Phase Drift Compensation with sub-picosecond Precision over an Optical Link of 3 km for the AWAKE Experiment 06/11/2015 LLRF15, Phase Drift Compensation.

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

Synchronization system for CLIC crab cavities Amos Dexter, Ben Woolley, Igor Syratchev. LCWS12, UTA October 2012.
Particle Accelerator Engineering, London, October 2014 Phase Synchronisation Systems Dr A.C. Dexter Overview Accelerator Synchronisation Examples Categories.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
RF Synchronisation Issues
Measurements with laser at MPP and updates on RF synchronization Reported by Heiko Damerau (CERN) Measurements jointly with J. Moody, P. Muggli (MPP),
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Linac 4 LL RF Hardware Architecture and Design Status
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
The AWAKE Project at CERN and its Connections to CTF3 Edda Gschwendtner, CERN.
INTRODUCE OF SINAP TIMING SYSTEM
Status of RF synchronization and fast trigger distribution Reported by H. Damerau (CERN) Acknowledgements: J. Moody, P. Muggli (MPP), D. Barrientos, T.
Volker Schlott SV84, LL-RF Workshop, CERN, October 11 th, 2005 Femto-Second Stable Timing and Synchronization Systems Volker Schlott, PSI Motivation –
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Micro-Research Finland Oy MRF Timing System Jukka Pietarinen Timing Workshop CERN February 2008.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Frank Ludwig, DESY Content : 1 Stability requirements for phase and amplitude for the XFEL 2 Next LLRF system for optimized detector operation 3 Limitations.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
LLRF for EUCARD Crab Cavities Graeme Burt (on behalf of Amos Dexter) Paris May 2011.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
WELCOME TO IHEP. RF Phase Control for BEPCII Linac Accelerator Wenchun Gao.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
BCC-35 A.K. Bhattacharyya, A. Butterworth, F. Dubouchet, J. Molendijk, T. Mastoridis, J. Noirjean(reporter), S. Rey, D. Stellfeld, D. Valuch, P.Baudrenghien.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
AWAKE synchronization with SPS Andy Butterworth, Thomas Bohl (BE/RF) Thanks to: Urs Wehrle (BE/RF), Ioan Kozsar, Jean-Claude Bau (BE/CO)
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
Status of the RF System 09/03/2016 AWAKE RF Status2 D. Barrientos, T. Bohl, A. Butterworth, H. Damerau, W. Höfle, T. Levens, J. Molendijk, S. Rey, U.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
AWAKE: A Proton-Driven Plasma Wakefield Acceleration Experiment at CERN C. Bracco on behalf of the AWAKE collaboration C. Bracco - ICHEP2014.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Recent LLRF Developments at CERN and New Projects Wolfgang Hofle on behalf of BE-RF-FB and BE-RF-CS Section LLRF'15 Shanghai, China - W.Hofle CERN Lab.
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
Feasibility Study of the AWAKE Facility at CERN Edda Gschwendtner, Chiara Bracco, Brennan Goddard, Malika Meddahi, Ans Pardons, Elena Shaposhnikova, Helga.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Sub-10 fs RF Regulation at REGAE Matthias Hoffmann for the LLRF team Low Level Radio Frequency Workshop 2015 Shanghai,
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
AWAKE Run 2 : 1) Interstage considerations 2) CALIFES as plasma technology test facility Erik Adli and Carl A. Lindstrøm University of Oslo, Norway AWAKE.
CI Lecture Series Summer 2010 An Overview of IQ Modulation and Demodulation Techniques for Cavity LLRF Control.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
RF acceleration and transverse damper systems
Electron acceleration behind self-modulating proton beam in plasma with a density gradient Alexey Petrenko.
LLRF Research and Development at STF-KEK
An X-band system for phase space linearisation on CLARA
RF Synchronisation Issues
WP02 PRR: Master Oscillator and RF Reference Distribution
Beam dynamics requirements after LS2
Compact linear accelerator FLUTE: status update
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
AWAKE Experiment at CERN
Presentation transcript:

Phase Drift Compensation with sub-picosecond Precision over an Optical Link of 3 km for the AWAKE Experiment 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision... 2 D. Barrientos, J. Molendijk Acknowledgments to: T. Bohl, A. Butterworth, H. Damerau, E. Gschwendtner, W. Höfle, T. Levens

Outline Motivation About AWAKE SPS AWAKE Synchronisation Fibre link Phase Drift Compensation Drift Measurements Simplified Concept Component Selection & Scheme Calibration Design Details Status & Outlook 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision... 3

Motivation – Cavities vs. Plasma Today’s RF cavity / microwave technology: gradient <100 MV/m LHC: 5 MV/m ILC: 35 MV/m CLIC: 100 MV/m Several tens of kilometres for Future Linear colliders 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision... 4 Use Plasma as ‘cavity’! Gradients in Plasma up to 1000x higher SLAC experiment: 50 GV/m (e - driver) CLIC 3 TeV  48 km ILC 0.5 TeV  31 km Ez Self modulation instability P+ in a plasma creates a wakefield

About AWAKE Advanced Proton Driven Plasma Wakefield Acceleration Experiment High energy Proton beam to drive the wakefield results in a much longer plasma length First Proton driven wakefield experiment worldwide 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision... 5 AWAKE installed in former CNGS Facility (CERN Neutrinos to Gran Sasso)  CNGS physics program finished in 2012

SPS AWAKE Synchronisation SPS beams must be delivered at AWAKE in synchronism with the AWAKE e - RF system and the laser pulse rate. Via 3 km fibre optic links SPS RF (point 3) receives: RF reference frequency (~400 MHz) Common frequency F c between AWAKE RF and SPS RF (f rev SPS / 5 ~ 9 kHz) Laser repetition rate (~10 Hz) At flat top SPS RF executes: «Course» re-phasing (< SPS T RF )using F c «Fine» re-phasing (down to 10 ps) requires RF reference frequency received from AWAKE to be stable within <= 1 ps Extraction pulse generation synchronized with Laser rep-rate This talk concentrates on the most critical the RF reference frequency transmission. 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision... 6 BA3 AWAKE ~ 3 km

Fibre Link Phase Drift Compensation – Drift Measurements A series of measurements were made using our Vector Voltmeter VME module* to evaluate the typical phase drift of a fibre link round trip from the SPS faraday cage to AWAKE and back. Total fibre length = 6288 m Issues both with the temperature recording and the phase detector range caused the data of some periods to be un-exploitable. 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision... 7 Φ deg T °C t * EDA using AD8364 (mag) and AD8302 (phase)

Fibre Link Phase Drift Compensation – Drift Measurements 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision T °C Φ deg T °C

Fibre Link Phase Drift Compensation – Simplified Concept 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision... 9

Fibre Link Phase Drift Compensation – Simplified Concept 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Ideal Procedure (stepped delay line with fine delay) Regulate both analogue fine delays of Tdf and Tdr to keep  = 0 Once the fine delay gets close to the limit Insert a course delay step on the concerned delay (outside of SPS cycle) Let the regulation loop restore  = 0

Fibre Link Phase Drift Compensation – Component Selection 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Main Critical Components are: Programmable Delay Lines Fine granular sub ps resolution. Course range 10 ns Part to part reproducibility (tracking) Phase Discriminator Good sensitivity Copper to Optical Interfaces Good availability Common Characteristics Low Jitter (< 1 ps) Using noise immune differential signalling

Fibre Link Phase Drift Compensation – Component Selection 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Programmable Delay Lines Criterion Fine granular sub ps resolution. Part to part reproducibility (tracking) SY100EP196 (MICREL) was retained due to: Analogue fine tune-able 0-30 ps + digital 10 ps steps 10 ns range (10 bit) Typical RMS jitter 0.2 ps (max <1 ps) Linearity +/-10%LSB (~ +/-1ps) > 3GHz rated MC100EP196 (ON Semiconductor) was NOT selected: Typical RMS jitter 3 ps Poor Linearity MICREL®

Fibre Link Phase Drift Compensation – Component Selection 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision X-OR Phase Discriminator Good sensitivity -> PECL about 800 mV/180° MHz X-OR gate MC100EP08 was retained due to: Typical jitter 0.2 ps (max <1 ps) Fully differential LVPECL operation > 3 GHz rated Low cost

Fibre Link Phase Drift Compensation – Component Selection 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision... 14

Fibre Link Phase Drift Compensation – Component Selection 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Copper to Optical Interface Profit from newer low-cost technologies Previous Experience: LLRF LHC uses older pig-tail TX / RX STX-24-PST-B & SRX-24-PST-B (OCP) SONET OC-24 Max raw Bit-rate 1.3 Gbps Mfgr. Spec. RMS Jitter UI = ~3.8 ps Much better with stable clocks vs data! Implement generic SFP cage equipped with for example: Low cost: FTLF1321P1BTL (Finisar) SONET OC-48 λ = 1310 nm (mono-mode fibre) Max raw Bit-rate = 2.67 Gbps Mfgr. Spec. RMS Jitter UI = ~2.6 ps Much better with stable clock operation Measured TX+RX 10Hz to 100MHz J SFP ~ 400 fs (Actually only of interest up-to 100kHz)

Fibre Link Phase Drift Compensation – X-OR Scheme 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Valid approach if delay controls have perfect delay tracking. Imperfections will cause drift when course stepping one delay line (end of analogue control range) How to calibrate Tdf = Tdr? Or worse Tdf = Tdr + Offset? (when Tff ≠ Tfr small delta) X-OR

Fibre Link Phase Drift Compensation – Calibration 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Add one delay line to create 90° phase shift in one branch T 90° Added circuits to enable calibration. 1:4 Fanout Buffer, NB6L14 (3 GHz) 2 x 2 Crossbars, NBSG72A (>7 GHz) Both devices member of the new ON Semiconductor series

Fibre Link Phase Drift Compensation – Calibration 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Phase 1: Calibrate T 90° Set T 90° Delay to a reasonable value Connect phase detector to T 90° Delay driven from reference source only Search for E = 0 by varying T 90°

Fibre Link Phase Drift Compensation – Calibration 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Phase 2: Equalise Delay lines T df = T dr Connect phase detector to the reference source via T df, T dr & T 90° Search for E = 0 by varying either of Delay lines T df or T dr

Fibre Link Phase Drift Compensation – Calibration 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Phase 3: Beam based calibration Using Operational Connections Both phase 1 & 2 introduce small errors due to device output skew (5 ps typ) Additionally we may have Tff ≠ Tfr Add a small delay offset to one Tdf or Tdr delay to remove residual drift.

Fibre Link Phase Drift Compensation – Design Details 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Circuits in critical path have separate linear regulated supplies: V CCA (+3.3V source) V TTA (+1.3V sink for LVPECL terminators) Use complementary X-OR outputs representing +E and -E Common references for both ADC driver level shifters ADC drivers optimal dynamic range 2.5V/180° => ~0.019 ps / LSB (16 bit ADC and Subtraction of the Digital +E with -E eliminates LVPECL and reference offsets / drifts in both branches LPF out [V]ADC-P [V]ADC-N [V] LPF AD7903 Dual Diff 16 bit ADC

Fibre Link Phase Drift Compensation – Critical Path 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision cm

Status & Outlook 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision The Phase Drift Compensation System design is currently frozen The PCB design layout is being finalized at this moment A dual x 3 km fibre link test system has just been received Cabled proto-types expected by mid December Initial hardware lab tests with the fibre link test system by end 2015 Early 2016 Installation of one system in the AWAKE laser room Later 2016 start of Phase 1 experimental program with SPS beam … Dual 3 km test link setup

Thank You for your Attention 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision... 24

Backup Slides 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision... 25

Fibre Link Phase Drift Compensation – Component Selection 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision MC100EP196 limitations are: Random jitter performance 3 ps Non linear analogue fine delay Non monotonic non linear steps ON Semiconductor® D. Valuch CERN BE/RF MC100EP195 step delay measurements using Agilent E5071C on SPS Damper Loops module EDA-02917

Fibre Link Phase Drift Compensation – Component Selection 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Test results FTLF1321P1BTL (Finisar) Signal quality measurement using SSA E5052B Keysight comparing the Phase Noise of: E4428C Agilent (red) Same but through SFP test fixture (green & black) Green VME power- supply Black E3620A HP ext. supply From 10Hz to 100MHz J SFP ~ 400 fs -100 dB -120 dB -140 dB 1Hz1kHz 1MHz

Fibre Link Phase Drift Compensation – Component Selection 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Test results FTLF1321P1BTL (Finisar) Signal quality measurement using SSA E5052B Keysight comparing the Phase Noise of: E4428C 400MHz (background) SFP connected to fibre test system. Transceiver powered by ext. E3620A HP supply From 1Hz to 100kHz J SFP+FF+FR ~ 190 fs 1Hz100Hz 10kHz -120 dB -100 dB -60 dB 10Hz1kHz100kHz Signal quality measurement done through 2 x 3 km fibre test system with an optical splitter midway dB

Fibre Link Phase Drift Compensation – Component Selection 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Signal quality measurement test setup: 2 x 3 km fibre with an optical splitter midway. FTLF1321P1BTL TX RX

Fibre Link Phase Drift Compensation – ADC Driver 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision U1 + U2 = ADA Analog Devices 18 bit ADC Driver

AWAKE Experimental Program Phase 1: Understand the physics of self modulation instability processes in plasma. Phase 2: Probe the accelerating wakefields with externally injected electrons. 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision laser pulse proton bunch gas plasma Laser dump SPS protons 10m SMI Proton beam dump Laser Proton diagnostics BTV,OTR, CTR p Plasma cell  Rb vapour source Proton beam  drives the plasma wakefield + undergoes self-modulation instability.  LHC-type proton beam, 400 GeV/c, 3E11 protons/bunch,,  = 400 ps long Laser beam:  ionizes the plasma + seeds the self-modulation instability of the proton beam.  4.5 TW laser, 100 fs

AWAKE Experimental Program Phase 1: Understand the physics of self modulation instability processes in plasma. Phase 2: Probe the accelerating wakefields with externally injected electrons. 06/11/2015 LLRF15, Phase Drift Compensation with sub-picosecond Precision Laser dump e-e- SPS protons 10m SMI Acceleration Proton beam dump RF gun Laser p Proton diagnostics BTV,OTR, CTR e - spectrometer Plasma cell  Rb vapour source Proton beam  drives the plasma wakefield + undergoes self-modulation instability.  LHC-type proton beam, 400 GeV/c, 3E11 protons/bunch,  = 400 ps long Laser beam:  ionizes the plasma + seeds the self-modulation instability of the proton beam.  4.5 TW laser, 100 fs Diagnostics  BTVs, OTR, CTR Electron source and beam  Witness beam to ‘surf’ on the wakefield and get accelerated  16 MeV/c, 1.2 E9 electrons/ bunch,  = 4ps long Electron spectrometer system