SPS – DM Shadow Position Sensors – Demonstration Model Gerardo Capobianco INAF – Astrophysical Observatory of Turin Torino, 21 st January 2016ASPIICS/Proba-3.

Slides:



Advertisements
Similar presentations
Osservatorio di Arcetri LBT AO Conceptual Design Review Steward Observatory - March 5-7, 2001 MMT336 Characterization Software Armando Riccardi & Guido.
Advertisements

An SiPM Based Readout for the sPHENIX Calorimeters Eric J. Mannel IEEE NSS/MIC October 30, 2013.
CAPSTONE Demonstration Radio TiVo FPGA Thundercats: Hariklia Karagiannis Hasina Jamal Osato Edo-Osagie Brad Mazan Chad Griffith.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
GRIPS Imaging Subsystem Gordon Hurford GRIPS Kickoff Meeting 22-Sept-08.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Yannick Geerebaert LLR Ecole Polytechnique CNRS IN2P3 Palaiseau France INGRID Meeting / March 2008 / France March 2008 status MPPC TEST LLR S.
Cophasing activities at Onera
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Low Cost Infrared Touch Screen Bezel for POS Systems Rohan Verma, Jeremy Taylor, Freddie Dunn III Georgia Institute of Technology School of Electrical.
DARREN'S PROJECT PRESENTATION 8051 Controlled Speedo For a Trolley On An Inclined Ramp.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
1 WP3 Progress towards objectives 27/10/ WP3.1 Communications equipment for trials The objectives of this work package are: to configure existing.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
CRISP & SKA WP19 Status. Overview Staffing SKA Preconstruction phase Tiered Data Delivery Infrastructure Prototype deployment.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
ASTEROSEISMOLOGY and SEARCH for EXOPLANETS Vienna - September 18 th 2001 Optical performance characterization Point Spread Function (PSF) : Telescope +
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
GAYA Analyzer SDD Presentation. GAYA Analyzer Introduction OMS40G256 is a hardware device used for detection of radioactive radiation for medical imaging.
Integrated Smart Sensor Calibration Abstract Including at the sensor or sensor interface chip a programmable calibration facility, the calibration can.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
1 HCAL production, QC and preparation for installation Overview of the status report Rustem DZHELYADIN (IHEP, Protvino)  The general status.
Cavity Tuning Machines Project Update Ruben Carcagno January 11, 2010.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Martin Hewitson and the GEO team Measuring gravitational waves with GEO600.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Diagnostics and Optimization Procedures for Beamline Control at BESSY A. Balzer, P. Bischoff, R. Follath, D. Herrendörfer, G. Reichardt, P. Stange.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
PACMAN : technical objectives Hélène Mainaud Durand.
A discussion on the Readout Schedule leading to PDR Ganesan Rajagopalan Cornell University.
OPSE Demonstration Model: testbed and test review D. Loreggia, ALTEC, OPSE Demonstration Model: Testbed and Test review Davide Loreggia INAF.
ParkNet: Drive-by Sensing of Road-Side Parking Statistics Irfan Ullah Department of Information and Communication Engineering Myongji university, Yongin,
ASPIICS/Proba-3 Meeting – 21 st January, 2016 –Torino (Italy) OPSys: INAF Optical Payload Systems Facility Silvano FIneschi INAF – Astrophysical Observatory.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
JRA3 Institute of Physics ASCR Prague
LLRF Research and Development at STF-KEK
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Radius disco Radius agujero Motor Controller Sensor Motor soporte.
SciFi option for neutrino target tracker
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Mini-drawers, FE-ASIC , Integrator
Comprehensive Design Review
EUDET – LPC- Clermont VFE Electronics
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Command and Data Handling
Presentation transcript:

SPS – DM Shadow Position Sensors – Demonstration Model Gerardo Capobianco INAF – Astrophysical Observatory of Turin Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 1

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 2 STATUS The SPS-DM provided by SensL and delivered in October 2015 is actually in Florence where the functionality tests are in progress. -> Test a Firenze? -> Che tipo di calibrazioni sono di competenza SensL? Foto

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 3 Test-bed Objectives Validation of the SPS subsystem measuring the performances of the SiPMs, readout electronics and algorithms (test on SPS DM) Optimization of the SPS readout electronics(i.e., DAC offset) Provide a ground simulator for FF algorithms tests and in- flight data interpretation

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 4 Test-bed The test-bed will simulate the expected illumination of the 8 SPS SiPMs in the different FF configurations by using 8 indipendents calibrated light sources directly interfaced with the SiPMs.

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 5 Test-bed description Indipendent light sources Control PC SPS Flange Test-bedFlange Fiber optics

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 6 Test-bed flange - skatch

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 7 Test-bed flange - skatch

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 8 Test-bed Sources The selected light sources are LEDs. In order to achieve the requirements of dynamic range and accuracy, 3 (TBC) LEDs with independent forward current controllers will be merged in a single fiber. The requirements of dynamic range and accuracy could be matched also by a single high power LED by the combination of the forward current tuning and PWM. This option has been discharged cause the frequency of the PWM is < 100 kHz when the sampling of the SPS ADC is of 1 MHz.

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 9 LEDs Requirements Customized device by Prizmatix

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 10 LED Optical Specifications (single LED)

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 11 Test-bed reliability aspects The test-bed will be used for the SPS DM, EQM and PFM In case of schedule conflict between the full test-bed characterization and the SPS DM test results delivery, a single source of the test-bed will be used for the characterization of the SPS DM as a calibrated source Test-bed Status A demonstration model of a 3 LEDs source merged in a single fiber is under procurement for the concept validation tests and a measurement of the performances. This device should be used as calibrated source for the SPS DM tests. The delivery is expected for the beginning of March 2016.

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 12 Test-bed Calibration plan RADIOMETRIC Calibrations Spectral Calibrations The set-up for radiometric calibration will be also used for the time-stability characterization of the LEDs. If the already described action are not enough we plan to install an active stabilization system

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 13 SPS – DM Calibration Plan (single source) Radiometric calibration of the SPS DM SiPMs using the calibrated light source in the expected operational range (and higer) Evaluation of the contribution of the readout electronics to the error budget by measuring the current at the SiPMs pins and at the end of the acquisition pipeline (TBC) SPS – DM Calibration Plan with full test-bed a. Simulating different FF configurations, by illuminating each SiPM with the values of lookup tables derived from [RD 04] and corrected with the result obtained from the LEDs calibration tests and with the SiPM responsivity Running the SPS algorithms, we will reconstruct the FF configuration “as seen” by the SPS. This calibration will give the total accuracy of the SPS subsystem. b. If possible, reading the values of the output current of the SiPM and using the same procedure of a., we will be able to separate the contributions of the algorithms (that are based on a fits of the penumbra profiles) and the contributions of the SPS readout electronics from the total error budget by retrieving the FF configuration feedback before and after the readout electronics. c. If we will not be able to finalize the calibration described in b., because it will not be possible to connect the picoammeter on the SPS DM board, we’ll use the best estimation of the algorithms errors.

Torino, 21 st January 2016ASPIICS/Proba-3 Meeting 14 SPS – DM Calibration SCHEDULE 2016 March 14: Single LED source delivery; 2016 April 11: Complete LED characterization; 2016 April 22: Complete set-up integration and hw/sw debugging; 2016 May 14: Complete the SPS DM characterization