PXD EVO November 18, 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:

Slides:



Advertisements
Similar presentations
H.-G. Moser Max-Planck-Institut fuer Physik 2 nd open meeting July 4, 2008 Report on PXD Session.
Advertisements

Stoimen Stoimenov QA Engineer SitefinityLeads, SitefinityTeam6 Telerik QA Academy Telerik QA Academy.
ESODAC Study for a new ESO Detector Array Controller.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
From Concept to Silicon How an idea becomes a part of a new chip at ATI Richard Huddy ATI Research.
Development and Quality Plans
Development plan and quality plan for your Project
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Design Completion A Major Milestone System is Presented to Users and Management for Approval.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
2. Super KEKB Meeting, DEPFET Electronics DEPFET Readout and Control Electronics Ivan Peric, Peter Fischer, Christian Kreidl Heidelberg University.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Research & Technology Implementation TxDOT RTI OFFICE.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
DESIGN CONSIDERATIONS FOR CLICPIX2 AND STATUS REPORT ON THE TSV PROJECT Pierpaolo Valerio 1.
Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
LCWS08, Chicago, November 2008 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Active Pixel Sensors - Status and Plans - Ladislav Andricek for the DEPFET.
65 nm CMOS analog front-end for pixel detectors at the HL-LHC
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
The Belle II DEPFET Pixel Detector
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
1 Level 1 Pre Processor and Interface L1PPI Guido Haefeli L1 Review 14. June 2002.
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
Jorgen Christiansen, CERN PH-ESE 1.  EPIX ITN proposal did not get requested EU funding ◦ CERN based proposals did very bad this time. ◦ I better not.
1 EMCM Measurements Florian Lütticke, Martin Ritter, Felix Müller.
1 Tests of EMCM Felix Müller on behalf of the MPP / HLL TestCrew (H.-G. Moser, C. Koffmane, M. Valentan) Belle II PXD – ASIC Review October , 2014.
1 Updates of EMCM Testing J. Haidl, C. Koffmane, F. Müller, M. Valentan 8th Belle II VXD Workshop September University of Trieste.
KIT – Universität des Landes Baden-Württemberg und nationales Forschungszentrum in der Helmholtz-Gemeinschaft Status of ASICs.
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
RD53 1.  Full/large demonstrator chip submission ◦ When: 2016 A.Early 2016: If chip must have been fully demonstrated in test beams for TDRs to be made.
Hybrid Boards for PXD6 5th International Workshop on DEPFET Detectors and Applications Sept Oct Christian Koffmane 1,2 1 Max-Planck-Institut.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
Simulation of a DEPFET Pixel Detector IMPRS Young Scientist Workshop July, 26 – 30, 2010 Christian Koffmane 1,2 1 Max-Planck-Institut für Physik, München.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
1 Characterization of Pilot Run Modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik IMPRS Young Scientist Workshop Ringberg.
6 th Belle PAC, KEK, February 26 and PXD - EVO, 5/March/2012 Ladislav Andricek, MPI für Physik, HLL 1
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
PXD ASIC Review, July 2015 Ladislav Andricek, MPG Halbleiterlabor Belle II PXD ASIC Review, the 2 nd …….. 1.
1 Test of Electrical Multi-Chip Module for Belle II Pixel Detector DPG-Frühjahrstagung der Teilchenphysik, Wuppertal 2015, T43.1 Belle II Experiment DEPFET.
Ysterious apping ess Florian Lütticke On behalf of the test beam crew 20th International Workshop on DEPFET Detectors and.
Tomasz Hemperek, STATUS OF DHPT 1.0 PXD/SVD Workshop 5 th February 2013.
DEPFET workshop, Kloster Seeon, May 2014 Summary 1 Highlights Technical Coordination TB report schedule remarks.
1 First large DEPFET pixel modules for the Belle II Pixel Detector Felix Müller Max-Planck-Institut für Physik DPG-Frühjahrstagung der Teilchenphysik,
DEPFET Workshop, May 2016 Ladislav Andricek, MPG Halbleiterlabor 1 o Documentation o Transition to “Production Mode” o Please update docu and place it.
ASICs1 Drain Current Digitizer Chip (DCD) Status and Future Plans.
SUBJECT : DIGITAL ELECTRONICS CLASS : SEM 3(B) TOPIC : INTRODUCTION OF VHDL.
Design Completion A Major Milestone
Status of DHP prototypes
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Latest results of EMCM tests / measurements
Markus Friedl (HEPHY Vienna)
WBS 1.03 Readout Systems Scope, Cost and Schedule
7th Belle II VXD Workshop, Prague
Data Handling Processor v0.1 First Test Results
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Hans Krüger, University of Bonn
VMM Update Front End ASIC for the ATLAS Muon Upgrade
Upgrade of the ATLAS MDT Front-End Electronics
Development of the Data Handling Processor DHP
Mark McKinnon EVLA Project Manager
Presentation transcript:

PXD EVO November 18, 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers: Gary Varner (Hawaii) Wladislaw Dabrowski (AGH Krakau) Valerio Re (Uni Bergamo, INFN Pavia)

PXD EVO November 18, 2014 Sensor and ASICs 2 Switcher Control of gate and clear 32 x 2 channels Switches up to 30V AMS 0.18 µm HV technology DCDB Amplification and digitization of DEPFET signals 256 input channels 8-bit ADC per channel 92 ns sampling time UMC 180 nm DHP Signal processor Common mode correction Pedestal subtraction 0-supression Timing and trigger control TSMC 65nm (first version IBM 90nm) DEPFET sensor 250 x 768 pixel 50µm x 55µm (min) 50µm x 80µm (max) 75µm thick

PXD EVO November 18, 2014 Charge 3 The review should assess the production readiness of the three ASICs used in the Belle II PXD. The schedule requires a submission of the final AISCs early In order to achieve this one has to assess: The maturity of the chip design. Completeness and quality of documentation. Status of performance tests (stand alone and on system level). Known problems and mitigation/correction plans. Missing measurements and tests. Work plan (responsibilities, milestones). Schedule for next submission. QA strategy. It is likely that the review will conclude that there are still some issues to be resolved before a submission can be done. In this case the risks for the detector performance need to be evaluated. A clear strategy should be developed how to achieve the goal of timely submission. Following issues need to be discussed: General introduction in the chip design and specifications Summary of tests and performance information Design changes planned for the next submission Information on QA strategy (information on yield expectations, test programs, status of test equipment, its documentation)

PXD EVO November 18, 2014 Schedule 4 Assemble Pilot Run modules with existing ASICs: April 2015 ASIC submission in June 2015 Series module assembly to start in November 201 ASIC submission date close to end of the present funding period! Copper processing of main batches can start after test! Overall scheduleAll sensors produced and tested till February 2016 Module/Ladder assembly starts in November 2015 All ladders produced till May 2016 PXD shipment to KEK in August Months contingency (assuming Phase II starts in December 2016 )

PXD EVO November 18, 2014 Switcher 5 General comments: Generally in good shape: Concept proven Performance: only concern is speed of Clear signal Required changes look modest Concern regarding radiation hardness of the HV transistors We endorse performing detailed tests of the Gated Mode operation

PXD EVO November 18, 2014 Switcher (specific comments) 6 The maturity of the chip design: Quite mature. Completeness and quality of documentation: Comprehensive Specification document lacking. Reference Manual is a good start, needs to be expanded to include performance requirements. Status of performance tests: Additional Gated Mode testing needed. Further radiation hardness testing likewise needed. Known problems and mitigation/correction plans: Main issue understood and plausible corrective plan proposed. Needs to be implemented. Missing measurements and tests: Addressed above. Work plan (responsibilities, milestones): Recommend clarifying test program leading to ASIC revision. Designer needs to clarify scope of modification, which will drive the schedule. Schedule for next submissions: June submission plausible, if consistent with above estimates. QA strategy: General test plan looks reasonable. The committee expresses concern regarding the proposed ASIC modifications to support multiplexed testing (additional HV-LV conversion, output multiplexing).

PXD EVO November 18, 2014 Switcher 7 Recommendations: End users should review Reference Manual for completeness Are pin table listings sufficient? Interface control description adequate? Recommend creating Hardware Description Language description of Gating functional Concern regarding radiation hardness of the HV transistors: We endorse performing detailed tests of the Gated Mode operation We recommend investigating long-term burn-in/stress testing of HV operation Actions: ‘end users’ to send comments to Christian Kreidl (?) till end of the year? Ivan to provide hardware description language Irradiations: Karlsruhe? Mannheim? When? Tests of gated mode with hybrid 4 and EMCM started (Eduard Prinker). Conclusive tests need PXD9 modules (April). Who can setup a long term test?

PXD EVO November 18, 2014 DCD 8 General comments: Basic architecture looks well suited to the requirements The committee expresses serious concerns about the details of the ADC implementation Unclear if problems observed are sensitivities to process parameters Further design work needed

PXD EVO November 18, 2014 DCD (specific comments) 9 The maturity of the chip design. We foresee significant additional design effort to address concerns regarding the ADC implementation Completeness and quality of documentation: A comprehensive Specification Document is lacking. Reference Manual is a good start, needs to be expanded to include performance requirements. Status of performance tests: Strongly recommend further testing to understand variety of pathologies observed. Further ASIC/channel testing statistics are needed. Known problems and mitigation/correction plans: Matching of observation with simulation is mandatory. Missing measurements and tests: More an issue of understanding results observed that missing measurements. Encourage further, cross-checked analyses. Work plan: Highly important that before next submission these problems are fully understood, to avoid excessive risk in resubmission. Schedule for next submissions: Given the above concerns, a February submission seems very aggressive. Items above must be resolved prior to submission. Verifying Monte Carlo spreads will likely take time, and sufficient time should be allocated. QA strategy: Generally looks OK.

PXD EVO November 18, 2014 DCD 10 Recommendations: Better understanding of noise performance and instabilities needed Consider an SEU test of the DCD More work is needed prior to a next submission. Submission schedule should be driven by the readiness to address the above issues. Careful consideration should be given to assess risk versus rewards of the changes proposed. Actions: Update documentation: Ivan? More measurements (on hybrid, EMCM): who can contribute? Simulations: Ivan? Irradiation tests (incl. SEU): together with Switcher?

PXD EVO November 18, 2014 DHPT 11 General comments: Specifications still not concisely presented Overall architecture looks very sound Cannot put all effort on the ASIC side. System engineering of cabling and interconnects, and an agreed-upon model for output load is needed. Complexity makes testing difficult

PXD EVO November 18, 2014 DHPT (specific items) 12 The maturity of the chip design: Data flow, PLL, synthesized logic are very mature. Remaining concern is in the verification of the high- speed interfaces. Completeness and quality of documentation: Specifications for output loads and timing are needed for signals in Table 1 of the Manual. For such a complex device, a more comprehensive document many be required. Status of performance tests (stand alone and on system level): Most IP Block / Task items test results well documented. Remaining issues well presented. Known problems and mitigation/correction plans: Proposed further testing seems adequate. Missing measurements and tests: Finer step TID testing, SEU testing. Channel masking and Overflow handling tests self-identified. Work plan: Not clear who is doing what to provide further testing and by when. A detailed model of the cabling needed to complete output driver redesign. Schedule for next submissions: June submission seems plausible given proposed testing schedule. A rigorous internal review of the proposed changes should be held prior to release for submission. QA strategy: Proposed quality control plan seems adequate.

PXD EVO November 18, 2014 DHPT 13 Recommendations: Characterize the electrical properties of the external interconnects and cables Actions: Complete documentation. Complete performance tests (hybrid, EMCM, PXD9). Characterization (and measurement) of external interconnects. Further measurements and optimization of external links. TID and SEU tests (take into account spectrum of neutrons ).

PXD EVO November 18, 2014 Summary 14 Documentation needed for all ASICs Design issues: DCD: simulations of ADC performance needed Measurements: more setups/manpower needed DCD: more statistics DHPT: communication with DCD/switcher: gated mode sequences Support: characterization of data links Irradiation tests (incl. SEU)