activities CCPC - PCC Capture using CEPACS | 19

Representative Sketches from FCE Overall CEPACS unit Enclosure Cutaway Enclosure Cross Section CCPC - PCC Capture using CEPACS | 20

CEPACS Principles Slide 21 CCPC - PCC Capture using CEPACS | 21

Overall CEPACS Unit CCPC - PCC Capture using CEPACS | 22

Enclosure Cutaway CCPC - PCC Capture using CEPACS | 23 ENCLOSURE 75’ W, 200’ L, 57’ H SECTION 140’W, 272’ L

Enclosure Section CCPC - PCC Capture using CEPACS | 24