Expert Workshop on Benchmarks and Chapter IV of the Operational Guidelines 2 – 3 April 2007.

Slides:



Advertisements
Similar presentations
Results of January 2007 Meeting of Working Group on the Questionnaire and Indicators 24 January 2007.
Advertisements

Technical skills and competences
1 SESSION 3 FORMAL ASSESSMENT TASKS CAT and IT ASSESSMENT TOOLS.
FEASIBILITY STUDIES INFORMATION SESSION. OVERVIEW  Background and approach the feasibility studies  Guidelines ♦Discussion of terms of reference ♦Sustainability.
Strategic Planning An Overview. General Definition The process of strategic planning involves deciding where you want to go, how you want to be positioned,
Chapter 2 Analyzing the Business Case.
World Heritage Periodic reporting Latin America and the Caribbean Carolina Castellanos / Mexico.
General Analysis of the (European) Questionnaire Jorun Poettering Consultant WHC.
Project Monitoring Evaluation and Assessment
8. Evidence-based management Step 3: Critical appraisal of studies
Consistency of Assessment
Results of January 2007 Meeting of Working Group on the Questionnaire and Indicators 24 January 2007.
Research Ethics Levels of Measurement. Ethical Issues Include: Anonymity – researcher does not know who participated or is not able to match the response.
Analyzing the Business Case
WRITING A RESEARCH PROPOSAL
Evaluation of Math-Science Partnership Projects (or how to find out if you’re really getting your money’s worth)
4.12 & 4.13 UNDERSTAND DATA-COLLECTION METHODS TO EVALUATE THEIR APPROPRIATENESS FOR THE RESEARCH PROBLEM/ISSUE Understand promotion and intermediate.
Corporate Governance: Beyond Compliance at a time of Recession Prof. Ashley G. Frank BA(Econ)[Magna Cum Laude], MDPA (Cum Laude], MBA, MCom [Cum Laude],
2nd meeting WH Periodic Reporting Reflection Year Monitoring Indicators for Cultural World Heritage sites ICOMOS Discussion points.
Internal Auditing and Outsourcing
Writing a Research Proposal
JIC ABET WORKSHOP No.4 Guidelines on: II Faculty Survey Questionnaire.
Chapter 1 Marketing Strategy Chapter 1 Strategic Market Planning.
S/W Project Management
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
Measurement in Exercise and Sport Psychology Research EPHE 348.
Urban Design Goals: Produce a high quality living environment for all residents. Clarify and enhance the relationship between new housing development and.
ITEC224 Database Programming
 RESEARCH TOPIC  Read and analyze FUTURE SCENE  I. IDENTIFY CHALLENGES  II. SELECT AN UNDERLYING PROBLEM  III. PRODUCE SOLUTION IDEAS  IV. SELECT.
Classroom Assessment A Practical Guide for Educators by Craig A
Trends in Corporate Governance Dr. Sandra B. Richtermeyer, CMA, CPA President, Institute of Management Accountants (IMA) June 21, 2011.
Irene Khan – Secretary General Building effective and responsive INGOs, the strategic role of HR: The IS Job Value Review 8 February 2008.
Evaluating a Research Report
The National Development Plan, Iraq 6 July 2010 “Developing Objectives & Indicators for Strategic Planning” Khaled Ehsan and Helen Olafsdottir UNDP Iraq.
Let’s Talk Assessment Rhonda Haus University of Regina 2013.
INTERNATIONAL UNION FOR CONSERVATION OF NATURE World Heritage renomination Presentation to the first leadership committee of the Ha Long Bay-Cat Ba Alliance.
Quantitative SOTL Research Methods Krista Trinder, College of Medicine Brad Wuetherick, GMCTE October 28, 2010.
Performance-Based Assessment HPHE 3150 Dr. Ayers.
Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.
PORTFOLIO ASSESSMENT OVERVIEW Introduction  Alternative and performance-based assessment  Characteristics of performance-based assessment  Portfolio.
Rubrics. What is a Rubric? A rubric is a set of guidelines for scoring performance against criteria. Performance is described along a scale of quality.
Management Effectiveness and Quality Criteria in European Protected Areas: April 2008 World Heritage Convention and the Assessment of Management Effectiveness.
 Field Experience Evaluations PSU Special Educator Programs Confidence... thrives on honesty, on honor, on the sacredness of obligations, on faithful.
Copyright © Allyn & Bacon 2008 Intelligent Consumer Chapter 14 This multimedia product and its contents are protected under copyright law. The following.
1 Chapter 2. Toward an Ideal System Long-Term Care: Managing Across the Continuum (Second Edition)
Winter 2011SEG Chapter 11 Chapter 1 (Part 1) Review from previous courses Subject 1: The Software Development Process.
Environmental Systems and Society Internal Assessment.
Market Research Market Research – What is it? Gathering information on (for example)… …finding new markets …evaluating public opinion …gaining insight.
Monitoring and Evaluation in the GMS Learning Program 7 – 18 May 2012, Mekong Institute, Khon Kaen, Thailand Randy S. Balaoro, CE, MM, PMP Data Collection.
Checklists EDUC 307. What is an Observation Checklist?  The observation checklist is a strategy to monitor specific skills, behaviors, or dispositions.
Presentation of Nominations to the World Heritage Committee by the Advisory Bodies Presentation by ICOMOS Paris, January 2013.
GENERAL ASSEMBLY OF STATES PARTIES TO THE WORLD HERITAGE CONVENTION 17 th e ASSEMBLEE GENERALE DES ETATS PARTIES A LA CONVENTION DU PATRIMOINE MONDIAL.
2 e Periodic reporting exercise for Europe Sub-regional workshop for Central, Eastern and South-Eastern Europe Tbilissi 14 – 16 November 2012.
UNESCO INSTITUTE for STATISTICS Indicators for the Periodic Reporting Working group on the simplification of the Periodic Reporting questionnaire
GENERAL ASSEMBLY OF STATES PARTIES TO THE WORLD HERITAGE CONVENTION 17 th e ASSEMBLEE GENERALE DES ETATS PARTIES A LA CONVENTION DU PATRIMOINE MONDIAL.
Measurement Chapter 6. Measuring Variables Measurement Classifying units of analysis by categories to represent variable concepts.
Module 9 Monitoring and Evaluation Tuesday, Oct 14, 2013 Ngo Thi Loan and John Carter.
OUTSTANDING UNIVERSAL VALUE
Options for harmonizing national reporting to biodiversity-related agreements Peter Herkenrath UNEP World Conservation Monitoring Centre.
Evaluation of New World Heritage Nominations
Processes related to the Second Cycle of Periodic Reporting Sub-regional Workshop for World Heritage National Focal Points in Central, Eastern and South-Eastern.
Main conclusions of the previous Meetings on World Heritage Periodic Reporting Reflection Meeting of the Periodic Reporting Reflection Year UNESCO Headquarters,
Periodic Reporting Reflection Experts Group (PRREG)
Classroom Assessment A Practical Guide for Educators by Craig A
The revised Periodic Reporting Questionnaires: general features Alessandra Borchi Policy and Statutory Meetings Section UNESCO World Heritage Centre.
WORLD HERITAGE - EXPERT MEETING ON BENCHMARKS
Writing Survey Questions
CHAPTER 10 Testing Introduction
CHAPTER 10 Testing Introduction
Civil Contractors Federation ‘2014 Earth Awards’ Submission Template CATEGORIES 1 and 2 ONLY Company Name (NOTE: if an Alliance then the name of the.
Presentation transcript:

Expert Workshop on Benchmarks and Chapter IV of the Operational Guidelines 2 – 3 April 2007

Benchmarks (targets): Is this Where we should be focusing our energy? Monitoring the State of Conservation and Management of World Heritage Sites seems to be the more promising focus (Chapter IV) Integration of the concepts of monitoring not just to Chapter IV, but also to all of the other World Heritage processes, in particular the Nomination Process (Chapter III) and the Periodic Reporting Process (Chapter V) Introduction

Definition (American Heritage Dictionary) 1. A standard by which something can be measured or judged 2. often bench mark A surveyor's mark made on a stationary object of previously determined position and elevation and used as a reference point in tidal observations and surveys Usually used to describe an industry standard/standards Tend to not change or at least not quickly/often For our own purposes, “Target” may be a better word as it is more flexible and does not imply one standard across all sites The selection of benchmarks/targets is only one small part of the overall monitoring process Benchmarks

Monitoring: Measuring Change Over Time Outstanding Universal Value (based on Statement of Significances and Criteria) Attributes that Carry the OUV Adequate Management of Site ExternalTreats

Attributes are the same ones with which we measure authenticity/integrity Tangible or Intangible – –Physical fabric of the building (tangible) – –Skyline or roofscape (tangible) – –Relation of open space to built up area (tangible) – –Construction know-how (intangible) Sites inscribed under Criterion vi may or may not have tangible attributes – –Example Robben Island Attributes

Monitoring: Measuring Change Over Time Outstanding Universal Value (based on Statement of Significances and Criteria) Targets (Benchmarks) Attributes that Carry the OUV State of Conservation and Management Indicators of Conservation and Management Adequate Management of Site ExternalTreats

Qualitative Indicators – –Photos, drawings, descriptions compared over time Quantitative Indicators – –Example: Percentage of Buildings in Good Condition Yes/No Indicators – –Example: Management Plan – Yes or No Indicators and Their Targets

Physical fabric of the building – –Structural and surface conditions of building adquate (qualitative) – –Number of buildings in good condition (how many is enough) Skyline or roofscape – –No encroachment of tall buildings (yes/no) Relation of open space to built up area – –Square meters of open space to built up areas (what is the proper ratio) – –Existing open spaces protected (yes/no) Construction know-how – –Number of young people learning the construction system (how many is enough??) Indicators and Targets

Nomination Process – –States Parties should develop nomination dossiers that include descriptions of attributes that carry OUV and indicators and targets for assessing change over time – –ICOMOS/IUCN must assess these as part of their evaluation to be reviewed and agreed to by the Committee Periodic Reporting Process – –Sites which have these mechanisms at inscription can measure changes over time – –Sites without can develop these mechanisms as part of the Periodic Reporting Process Reactive Monitoring Process – –Mechanisms should be developed as a matter of course during all reactive monitoring missions Process

In many cases, the indicators/targets already developed as part of the monitoring process will be sufficient for tracking identified problems In specific cases, an unforeseen threat may develop which require new indicators/targets to be developed Corrective measures can then be developed and adjusted over time to ensure that the State of Conservation is improving over time (as measured by the indicators) Corrective measures can be developed and introduced both at the Reactive Monitoring phase and the In-Danger phase Reactive Monitoring and In-Danger Listing

Final Thoughts A monitoring system may be quite complex so the Committee should be as clear as possible as to what it expects from site managers We need to avoid using jargon as much as possible We need to ensure we use the same language and processes across the various World Heritage processes such as nominations and inscriptions, periodic reporting, reactive monitoring, in-danger listing, etc. (for example, the periodic reporting questionnaires should be consistent with what is asked for during nominations and reactive monitoring)

Conserving culture, promoting diversity for more information: