CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND.

Slides:



Advertisements
Similar presentations
Solomon William KAMUGASA
Advertisements

Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
H. MAINAUD DURAND CLIC ACTIVE PRE-ALIGNMENT SYSTEM: PROPOSAL FOR CDR AND PROGRAM FOR TDR.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
A Laser Based Alignment System for the CLIC project
CLIC. Hélène MAINAUD DURAND| SU pendant LS1 day| | INDICO | page 2 Activities CLIC LAMBDA project (Laser Alignment Multi-Based Design.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
H. SCHMICKLER Alignment challenges for a future linear collider.
H. MAINAUD DURAND, BE-ABP/SU, 23/04/2010 STATUS OF THE CLIC PRE-ALIGNMENT STUDIES.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
CLIC alignment studies OUTLINE CLEX Alignment of the components Impact of beam on sensors readings Long term stability of the supports (girders, DB quad)
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
H. MAINAUD DURAND PACMAN WP1 OUTLINE Tasks & role of associated partner Plans for training.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
Status of MDI+BDS Cost Estimate Lau Gatignon. Summary ItemkCHFComments 4 QD0 magnets1340But replaceable item! IP feedback system610Preliminary Pre-alignment.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
RUDE Vivien With the help of Hélène MAINAUD-DURAND And Mateusz SOSIN BE/ABP/SU CLIC MODULE September 19, 2011 Présentation REPORT OF THE CURRENT TESTS.
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Short range alignment strategy in CLEX and first results CLIC Workshop January 2015 on behalf of : Hélène Mainaud-Durand, Mateusz Sosin Mathieu.
Deformations and Movements of CERN installations Mark Jones M. Jones, 28/10/2015 FCC Infrastructure and Operation Meeting.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
FP7: EuCARD after a year of preparation… A.Jeremie.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team QD0 and BDS pre-alignment.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
CLIC08 Workshop, CERN October 2008 PRE-ALIGNMENT STUDY STATUS AND MODEL FOR THE BEAM DYNAMICS SIMULATIONS TS/SU/MTI Thomas TOUZE Hélène MAINAUD DURAND.
PACMAN : technical objectives Hélène Mainaud Durand.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team oWPS versus cWPS OUTLINE Introduction oWPS cWPS Results of inter-comparison tests
Two-beam module layout
CLIC Parameter Working Group Two Beam Module Design
ALIGNMENT OF THE NEW TRIPLETS
on behalf of the CLIC active pre-alignment team
PACMAN impact on future module design
SLAWG #15 ZS fiducialisation and alignment today
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
TZ32 tunnel H. MAINAUD DURAND, BE-ABP/SU CTC 07/07/2009.
List of changes and improvements for the next generation CLIC module
A.Jeremie Some drawings from different CLIC’08 presentations
Towards a common mechanical interface
Alignment challenges for a future linear collider
M. Modena, CLIC Stabilization Day # 10, 14 September 2010
Presentation transcript:

CLIC survey and alignment studies 1 CTC meeting, 13 th January 2009 STARTSLIDE CLIC Survey and alignment studies Jean-Pierre QUESNEL, Hélène MAINAUD DURAND

CLIC survey and alignment studies 2 CTC meeting, 13 th January 2009 Objectives for the feasibility  R & D plan concerning the CLIC active pre-alignment, approved in October 2007 by Daniel Schulte and Jean-Pierre Delahaye.  Reference of the document: edms n°  4 objectives to fulfill before 2011: The mechanical alignment of the elements to the supporting girder with precision of a few microns, in an industrial way. A method of precise fiducialization must be found The alignment needs to be very precise over at least 200m (max. amplitude 10 microns over 200m in the main linac (over 400m in the BDS) an optimization of the cost, as well as an integration of the solutions.  Between 2011 and 2012: consolidation of the solutions foreseen and latest results due for the feasibility study.

CLIC survey and alignment studies 3 CTC meeting, 13 th January 2009

CLIC survey and alignment studies 4 CTC meeting, 13 th January 2009  Friedrich LACKNER [ – ] is a Dr-Ing. specialized in mechanics, working as a fellow on the following topics: - The methods to align the components on the girders - The fiducialization (study of the interfaces between the pre-alignment sensors and the object to be aligned, proposal of a method of fiducialization) - The definition of the technical requirements concerning the movers and the testing of the compatibility of the solution with stabilization, for the module & MB quad of the TBTS. - The validation of the WPS prototype.  Thomas TOUZE [ – ] is a surveyor, whose doctorate subject is the following: “proposition d’une méthode d’alignement de l’accélérateur linéaire CLIC: des réseaux de géodésie au pré-alignement actif”) and is working on: - The proposal of a global concept for CLIC alignment in all areas - The simulations of the corresponding alignment uncertainties - The determination of these uncertainties on all the facilities  Sébastien GUILLAUME [ – ] is a ETHZ doctorate student who will study the effects of the gravity on the alignment systems, and will undertake special studies concerning the accuracy which can be obtained concerning the determination of the geoïd. Ressources  Prolongation / Replacement to foresee

CLIC survey and alignment studies 5 CTC meeting, 13 th January 2009  Due to delays concerning: the doctorate cost (arrival later than foreseen) [20 kCHF] the associated works on gravimetric effects [20 kCHF] delays with the optical system developped in collaboration with NIKHEF [30 kCHF]  carry over of 70 kCHF of 2008 budget to  Total cost for 2009 budget: 300 kCHF instead of 230 kCHF. (à vérifier) Budget Collaborations  With NIKHEF concerning the development of a laser based alignment system: some difficulties encountered with the NIKHEF representative (NIKHEF patent, development of a 3 point alignment system dedicated to seismology) Jos Engelen should help to redefine clear bases for a real collaboration  With other labs developing WPS and HLS sensors, in order to launch an inter-comparison between sensors. A dedicated mini workshop will be held at CERN on the 2 nd and 3rd of April  Web site:

CLIC survey and alignment studies 6 CTC meeting, 13 th January 2009  Mini workshop on sensors in order to launch the inter-comparison between labs concerning WPS and HLS, in the frame of CLIC (with a common interest ILC)  Results following the upgrade of the TT1 facility  Confirm the radial deviation theory (due to the rotation of the Earth)  Modelize the vertical shape of a wire without the HLS system  Alignment simulations using these results (paper for PAC 2009)  Results of the optical WPS (feasibility of an « absolute » WPS)  First results of a modular laser system based on speckle effects and filters.  Results of astromical and gravimetric measurements to define the geoïd  A proposal concerning the supporting of the main beam quadrupoles (pre-alignment + stabilization)  Design, installation, and first results of a longer facility in the TZ32 tunnel. Web site of the survey and alignment study: Objectives for 2009