LUIS MERCADO UMASS 7/10/09 HAPPEX DAQ / 18-bit ADCs.

Slides:



Advertisements
Similar presentations
PAN Accurate Monitoring 1.HAPPEX Analysis Strategy 2.Code 3.Main features 4.To come 5.Demo (beta version) HAPPEX Collaboration Meeting 7 Dec, Antonin.
Advertisements

Beam Monitors Info from John Musson on new cavity receivers Other monitor issues.
18 Bit ADC Status Collaboration meeting May 18, 2007.
Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Robert Michaels HAMC Hall A Analysis Workshop 09 C HAMC = Hall A Monte Carlo ROOT / C++ Design Somewhat like SAMC & genercone For HRS only. Uses LeRose.
Lumi Analysis for HAPPEx III / PREX Presented by: Luis Mercado UMass - Amherst 5/18/2007.
Parity Quality Beam (PQB) April 07, Notes: 1.For each BPM, the wires are: +X+, +X-, +Y+, +Y- 2.There are only two injector BPMs we are not reading:
GlueX Collaboration Meeting October 2-4, 2014 Trigger System Update R. Chris Cuevas Trigger Hardware/Firmware Status  Hardware Status  Performance Test.
M. Dracos LNGS, 03 August Target Tracker. M. Dracos LNGS, 03 August Rate tests SM1 Sensor (1,3,4) no signal Plane 6 absent Sensor (1,2,7)
Noise Analysis for PREx - Pb Radius Experiment Presented by: Luis Mercado UMass - Amherst 6/20/2008.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 24, 2007.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Real-time Parity Feedback John Hansknecht & Riad Suleiman April 28, 2009.
TRIUMF Qweak Electronics Des Ramsay Nov Status of Electronics November, 2008  36 VME modules (# 001 and # ) delivered to JLab  001, 003,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Hall A DAQ meeting January 12 th Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus.
News on GEM Readout with the SRS, DATE & AMORE
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
PREX Issues. Outline New issue: souce systematics and Aug. 07 run. Update on old issues. Progress at SU.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Moller Polarimeter Upgrading for PREx in 1)Mollar Analysis & Upgrading Works during/after 2009 PVDIS 2)Flash ADC based DAQ dead-time measurement.
Re-designing the Helicity Board Riad Suleiman Injector Group March 19, 2009.
NEMO-O DE NEMO First results from the NEMO Test Site G. Riccobene, for the NEMO Collaboration The NEMO Collaboration is performing the Phase 1 of the project,
HAPPEX/Lumi PMT Studies Luis Mercado UMASS 7/10/09.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
Trigger sources in ODIN (new firmware)
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
RHICf Japan meeting General status
Data Acquisition (DAQ) Status
Online Software Status
Hall A Compton Electron detector overview
DAQ Architecture Design of Daya Bay Reactor Neutrino Experiment
Noise Analysis for PREx - Pb Radius Experiment
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
UK CMS Oversight Committee Mtg
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
B. Genolini for the IPNO detector dept.
BCM test in low current for g2p
Beam Position Noise from 500 keV MBO0I06 Dipole Sensor
Presentation transcript:

LUIS MERCADO UMASS 7/10/09 HAPPEX DAQ / 18-bit ADCs

Full DAQ System

Crate was taken from Injector and installed in Left arm the first week of July. Currently networked but need to run MPS, helicity and ADC cables. Left Arm Detectors.

18-bit ADCs have been installed for use with Cavity Monitors (V-mode), Lumis and Right Arm Detectors (I-mode). Proper Lumi-ADC setup was tested Jan’08 to achieve minimum pedestal noise.

Has been revived. Now have CODA configs with and w/o Qweak Crate to facilitate standalone tests. Will only use Helicity signals in this crate.

Conducted tests with 1KHz MPS. Concluded we can run at 2 kHz, or 200 Hz with ovs of 10, or 240 Hz with ovs of 8. Maybe higher but needs to be investigated.

Current Plans Deploy remaining 18-bit PREX ADCs. Add all crates to GreenMonster GUI. Incorporate G0/Qweak data Analysis into PAN. Revive synchronization checks using Bryan Moffit’s method. Create documentation for shift crew.

Latest 18-bit ADC News

New 18-bit ADCs Now have about 10 fully functional 18-bit ADC boards. Have deployed 7 of them and have 3 spares.  4 in R-HRS (2 for cavities, 2 for lumis).  3 in Counting Room (for BCMs and BPMs). Will be receiving 7 more boards from Ed J. in the next few days, bringing our total to 17 boards.

Testing of 18-bit boards. Setting and recording proper pedestals offsets in a database. Studying pedestal noise with respect to gain setting (as low as 12ppm). Only about 10 of the 64 available gain settings have noise below ~20ppm. Will modify front-end resistor to change I-mode range to those needed by detectors.

Future DAQ Tests Need to run high rate tests with full HAPPEX3 config. Checks of new helicity sequence board. Full synchronization checks. Pedestal Studies (helicity-correlated noise).

Acknowledgements Robert Michaels Krishna Kumar Kent Pashke Dustin McNulty Bryan Moffit HAPPEX/PREX Collaboration