Logo area Preparation meeting for the International Review of the Inner Triplet Quadruples (MQXF) for HL-LHC P Ferracin, J.Ph. Tock, E Todesco 2016-05-18.

Slides:



Advertisements
Similar presentations
F. Savary. FSY - ColUSM #51 – Outline Mandate of the review panel Composition of review panel Programme Main outcomes/recommendations Actions.
Advertisements

LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
HL-LHC/LARP: International Review of the Inner Triplet Quadrupole (MQXF) Design Executive Committee Report International Review Committee held at CERN.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
Joint HiLumi LHC-LARP Meeting – October 26-30, 2015 MQXFA Functional Requirements Ruben Carcagno October 30,
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
HL-LHC Annual Meeting, KEK, 11/21/14WP3 Summary – G. Sabbi 1 Work Package 3 Summary GianLuca Sabbi, Ezio Todesco 4 th HiLumi LHC – LARP Annual Meeting.
Dipole review, January Dipole design review: outlines of talks Gijs de Rijk, Francois Kircher and Jean- Michel Rifflet.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
FCC EuroCirCol kick-off,CERN, 3 rd June 2015.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
HL-LHC QXF Conductor/Cable Internal Review. Thank You First of all, let me thank everybody for accepting an extended work time and have this meeting over.
MQXF Workshop on Structure, Alignment, and Electrical QA – Feb 2-4, 2016 Requirements and feedback form LARP structure review Ruben Carcagno February 2,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
Review of the 11T Dipoles at Collimator Section for the HL-LHC Closed-out Report Akira Yamamoto (Chair) held at CERN, 6 April, April, 2016.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
Closing Session Report
CERN, 11th November 2011 Hi-lumi meeting
P. Ferracin on behalf of the MQXF collaboration
HL-LHC Magnet components and assemblies
Cold mass design, assembly plans and QA/QC at CERN
HL-LHC IT STRING and Series test of SC link
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Roadmap for triplet cryostats
The HL-LHC Circuits: Global View and Open Questions
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
Opening Executive Session M.C.
Status report on MQYY (Q4)
Discussion session on day 1
DS11 T Transfer function, integral field and coil length
Lucio Rossi Project Leader
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
MQXF Short Models Status and Plans
P. Ferracin and G. Ambrosio
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
The 11T cryo-assembly: summary of design and integration aspects
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
HL LHC WP3 (magnets) TASK 2 ADVANCEMENT
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Hi-pot results summary
Presentation transcript:

logo area Preparation meeting for the International Review of the Inner Triplet Quadruples (MQXF) for HL-LHC P Ferracin, J.Ph. Tock, E Todesco

logo area Practical details  7 th – 10 th of June 2016  At CERN  Rehearsal on 1 st of June :00 – 17:30  PLEASE BOOK THE DATES To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 2 Members of the Review Panel: Akira Yamamoto (KEK-CERN, Chair) Joe Minervini (MIT) Arnaud Devred (ITER) Pasquale Fabbricatore (INFN) Mauricio de Lima Lopes (FNAL) Pierre Vedrine (CEA) Review Panel in December 2014: Akira Yamamoto, KEK-CERN, (Chair) Joe Minervini, MIT (Co-Chair) Jim Kerby, ANL Shlomo Caspi, LBNL Alexander Zlobin, (FNAL)

logo area Objective of the review  HL-LHC is in the final stage of design and prototyping: all technologies for the hardware upgrade must be fully proven by beginning of This review covers the cornerstone of the upgrade plan, the new IR quadrupoles (MQXF), featuring 150 mm aperture and peak field in the range of 11.5 T. The previous technical reviews addressed the conductor, the preliminary design, including the engineering concepts and the cost and schedule (within the overall scope of HL-LHC). A review in March 2016 addressed the topics concerning the circuit system.  The scope of this review is to examine:  1.The magnet requirements and design status, including the cold mass with its interfaces (cryostats, electrical, hydraulic, mechanical, vacuum) and integration issues (cold mass and integration will be assessed at the level of preliminary design stage);  2.The major design alternatives considered (conductor, aperture, length, operating temperature, etc.);  3.The results of model magnets (including previous smaller aperture ones) and the status of prototype magnets;  4.The conductor performance, procurement status and plans;  5.The status of production tooling, finalization of design and procurement;  6.The components’ procurement, status and plans;  7.The test plan, QA/QC, and safety aspects (PED);  8.Restricted sessionThe strategy for magnet construction and/or procurement and the overall schedule (assuming the US contribution for Q1 and Q3 magnets); -  9.The risk registry and mitigation measures. : To be included in each talk To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 3

logo area Mandate  The review committee is invited to assess:  the progress since the last reviews (MQXF superconducting cables and MQXF magnet design), Provide feedback & answers to pints raised at the last reviews : cable and QXF  the soundness of the design and technical choices,  the readiness of the various components  the procurement plan (including QA/QC)  the test plan,  the status of the integration.  A detailed resources analysis is beyond the scope of the review, however comments of the credibility of the plan, also with respect to the available resource, are welcome. (Details about cost and available resources will be presented at the October HL-LHC Cost & Schedule Review)  Following the close-out by the review chair, the committee is required to compile a short report with findings, comments and recommendations within one month. The report will be delivered to Luca Bottura, TE-MSC Group leader, and to L. Rossi, HL-LHC Project leader. To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 4

logo area Agenda – Day 1 – To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 5 Meyrin IT auditorium 31/3-004 StartEndDurationTopicSpeaker 8:309:000:30Closed session 1.19:009:200:20Welcome and Review chargeL. Rossi 1.29:2010:000:40HL-LHC upgrade, requirements and alternativesE. Todesco 1.310:0010:300:30Follow-up of previous review reccomendationJ.Ph. Tock 10:3010:500:20Coffee 1.410:5011:350:45Overall MQXF development & plansG. Ambrosio 1.511:3512:200:45Magnet designP. Ferracin 12:2014:001:40Lunch + Visit 163B. Bordini 1.614:0014:300:30Short models coil and structure fabricationJ.C. Perez 1.714:3015:000:30Mirror and Short model tests and quench performanceG. Sabbi 1.815:0015:300:30Structural measurements and analysisG. Vallone 15:3016:000:30Coffee 1.916:0016:300:30Magnetic measurements and analysisS. Izquierdo Bermudez :3017:000:30Quench protection measurements and analysisG. Ambrosio 17:0018:001:00Q&A 18:00 Adjourn 18:0021:003:00Review dinner

logo area Agenda – Day 2 – To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 6 Meyrin LHC auditorium 30/ :309:000:30Closed session 2.19:009:450:45SC procurement, cable fabrication and QA/QC at CERNB. Bordini 2.29:4510:300:45SC procurement, cable fabrication and QA/QC by US HL-LHC-AUPL. Cooley 10:3011:000:30Coffee 2.311:0011:300:30Long coil manufacturing plan and QA/QC at CERNF. Lackner 2.411:3012:000:30Long magnet manufacturing plan and QA/QC at CERNJ.C. Perez 12:0014:002:00Lunch + visit :0014:300:30Long coil manufacturing plan and QA/QC by US HL-LHC-AUPF. Nobrega/J. Schmalzle 2.614:3015:000:30Long magnet manufacturing plan and QA/QC by US HL-LHC-AUPP. Cheng 2.715:0015:300:30Test facility and test plan at CERNM. Bajko 15:3016:000:30Coffee 2.816:0016:300:30Vertical test facility and test plan for prototypesJ. Muratore 2.916:3017:000:30Horizontal test facility and test plans by US HL-LHC-AUPG. Chlachidze :0017:300:30String testM. Bajko 17:3018:000:30Q&A 18:00 Adjourn

logo area Agenda – Day 3 – To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 7 Meyrin IT auditorium 31/ :309:000:30Closed session 3.19:009:300:30ES&H and codesT. Otto 3.29:3010:000:30Pressure vessel safety aspectC. Arregui 3.310:0010:300:30Status of cryostat preliminary design, integration and QA/QCD. Ramos Duarte 10:3011:000:30Coffee 3.411:0011:300:30Cold mass design, assembly plans and QA/QC at CERNH. Prin 3.511:3012:000:30Cold mass design, assembly plans and QA/QC by US HL-LHC-AUPT. Vouris 3.612:0012:300:30WP3 QA management in the frame of the HiLumi projectR. Principe 12:3014:001:30Lunch 3.714:0014:300:30Production scenariosE. Todesco 3.814:3015:000:30Production plans at CERNF. Savary 3.915:0015:300:30Production plans by US HL-LHC-AUPR. Carcagno 15:3018:002:30Panel Closed session 18:00 Adjourn

logo area Agenda – Day 4 – To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 8 Meyrin LHC auditorium 30/ :3011:303:00Panel Closed session 11:3012:000:30Close-outA. Yamamoto 12:00 Adjourn

logo area Day 1 –  1.1 Welcome and Review charge  9:00-9:20 – 20’, no question  Speaker: L. Rossi  Scope:  Welcome  Agenda  Review objectives  Specific questions to the committee (Inputs via J.Ph. Tock) To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 9

logo area Day 1 –  1.2 HL-LHC upgrade, requirements and alternatives  9:20-10:00 – 30’, 10’ for questions  Speaker: E. Todesco  Scope:  Functional requirements and main magnet parameters including magnet acceptance parameters  Alternatives : conductor, aperture, length, operating temperature  Changes wrt to last reviews (2014)  Summary of circuit review outcome  PIT / RRP CERN  Critical issues, risks  Margin  Clear list of design and performance golas To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 10

logo area Day 1 –  1.3 HL-LHC upgrade, requirements and alternatives  10:00-10:30– 25’, 5’ for questions  Speaker: J.Ph. Tock  Scope:  Inventory of recommendations of previous reviews  Review of the Superconducting Cables for the HL-LHC Inner Triplet Quadrupoles (MQXF) – 5 th -6 th November 2014  Inner Triplet Quadruples (MQXF) Design – 10 th -12 th December 2014  Feedback, answers to questions,  Reference to further presentations covering these points To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 11

logo area Day 1 – :30-10:50 To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 12

logo area Day 1 –  1.4 Overall MQXF development & plans  10:50-11: ’ + 15’ for questions  Speaker: G. Ambrosio  Scope:  Overview of MQXF development plans both in US and CERN  Key aspects  Test results To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 13

logo area Day 1 –  1.5 Magnet design  11:35-12: ’ + 15’ for questions  Speaker: P. Ferracin  Scope:  Main magnet design features  Reasons for critical choices  Take into account tolerances achieved during the fabrication of the US-LARP HQ magnet [Dec 2014 review]  Focus on main aspects : Specific questions can be answered during Q&A sessions, upon requests from the committee  Keep a half length back-up option for Q2 [Dec 2014 review] To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 14

logo area Day 1 – Lunch + Visit :20-14:00 Organiser : B Bordini Participants : Review committee, key persons To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 15

logo area Day 1 –  1.6 Short models coil and structure fabrication  14:00-14: ’ + 10’ for questions  Speaker: J.C. Perez  Scope:  Both US and CERN short models coils  Manufacturing flowchart  Production status To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 16

logo area Day 1 –  1.7 Mirror and Short model tests and quench performance  14:30-15: ’ + 10’ for questions  Speaker: G. Sabbi  Scope:  Both US and CERN short models coils  Manufacturing flowchart  Production status To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 17

logo area Day 1 –  1.8 Structural measurements and analysis  15:00-15: ’ + 10’ for questions  Speaker: G. Vallone  Scope:  Mechanical aspects  Analysis of test results To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 18

logo area Day 1 – :30-16:00 To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 19

logo area Day 1 –  1.9 Magnetic measurements and analysis  16:00-16: ’ + 10’ for questions  Speaker: S Izquierdo Bermudez  Scope:  Both CERN and US models test To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 20

logo area Day 1 –  1.10 Quench protection measurements and analysis  16:30-17: ’ + 10’ for questions  Speaker: G. Ambrosio  Scope:  Quench protection principles  Include voltage distribution during quench in nominal and heater failure scenario [Dec 2014 review]  Inner / Inter layer heater concepts needs to be critically evaluated  On-going developments  Margin  CLIQ [If asked by the committee, a CLIQ presentation can be done during the Q&A session] To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 21

logo area Day 1 – :00 – Glassbox (TBC) Review Dinner To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 22

logo area Day 2 –  2.1 SC procurement, cable fabrication and QA/QC at CERN  9:00-9: ’ + 15’ for questions  Speaker: B. Bordini  Scope:  Wire / Cable specification  Conductor performance / Cable performance and cabling degradation  Comparison RRP / PIT  Production strategy conductor  Production strategy cable  Status  Description of the quality assurance and quality control plan  New conductor and cable geometry, needed to allow use of PIT conductor  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 23

logo area Day 2 –  2.2 SC procurement, cable fabrication and QA/QC by US HL-LHC-AUP  9:45-10: ’ + 15’ for questions  Speaker: L. Cooley  Scope:  Conductor performance  Cable performance  Production strategy conductor  Production strategy cable  Status  Description of the quality assurance and quality control plan  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 24

logo area Day 2 – :30-11:00 To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 25

logo area Day 2 –  2.3 Long coil manufacturing plan and QA/QC at CERN  11:00-11: ’ + 10’ for questions  Speaker: F. Lackner  Scope:  Production / procurement status  Tooling status  More detailed schedule, need to duplicate tooling? What margin do we have?  Description of the quality assurance and quality control plan  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 26

logo area Day 2 –  2.4 Long magnet manufacturing plan and QA/QC at CERN  11:30-12: ’ + 10’ for questions  Speaker: J.C. Perez  Scope:  Production / procurement status  Tooling status  More detailed schedule, need to duplicate tooling? What margin do we have?  Description of the quality assurance and quality control plan  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 27

logo area Day 2 – Lunch + Visit :00-14:00 Organiser : F. Savary Assess feasibility, usefulness of moving material from 927 Participants : Review committee, key persons To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 28

logo area Day 2 –  2.5 Long coil manufacturing plan and QA/QC by US HL-LHC-AUP  14:00-15: ’ + 10’ for questions  Speakers: F. Nobrega / J. Schmalzle [Video connection]  Scope:  Production / procurement status  Tooling status  More detailed schedule, need to duplicate tooling? What margin do we have?  Description of the quality assurance and quality control plan  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 29

logo area Day 2 –  2.6 Long magnet manufacturing plan and QA/QC by US HL-LHC-AUP  14:30-15: ’ + 10’ for questions  Speaker: P. Cheng  Scope:  Production / procurement status  Tooling status  More detailed schedule, need to duplicate tooling? What margin do we have?  Description of the quality assurance and quality control plan  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 30

logo area Day 2 –  2.7 Test facility and test plan at CERN  15:00-15: ’ + 10’ for questions  Speaker: M. Bajko  Scope:  Test up to 110% of nominal operating current [Dec 2014 review]  Thermal cycling [Dec 2014 review]  Includes test capacity assessment  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 31

logo area Day 2 – :30-16:00 To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 32

logo area Day 2 –  2.8 Vertical test facility and test plan for prototypes  16:00-16: ’ + 10’ for questions  Speaker: J. Muratore [Video connection]  Scope:  Test up to 110% of nominal operating current [Dec 2014 review]  Thermal cycling [Dec 2014 review]  Includes test capacity assessment  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 33

logo area Day 2 –  2.9 Horizontal test facility and test plans by US HL-LHC-AUP  16:30-17: ’ + 10’ for questions  Speaker: G. Chlachidze [Video connection]  Scope:  Test up to 110% of nominal operating current [Dec 2014 review]  Thermal cycling [Dec 2014 review]  Includes test capacity assessment  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 34

logo area Day 2 –  2.10 String test  17:00-17: ’ + 10’ for questions  Speaker: M. Bajko  Scope:  1 or 2 phases : pros and cons  Topics to be tested To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 35

logo area Day 3 –  3.1 ES&H and codes  9:00-9: ’ + 10’ for questions  Speaker: T. Otto  Scope:  Similar to 11T review, without pressure equipment aspects  Brief description of Safety (documentation) process in HL-LHC  Status of this process for WP3  Status Workplace safety analysis in Bldg. 180 and 183  Requirements from the Launch Safety Agreements To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 36

logo area Day 3 –  3.2 Pressure vessel safety aspect  9:30-10: ’ + 10’ for questions  Speaker: C. Arregui  Scope:  Pressure Equipment directive mainly To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 37

logo area Day 3 –  3.3 Status of cryostat preliminary design, integration and QA/QC  10:00-10: ’ + 10’ for questions  Speaker: D. Ramos Duarte  Scope:  Status report  Identify areas where inputs are required  Requirements on interfaces with cold mass  Interconnects  Tooling  Planning showing that present status is in-line with the overall project schedule  Includes risk registry and mitigation measures  Same interfaces feature both for CERN and US cold masses To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 38

logo area Day 2 – :30-11:00 To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 39

logo area Day 3 –  3.4 Cold mass design, assembly plans and QA/QC at CERN  11:00-11: ’ + 10’ for questions  Speaker: H. Prin  Scope:  Description of the main tooling  Present status  Plan to completion – where are we ?  Critical issues  Interfaces compatible with cryostat requirement  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 40

logo area Day 3 –  3.5 Cold mass design, assembly plans and QA/QC by US HL-LHC-AUP  11:30-12: ’ + 10’ for questions  Speaker: T. Vouris  Scope:  Present status and development plans  Critical issues  Interfaces compatible with cryostat requirement  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 41

logo area Day 3 –  3.6 WP3 QA management in the frame of the HiLumi project  12:00-12: ’ + 10’ for questions  Speaker: R. Principe  Scope:  Similar to 11T review,  QA plan for MQXF in the frame of WP3  Documentation management, EDMS  Procedures, NCR  MTF To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 42

logo area Day 3 – Lunch 12:30-14:00 To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 43

logo area Day 3 –  3.7 Production scenarios  14:00-14: ’ + 10’ for questions  Speaker: E. Todesco : Restricted Session  Scope:  MQXF production scenarios  Overview of both CERN and US  Feedback loop with the model/prototype programme  Includes cold test and cryostating at CERN  Includes risk registry and mitigation measures  Contingency plan to be developed to hold the schedule [Dec 2014 review] To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 44

logo area Day 3 –  3.8 Production plans at CERN  14:30-15: ’ + 10’ for questions  Speaker: F. Savary : Restricted Session  Scope:  Focus on LMF activities  Includes info from WP11  Intermediate step before the Cost & Schedule review of October 2016  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 45

logo area Day 3 –  3.9 Production plans by US HL-LHC-AUP  15:00-15: ’ + 10’ for questions  Speaker: R. Carcagno: Restricted Session  Scope:  All HL-LHC-AUP activities  Includes risk registry and mitigation measures To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 46

logo area Day 4 –  Panel Closed session  08:30-11:30  Opportunity for Q&A session  Be available in case of requests from the committee To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 47

logo area Day 4 –  Close-out  11:30 – 12:00  A Yamamoto  Time to be confirmed To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 48

logo area To edit speaker name go to Insert > Header & Footer and apply to all slides except title page 49