ELENA Layout Naming Convention F. Butin / ELENA collaboration.

Slides:



Advertisements
Similar presentations
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Advertisements

EMMA Electrical Engineering July 06 EE & PS Group EE & PS Group – EMMA 06
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
Lecture 16 Introduction to XML Boriana Koleva Room: C54
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
The engineering needed for particle physics by Steve Myers Philosophical Transactions A Volume 370(1973): August 28, 2012 ©2012 by The Royal Society.
ELENA Source Vacuum System, LNS R. Kersevan Integration and Installation Committe – 18 Sept 2014.
Internet & World Wide Web How to Program, 5/e. © by Pearson Education, Inc. All Rights Reserved.2.
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
Status and Prospects for the AD and ELENA
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
ENLIGHT,12/2/20021 Health and Science, can CERN contribute? The Mission of CERN (1954): “The Organization shall provide for collaboration among European.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
European Organization For Nuclear Research PS2 Naming Conventions: the Options Ronny Billen 15 June 2009 Accelerators and Beams Department Controls Group.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
ELENA Documentation and Data Management Items, Assets, Functional Positions T. Birtwistle EN-ACE-CL With input from T. Krastev EN-ACE-EDM.
TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I: Current Situation a) Overview of TE-ABT Systems & equipment b) Naming conventions used.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Database - How to keep BI information up to date? Samy Chemli on behalf of EN-MEF-DC.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
13 January 2005 PS&SPS DAYS How can we restart AD in 2006? Slide 1 How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD.
T.Eriksson P.Belochitskii G.Tranquille CERN, BE department, 1211 Geneva 9 September 2011T. Eriksson CERN BE/OP.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
Steering committee ELENA Project Structure S. Maury, project leader C. Carli, deputy project leader Beam physics and Performance Committee (G. Tranquille,
ELENA Integration F. Butin / ELENA collaboration.
Crab Cavity Technical Coordination meeting:
Overview of Extra Low ENergy Antiproton ring (ELENA) and TE-EPC contribution to the project TE-EPC Group Meeting Michal Dudek 25th June 2015.
M.J. Barnes : Canadian Involvement with LHC
Jorge Sánchez-Quesada BE-RF-FB
ELENA installation and commissioning status
Installations up to Start of Commissioning
LIU – EVM status and next steps
AD consolidation activities in LS2
Configuration Management and Layout Database ELENA Project
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Availsim runs and questions
Layout Drawings and Mechanical Assembly Drawings
The ELENA Safety Documentation «time to prepare the safety clearance»
Powering the LHC Magnets
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
ELENA Technical Coordination
SPS activities during LS2 TE-EPC (Power Converter Group)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
EN-CV interventions during EYETS for PS and PSB
Basic Electrical Circuits
How can we restart AD in 2006 ? Tommy Eriksson AB/OP/AD
What Do I Want from an RDB?
ELENA Extra Low ENergy Antiproton Ring
Experimental Areas – LS2 planning
Circuits _____________ ______________
Basic Electrical Circuits
Transfer Line for EIC.
Presentation transcript:

ELENA Layout Naming Convention F. Butin / ELENA collaboration

Document ready to be approved Document currently under « engineering check » in EDMS ( ) F. Butin / ELENA collaboration

Definition Conventions to be used when attributing names to components of the ELENA layout, i.e. the functional positions (also called slots) of ELENA. Not to be confused with the part identifier of the physical equipment installed in the slot. Based on PS complex in general, LINAC4 in particular F. Butin / ELENA collaboration

What is included Machine layout: functional positions of all elements on or along the beam path of ELENA Layout of electrical circuits: circuits with their main constituents, eg power converter(s) and the load Layout of racks and electronics: racks and chassis in the vicinity of ELENA F. Butin / ELENA collaboration

Machine layout (1) Syntax: ELENA Zone, Functional Equipment Code, Position Number F. Butin / ELENA collaboration

LNE LNR LNILNS LNE

Machine layout: equipment code Functional equipment code: official code in the list of equipment of PS- Complex Some equipment codes must be checked (e - cooler, electrostatic deflectors…) F. Butin / ELENA collaboration

Machine layout: Position number Positioning of the layout component within a specific ELENA Zone. First 2 digits : sub-zone within a specific zone Last 2 digits :incremental positioning within the sub-zone, no reference to a metric position. F. Butin / ELENA collaboration

Subzones numbering ELENA Zone Naming Zone Delimiting elements Zone range (4 digits) LNR ELENA ringHexagonal ring LNE Transfer line towards experiments TBD for existing exeriments side 5000 – 9999 for GBar experiments side LNI Injection line Ejection septum in AD –> Injection Septum on LNR 0000 – 0099 LNS H+/- source H+/- source – > Injection kicker 0000 – 0099 F. Butin / ELENA collaboration

Subzones numbering F. Butin / ELENA collaboration LNE 50 LNR LNILNS LNE 00 LNE 01 LNE 02 LNE 03 LNE 04 LNE 05 LNE 06 LNE 51

Connected sequence of electrical circuit elements, connecting the load (i.e. magnet, magnet string, RF- cavity, kicker,...) to one or several power converters Syntax: ELENA Zone, Circuit Type, Circuit Location Electrical circuits layout F. Butin / ELENA collaboration

Electrical circuit type Functional Equipment code of the load Function RBHMBH, BHZHorizontal trajectory bending RBVMBVVertical trajectory bending RQMQD and MQF in seriesFocusing, quadrupolar RQDMQDDefocusing, quadrupolar RQFMQFFocusing, quadrupolar RCHMCHHorizontal trajectory correction RCVMCVVertical trajectory correction RLFMLFFocusing, solenoidal Electron cooler converter Electrostatic elements Other, needed for ELENA F. Butin / ELENA collaboration

Electrical circuit location Electrical circuit location defined by the four digits of the location of the first element of the load within the circuit. F. Butin / ELENA collaboration

Power converters naming Syntax: Equipment Code, Location, powered Electrical Circuit F. Butin / ELENA collaboration

Power converters equipment code Official 5-character equipment code representing the power converter type, as declared in the unique list (following the LHC QAP), with : ‘R’ for power converter equipment ‘P’ for power converters F. Butin / ELENA collaboration

Power converters location Location shows the building where the power converter is located (AD hall, bdg 193)… Electrical circuit naming is same as before F. Butin / ELENA collaboration

Racks layout naming Syntax: Equipment code, sequence number, location Location is the number of the building, followed by a letter (H= AD Hall, C=AD control room, S=service room) F. Butin / ELENA collaboration

Control electronics naming Syntax: Equipment code, location, function The location is the one of corresponding rack The function is optional F. Butin / ELENA collaboration