November 30 th London/Spain Webminar: Railway Infrastructure in the UK Spanish construction and railway industry 1 Jim Steer Director & Founder, Steer.

Slides:



Advertisements
Similar presentations
Using High Speed Rail to Achieve Connectivity and Integration Prof Andrew McNaughton.
Advertisements

Eddingtons implications for transport funding Dr Adam Marshall Head of Policy, Centre for Cities National Transport Conference, 16 Oct 07.
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
High Speed Two: Engine for Growth Peter Fry Public Affairs Manager – HS2 Ltd.
2009 Priorities & issues John Dickie Crossrail 2 Supporting London’s growth.
Securing a safe, sustainable rail network Michael Roberts Chief Executive.
HS2 and Airports Peter Fry, Public Affairs Manager HS2 Ltd CIC Economic & Policy Forum 17 Feb
Railway Industry Association British Railway Industry - Competences
Priorities for Rail Investment in the East Midlands Andrew Pritchard Director of Policy & Infrastructure February 2012.
Who’s Who in Yorkshire and the Humber
Hugh Chaplain Transport for Greater Manchester / Rail North Thursday 6 th November 2014.
THE PLANET99 MODEL DEMAND AND REVENUE FORECASTING TOOL FOR RAIL OPERATORS 8th EUROPEAN EMME/2 USERS CONFERENCE Jeremy Douch GIBB Transport Planning May.
Cross London Rail Links Ltd. Crossrail the Challenge Keith Berryman 20 December 2005.
Strategic Transport Infrastructure for South East England
EU policy on urban mobility - one size fits all? Transport policy in European cities: experiences, challenges, options: Merseyside, UK Neil Scales Chief.
HS2 A National Strategy for High Speed Rail Prof Andrew McNaughton.
Transport for London London Overground Southwark Rail User Group Monday, 17 th November 2008.
Prof Andrew McNaughton HS2 Ltd Technical Director 1 Developing HS2.
High Speed 2 The decision and next steps Jonathan Mitchell.
High Speed Rail for Nottingham Nottingham City Council June /9/20151.
25th November 2014 PTRC London 1 Jim Steer Director Greengauge 21 Director HSR Industry Leaders HS2 – more than a railway HS2: Building in the benefits.
The Great Transport Debate The Rail Network Michael Roberts Chief Executive, ATOC.
The variable cost approach to pricing John Thomas Deputy Director, Economic Regulation Office of Rail Regulation, UK 9 July 2004.
Rail and the West Midlands Economy EMTA Conference Birmingham, 11/11/11 Peter Sargant Head of Rail Development, Centro.
Runways – 7 July Paul Harwood
1 Delivering a 21 st century railway Anna Walker, Chair, ORR National Rail Conference: Cracking the Capacity Problem, 5 July 2012.
‘How can we make better use of existing rolling stock fleets?’ Tim Burleigh Relationship Development Manager, Eversholt Rail Group ACoRP ‘Radical approaches.
Action for business, by business Action For Business – Tameside Friday 30 th November 2012.
Crossrail 2 – A New Railway for London and the South East Public Consultation Philip Keen June 2013.
UK Infrastructure: An Update & Forward Look UK Infrastructure Conference – 2 nd December, 2013 UNCLASSIFIED Paul Skinner Chairman, Infrastructure UK.
Transport Update Chris Carter Transport Strategy Manager.
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
The Regional Transport Strategy Transport for Regional Growth Conference Edinburgh 5 November 2015 John Saunders SEStran.
1 Date SINTROPHER Regional Workshop David Morgan.
9th November 2010 ICEA 1 Jim Steer Director, Greengauge 21 Director, Steer Davies Gleave ICEA 9 th November 2010 The case for High Speed Two (and three.
High Speed 2 The decision and next steps. Background As per the Coalition commitment, the Government developed a proposed strategy for a high speed rail.
An Overview of the Smart Metering Programme in GB.
General Election 2010 What the Parties Say – Transport.
Railway Infrastructure Financing and PPPs November 2015.
Crossrail 2 London Assembly Regeneration Committee.
Kent Route Director Andrew Munden November Agenda Introduction Network Rail’s Role Network Capacity Network Constraints Timetable Development Process.
Crossrail: Station Accessibility Matthew Lodge 10 July 2013.
/18-Feb-161 Response of Surface Access Providers – Network Rail Chris Rowley, Principal Strategic Planner (L&SE)
Gridlock? – Transport in 2030 Solving Congestion in South East England 14 th November, 2007 Adrian Shooter Chairman, ATOC.
Gerald Jennings President Leeds Chamber of Commerce 18 th February 2016 HS2 Leeds The right place for the station in Leeds.
BIM on a new railway HS2 Jon Kerbey Director, BIM HS2 Ltd.
UK Government Plans for Infrastructure Geoffrey Spence CEO, Infrastructure UK.
Nottingham Workplace Parking Levy Sue Flack Director for Planning and Transport.
April 2016 HSR Workshop York 1 Jim Steer Director Greengauge 21 HS2 Objectives “what are the economic, operational (especially capacity and connectivity)
HIGH SPEED UK..connecting the nation Colin Elliff BSc CEng MICE Civil Engineering Principal, HSUK  Quentin Macdonald BSc(Eng) CEng MIET FIRSE.
Land Transport Infrastructure Integration. TfL’s purpose Meet the rising expectations of our customers and users Plan ahead to meet the challenges of.
High Speed Two Ltd responsible for developing and promoting the UK’s new high speed rail network
Andrew Pritchard Director of Policy & Infrastructure East Midlands Councils 24 TH FEBRUARY 2016.
HS2 in the East Midlands Stephen McFarlane HS2 Ltd Greater Nottingham Transport Partnership Forum 24th February 2016.
TfN Freight AND RAIL UPDATE
Rail North Manchester Airport Transport Forum
How can we encourage more private investment in Britain’s railways?
Strategic Transport Forum Friday 15th September 2017
Local Government Association
Railway Infrastructure Financing and Public-Private Partnerships
The Freight RUS - a draft for consultation
Sir Terry Morgan CBE Chairman, Crossrail
Kent Route Director Andrew Munden
Midlands Connect: A Pan Midlands Strategic Transport Partnership
Initial Strategic Business Plan July 2006
Capital Update Department for Education Julian Wood Alice Lakeman
Delivering East West Rail
East Coast Route Study November 2016 update.
Eoin O’Neill Rail infrastructure at the heart of Britain’s growth
Kent Route Study – Draft for Consultation
Presentation transcript:

November 30 th London/Spain Webminar: Railway Infrastructure in the UK Spanish construction and railway industry 1 Jim Steer Director & Founder, Steer Davies Gleave Upper Ground London, SE1 9PD

November 30 th London/Spain Overview Ι Organisation of the rail sector Ι Current key issues ■ Funding ■ Value for money ■ Franchising Ι Main projects ■ London area ■ National network ■ High-speed rail

November 30 th London/Spain Key Players

November 30 th London/Spain Organisation Ι Network Rail ■ Regulated ■ Raises its own finance ■ Revenue determined by an independent rail regulator  From TOCs  From government grants ■ Contracts out all major maintenance and upgrades Ι TOCs ■ Franchises (7.5 – 15 year duration) ■ Open access Ι Roscos

November 30 th London/Spain Key current issues Ι Funding – CP4 just agreed by government (through to 2015) Ι Value for Money – review underway (Sir Roy McNulty) major concerns Ι Franchising – policy consultation just completed

November 30 th London/Spain DfT business plan 12th November 2010 ‘Structural Reform Priorities ‘ 1. Deliver the Coalition’s commitments on high speed rail Carry out the preparation needed to start work on a high speed rail line early in the next Parliament connecting London with Heathrow, Birmingham, Manchester and Leeds, as the first step towards a national high speed rail network for the whole of Britain 2. Secure our railways for the future Secure the sustainability of the railway and create capacity for improvement of services, by addressing the high cost of the UK railway compared with other railways and comparable industries; continue to invest in Crossrail and Tube upgrades in the capital 3. Encourage sustainable local travel 4. Tackle carbon and congestion on our roads 5. Promote sustainable aviation

November 30 th London/Spain DfT overall planned expenditure 2011 – 2015 Source Dft business plan £bn Baseline 2010/ / / / /15 Total departmental Administration spending Programme spending Capital spending

November 30 th London/Spain DfT expenditure Plan to 2014/5 Ι £18 billion of rail investments, including Crossrail; Ι £4 billion on HA major projects, capital maintenance and enhancements; Ι £6 billion on local transport major projects, capital maintenance and Ι enhancements; Ι Funding for a further tranche of PFI projects and Ι Funding to ensure the Tube upgrades will go ahead.

November 30 th London/Spain major rail schemes to go ahead source DfT October 2010 Ι Crossrail will go ahead to the original scope; delivery programme for the central tunnel works extended by around 1 year; project to cost no more than £14.5bn (£1bn savings identified). Ι High Speed Rail Subject to consultation, the Government will proceed with plans for a national high speed rail network, spending over £750m up to 2015 Ι Major station upgrades totalling £2.1bn: Birmingham New Street, London Kings Cross, Reading redevelopment and Gatwick Airport stations. Ι Network improvements : Midland Main Line & East Coast Main Line.

November 30 th London/Spain DfT Business Plan (extracts) ‘Plans for securing a sustainable railway’... i Report on the value for money April 2011 ii Develop and publish detailed proposals on delivering a sustainable railway including reform of Network Rail November 2011 Change rail franchise terms to give operators the incentive to deliver better services, better stations, longer trains and better rolling stock December 2010 Support further capacity improvements and electrification of the rail network i Announce way forward on Intercity Express Programme, Thameslink, new rolling stock and electrification November 2010 ii Provide funding to TfL, to support infrastructure investment in the London Underground and Crossrail April 2011 – March 2015

November 30 th London/Spain What might come out of franchise policy review? In response to the questions asked Because of wider questions (Sir Roy McNulty’s review etc) Lengthier franchisesTesting of vertical integration Scope to vary the service offerDifferent approach (liberalised?) for ‘intercity’ franchises Transfer obligations to franchiseesPressure for TOC cost savings TOC-led rolling stock procurementFares increases (already announced) In some cases, infrastructure mgmt 11

November 30 th London/Spain Overview Ι Organisation of the rail sector Ι Current key issues ■ Funding ■ Value for money ■ Franchising Ι Main projects ■ London area ■ National network ■ High-speed rail

November 30 th London/Spain 13 Forecast all Rail Crowding in London and the South East during the Morning Peak 2026 (inward flows and load-factor – all services)

November 30 th London/Spain Thameslink

November 30 th London/Spain 15 Thameslink and Crossrail on the same scale!

November 30 th London/Spain The new Birmingham New Street

November 30 th London/Spain Freight – gauge enhancement schemes

November 30 th London/Spain Tyne and Wear Metro

November 30 th London/Spain High Speed Rail: DfT business plan milestones Ι London – Birmingham HS2 timescale ■ Consultation Dec 2011 ■ Complete engineering design April 2013 ■ Environmental assessment & consultation September 2013 ■ Hybrid bill through Parliament May 2015 Ι Birmingham – Manchester & Leeds ■ Consultation Dec 2014 ■ Complete engineering design (est) April 2016

November 30 th London/Spain High Speed One completed Nov

November 30 th London/Spain 21

November 30 th London/Spain HS2 Key facts Ι 207 km ■ Stations at Euston, Old Oak, Birmingham International, Birmingham Curzon Street ■ HSR rolling stock depot (Birmingham) ■ Connection northwards to West Coast Main Line (Lichfield) Ι Mean capital cost estimate £16.5bn (2009 prices) Ι Northern Limbs of the ‘Y’ ■ Manchester 140 km capex £5.1bn ■ Leeds 174 km capex £5.8bn Ι Benefit cost ratio for HS2 2.4:1 DfT, 2009 discount year and prices 22

November 30 th London/Spain Programme Ι Formal consultation in the new year – on the London – West Midlands scheme and (in parallel) wider HSR strategy/rationale Ι ‘spade in the ground’ by 2015 Ι Opening mid 2020s Ι Northern Limbs of the Y-shaped network mid 2030s ■ Manchester 140 km capex £5.1bn ■ Leeds 174 km capex £5.8bn Ι Also needs a programme of works on the existing northern section of the West Coast Main Line (uncosted) 23

November 30 th London/Spain Key Players Ι Secretary of State for Transport Rt Hon Phillip Hammond MP Ι Chairman HS2 Ltd Sir Brian Briscoe Ι CEO HS2 Ltd Allison Munroe Ι Chief Engineer HS2 Ltd Prof Andrew McNaughton Ι Advisers to HS2 Ltd: ■ Arup ■ Systra/MVA ■ Mott Macdonald ■ Ernst & Young ■ Booz 24

November 30 th London/Spain 25 Thank you