Status and plan of Beta-matching in Extraction line 200812 Kiyoshi Kubo.

Slides:



Advertisements
Similar presentations
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
Advertisements

Coupling Correction in ATF2 EXT 7 th ATF2 Project Meeting, december 2008 C.Rimbault, LAL Orsay.
Ultra Low Vertical Emittance at the Australian Light Source Mark Boland on behalf of Rohan Dowd 1.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
Optics for Skew Correction and Emittance Measurement Leo Jenner This talk is going to look familiar if you were at the recent LC-ABD meeting in Manchester…
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
CERN, BE-ABP (Accelerators and Beam Physics group) J. Pfingstner Beam jitter studies at ATF and ATF2 Jürgen Pfingstner Hector Garcia Morales 25 th of January.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Kicker Optics – or – Selected ATF-II EXT Line Performance Issues ATF-II Technical Review, April M. Woodley1/40.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
Y. Ohnishi / KEK KEKB LER for ILC Damping Ring Study Lattice simulation of lattice errors and optics corrections. November 1, 2007 Y. Ohnishi / KEK.
ATF2 Tuning Updates Glen White, SLAC Sept
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
1 IR with elliptical compensated solenoids in FCC-ee S. Sinyatkin Budker Institute of Nuclear Physics 13 July 2015, CERN.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Dynamic Aperture Study for the Ion Ring Lattice Options Min-Huey Wang, Yuri Nosochkov MEIC Collaboration Meeting Fall 2015 Jefferson Lab, Newport News,
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
EXT: Summary of activities, software development, and tuning performance 11th ATF2 Project Meeting, January M. Woodley1/29.
J. Pfingstner, LCWS13 Jitter and ground motion studies November 13, 2013 Beam jitter at ATF2: A. Source localisation and B. Ground motion correlation Jürgen.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
J. Brossard, C. Rimbault a P. Bambade LAL / / 8-9 nov LAL 1 Exercising emittance measurements in the ATF EXT line Upgrade.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Beam Based Optics Measurements CTF3 Collaboration meeting CERN Yu-Chiu Chao, TJNAF.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Status of EXT coupling measurement analysis 9 th ATF2 project meeting C.Rimbault (LAL) S. Kuroda, T. Tauchi, N. Terunuma (KEK), G. White, M. Woodley (SLAC)
Wakefield effect in ATF2 Kiyoshi Kubo
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
On Multipole Measurements, Optics and Magnet Swapping To Swap, or not to Swap, that is the question: Whether 'tis Nobler in the mind to suffer The Slings.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
ILC DR Lower Horizontal Emittance, preliminary study
Measurements and analysis of beam parameters at post-IP wire-scanner
Beam jitter experiment of exchanging power supplies
Further Tracking Studies and March Trip Plan
Tolerances & Tuning of the ATF2 Final Focus Line
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
ILC Z-pole Calibration Runs Main Linac performance
New algorithms for tuning the CLIC beam delivery system
ILC DR Lower Horizontal Emittance? -2
ATF2 Recent Wakefield (Beam size Intensity dependence) Studies
ATF2 IP Tuning Task Simulation Updates
Accelerator Physics Technical System Group Review
3rd ATF2 Project Meeting, December 18-20, 2006
Simulation of the FCC-ee lattice with quadrupole and sextupole misalignments Sergey Sinyatkin.
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Multipole Limit Survey of FFQ and Large-beta Dipole
Compensation of Detector Solenoids
Multipole Limit Survey of Large-beta Dipoles
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Sha Bai CEPC AP meeting Work summary Sha Bai CEPC AP meeting
Presentation transcript:

Status and plan of Beta-matching in Extraction line Kiyoshi Kubo

Goal and task members Goal is to set correct (designed) Twiss parameters at the exit of EXT (entrance of FF). But, –It is not clear how fine the optics should be matched. The first beam test in December (we have a half shift) ? Members K.Kubo, M. Pivi, (M. Woodley ?),,,,,?

Possible procedure of beta matching 1.Measure Twiss parameters around the extraction kicker in Damping Ring. : Measurement of tunes changing quadrupole strengths around the kicker. Probably DR optics should not be changed after low emittance tuning in the ring. 2.Calculate a proper setting of quadrupole magnets in the extraction line and set it. 3.Measure emittance and Twiss parameters in the extraction line.: Multi-wire measurement and/or Q-scan methods. 4.Calculate a proper setting of quadrupole magnets in the extraction line and set it. Changing strength of quadrupole magnets in up stream region is better for checking the result. 5.Perform 3 again to confirm the matching. 6.Iterate 4 and 5 if necessary.

To be carefully considered Strength of QM7R (Extracted beam goes through off axis of this magnet.) –What is quadrupole field component? –Effects of multi-pole components? Error of beam size measurement –Performance of wire scanners –Effects of beam jitter

On QM7R quad field error Extracted beam goes through off axis of QM7R –Quadrupole component is smaller at off axis. –Optics was designed for on axis quad field Requirement: Designed Twiss parameters at the FF entrance Zero dispersions in the straight section of EXT Cancellation by two-kicker system If the field is known, Correction by changing Damping Ring optics is possible (M.Woodley and M.Pivi) Correction by changing quadrupole of upstream part of EXT is also possible (K.Kubo) But, beam orbit at QM7R is not accurately known.  field strength is not well known. Non linear field cannot be compensated.  This magnet is still a big problem

Simulation of beta-matching Preliminary simulations have been performed. Use perfect EXT beam Line Set initial mismatch –At entrance of EXT, set beta and alpha Simulate emittance and beam (Twiss) parameter measurement by wire scanners –Multi-wire and –Quad scan Change quads in EXT line for matching at FF entrance and look at –B_mag (measure of beta-matching) –Beam size at IP (with perfect FF line).

Simulation of multi-wire measurement By tracking macro-particles using SAD 5 wires (MW0X ~ MW4X) Error of beam size measurement –Absolute + relative Dispersion at each wire is set by hand “Error factor” is multiflied to the each error 100 random seeds for errors Emittance and Twiss-parameters are fitted.

Set Quads for matching From fitted beam parameters, calculate strengths of QF9X ~ QD14X for matching at the end of EXT line (entrance of FF line) Command “fit” of SAD is used. Set calculated strength and perform tracking.

Result of multi-wire simulation Distribution of Bmag after matching correction Fitting deos not give positive emittance for some random seeds, in the large error cases. standard error standard error /2 standard error *2 initial Bmag=1.2 initial Bmag=2 standard error /2 standard error

Ratio of successful fitting

Bmag_y after matching correction (5-wires) Standard error seems too large. 1/2 seems fine.

Beam size at IP after matching correction (5-wires), Perfect FF line Designed FF line without IP tuning. Tuning will change the result. Requirement for beta-matching is not clear.

Simulation of Quad scan measurement Performance looks similar to multi-wire method (a little worse) Ratio of successful fitting

Summary of the preliminary simulation Simulation of beta-matching was performed: –Multi-wire method (5 wire scanners) –Quad scan method Bema size resolution ~<0.5 micron is desirable –For poor resolution, the data cannot be fitted. Both methods will be fine for good bema size resolution. But multi-wire method is less sensitive to beam size error. Accurate beam size measurement is critical for beta matching correction.

More simulations of beta-matching IF necessary, Include “standard” (realistic) errors. Probably we may use the assumption, which Glen White used. Realistic error of beam size monitors should be carefully considered. Limit of magnet strength, etc. should be taken into account. Integrated study –Include all basic corrections: orbit, dispersion, (and maybe coupling). –Effects to IP beam size with tuning We will need iterations of simulations and beam test.

For experiment and operation Emittance and betafunction measurement tool is exist (old one, modified for new beam line). –Wire scanner measurement and fitting. (both multi- wire and q-scan) Analysis are done off-line. –It seems fine, at least for a moment

SUMMARY It is not clear how fine the beta-function should be matched. –Look at effect to IP tuning (?) Preliminary simulation showed that we need good beam size measurement. –~0.5 micron resolution is desirable, 2 micron is not acceptable. First beam test will be performed soon. –Iteration of experiment and theory (simulations) will be necessary.

back up

Initial mismatch Two cases of B_mag –B_mag=1.2 and B_mag=2 –Three cases for each Bmag This may not be realistic. (?)

Beam size at wires, no error

Quad scan measurement Without errors

Bmag_y after matching correction (Q scan)

Beam size at IP after matching correction (Q-scan), Perfect FF line