1 Class-X BW/FW Subassemblies S. Bettarini for the Pisa Belle2-SVD group SVD Parallel Session VXD-Workshop Praga, 22 nd January 2015 OUTLINE Status/numbers.

Slides:



Advertisements
Similar presentations
LHCb Velo Construction Authorisation steps Tony Smith.
Advertisements

Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Shipping/Receiving concerning the BW/FW assemblies S.Bettarini/F. Forti.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
QCG Report Francesco Forti University and INFN, Pisa.
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Status & schedule of ladder parts production Oct. 2, 2014 Koji Hara (KEK)
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
Detector building Notes of our discussion
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Ladder Assembly All tools and jigs produced Glue dispensing works
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
Hybrid & Module Electrical Testing
US Module Testing Progress Report
US Module Testing Progress Report
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
SVD group organization, schedule, milestones
Presentation transcript:

1 Class-X BW/FW Subassemblies S. Bettarini for the Pisa Belle2-SVD group SVD Parallel Session VXD-Workshop Praga, 22 nd January 2015 OUTLINE Status/numbers Tentative schedule Needed (extra) subassemblies Conclusions

Classes of a subassembly (  ladder) Let’s remind, a sub-assembly belongs to: Class D: mock-up. Used for early tuning procedures/jigs The detector may be an aluminum dummy The hybrids may not be loaded with APV25 chips The Flex-PA may be an old version and not bondable The assembly may be glued by hand, precision o(200 um) Class C: mechanically the same of a real one. Bonded but not electrically working. Used to test the final procedures/jigs before making an electrically functioning ladder. Subassemblies/Ladder are used to perform the mechanical characterization. The silicon detector design is the final one The hybrids are loaded with APV25 chips The Flex-PAs are bondable The precision of the glued parts is the same of the final ones Class B: used the final parts and procedures, electrically functioning parts but of low quality [efficiency ~ o(90%)] Used for test-beam(s) and for electrical characterization (noise, grounding, …) Class A: the very final one, to be mounted in the experiment. An acceptance criteria (< X% of defects) must be defined. 2

Old Subassembly Numbers (already delivered) Class D: undefined (about 2 pairs of SBW+SFW /site) Class C: 3 SBW + 3 SFW (1 pair/site) Class B: 3 SBW + 3 SFW (The Vienna’s ones for the test-beam) Class A: 45 SBW + 45 SFW pre-production: 3 SBW + 3 SFW - first spares production: 42 SBW + 42 SFW –38 SBW + 38 SFW –spares production: 4 SBW + 4 SBW. We know that the number of (ladder) spares is limited by the numbers of HPK det’s. HPK det’s counting/searching is in progress (completed for the B2GM). Originally the number of spare ladders were: 3,2,2 for Layer 6,5,4. At the BPAC review the new (hoped) numbers were: 5,4,3 (respectively) 3

Parts available in Pisa Detectors: –Micron: 1 class C + 2 class B (latest design) –HPK: 5 class “C/B”+ 1 to be re-tested + 1 vs.1 Flex PAs: –Remaining from the 1 st pre-prod. (not-tested against shorts): to be used for class C –Half of the 2 nd pre-prod (-4 PAs used for bonding tests). Take the remaining ones at the B2GM –Once the Flex-PA are delivered, IPMU need to measured all the pad width (how much extra time ?). Then they need to be shipped (by IPR): see det’s case. Hybrids (sandwiches): –2 class C FW (+2 taken from Vienna) –0 class C BW (+2 taken from Vienna) –64 class A to be done (1 st batch) the hybrids (rejected by the test even after simple rework ) can be shipped back to Vienna or used as class C. 4

Detector Shipping Defined the procedures for IPR Vienna  Pisa: –This week the 1 st shipment from Vienna is expected: according to the pro-forma invoice 7 det’s: 1 Class C + 6 ClassA, but actually ? –No further tests on them before mounting: avoid shipping the scratched (not re-tested) class A det’s! –The mismatch between the defects spotted by the det. test in TS and in Vienna has been understood? HPK det’s: see discussion outcome from: “Logistics and parts shipment” For the 1 st shipment from KEK many issues remain to be solved… On the critical path: the delay in the HPK det’s shipment can seriously affect the start of the production of the subassemblies! 5

FW mech. tools The final FW gluing jigs phi and z have been mechanically characterized under the CMM The PA chuck are produced this week (19  23/1) The functional characterization is to be done by gluing the 1 st SFW class C next week (26  30/1) Completed the 1 st batch of 20BW+20FW Multi Purpose Chucks (10 already used) The 2 nd batch of MPC (more 20BW+20FW) will be delivered in April. Ship back to Pisa the empty MPC as mechanical pieces. IPMU measurements on the last class C BW&FW subassemblies confirms that no movement of the silicon wrt the MPC occurred during the shipment (see back-up slides) 6

Let’s define the new numbers (and priorities) At the Vienna Site-qualification: no more class D one more class C ladder is needed (define the priority wrt class B). the L5 class B is the one used for the next test-beam Collect the other requests of IPMU/TIFR. -> class D: ? (expected 0!) -> class C: ? (expected one more ladder/site) -> class B: ? In Pisa we must have an extra pair of SFW/SBW for mechanical tests of the subassemblies. The gluing of the extra (class C) subassemblies should be done during the cooling system replacement, before the start of the pre-production and/or during the 2nd part of the Class A pre-production (and shipped accordingly to the needs). 7

“Tentative” Schedule 8 There is room for time optimization

Class A pre-production schedule: gluing 9 Use of only one CMM: only 2 gluing jigs are deployed. Change phi and z jigs once/week and their alignment is done with the detector just before starting the gluing procedures (0.25h). When the glue is cured (typically the day after the gluing) the survey is done, by registering the coordinate of the crosses (0.5h) on the gluing jig. After transferring the subassembly to the MPC (to take it away after the z gluing or for the upside-down operation to transfer it on the z gluing jig) the survey of the glue- line must be done under the microscope taking snapshots (0.5h). This time can be used to glue more class C sub-assemblies

Class A pre-production schedule: bonding/test 10 Test&rework means that after the 1st test, the needed operations are made by the bonding technician and eventually the test is re-done to arrive to qualify the side. Multiple tests cannot be easily quantified “a priori”. Even if the 1 st Z test has no bias voltage, shorts and unbonded channels can be spotted as well. Standard “running test time”~15 min/side The time required to make a Vsep scan test when Vbias is ordero of 10 mins. The laser scan is done phi-up. After the final upside-down (the sub-assembly must be shipped z-up) a quick test is foreseen to ensure that no damage occurred to the bondings on both sides. When the subassembly is tested and ready to be shipped a survey of the det's ref crosses (wrt the pins of the MPC) is performed.

Class A production at full speed The class A subassembly pre-prod. has been scheduled to be not tight. Real experience on that will say if the following estimate on Class A production is right. Key points: –It will be crucial to have many sub-assemblies glued in the bonding/test phase to avoid waiting time. –Max. gluing rate > Max. test rate > Max. bonding rate –One shift/each side is foreseen both for gluing and testing –Z side test is shorter than phi side one (when bias is on, Vsep scan and laser scan are foreseen). Laser scan don’t require rework (in principle) and it can be launched in the late afternoon or in the spare time of the phi shift. –The shipping rate proposed is ~ 8 SFW + 8 SBW / month 11

Class A production: gluing 12 Assumption: 5 working day / week One shipping (8 SFW + 8 SBW) every 4 weeks, compatible with the ladder production which will start much later Ladder assembly sites must test subassemblies as soon as they are delivered and store them in dorms until they will use them.

Class A production: bonding/test 13 Legenda:-n (+n) means previuos (next) 8SBW+8SFW batch Production rate: 4 FW (or 4 BW) subassemblies/week: 1  2 side/day for each operation: gluing, bonding and testing.

Details of test time estimation Test rate estimate inputs: –~2 sides/day  1 test + rework (Z) + 4 quick tests or 2 tests + rework + 1 laser scan/day (phi) –~2 shifts/day needed –1 (Z) shift consists of: 2 * 15 min/test + rework + analysis and result loading into the DB + 1 hour laser  3 hour-shift Remind: –Test-stand needs to run also o(2x128) tests (15 min) for single side Hybrid + o(2x64) test (15 min) after gluing. –The whole 1 st batch sandwiches scheduled to be tested before starting production. 14

FW/BW subassembly: ManPower The people who developed the tools (gluing jigs, micro-bonding set-up, electrical tests and laser-scan) are the same who will act the same role during sub-assembly production. 15 With the available manpower, possible to perform shifts of two teams (2 persons each)/day: Module assembly: 1 physicist + 1 technician (3h shift) Electrical test and laser-scan: 2 physicists (3h shift)

Exercise: shift allocation 16 To sustain the 8SFW+8SBW/month rate the manpower resources are not saturated!

Conclusions The tentative schedule has been done, by considering: –Facilities (CMM & jigs, u-bonding machine, test-stand) –Procedures (gluing, bonding, testing, shipping) –Available manpower By our estimate, we confirm that the rate of 8SFW+8SBW/month can be sustained (2 SFW+2 SBW/week). Final confirmation after Class A pre- production. For 42 SFW-SBW Class A pairs  ~ 5.5 months If starting the Class A production in April, we’ll finish in mid November: 7 months in total. 17 (Consider to add 1.5 month due to: - Few days: Easter Holidays -1 week: the next VXDWS in May -2 weeks: summer vacancies in August -2 weeks: the June/October B2GMs)

Back-up 18

BW class C sub-assembly (SBW992) x y F1 Cross1 Cross2 F2 F3 F4 Two small silicon pieces with a reference cross on the corner are glued on the MPC. We defined the x and y axis as in figure. We measured 4 points on the detector, by using the “F” on its corners in this way: F F#x[mm]y[mm] F#x[mm]y[mm] IPMU data Pisa data

FW class C sub-assembly (SFW995) x y F1 Cross1 Cross2 F2 F3 F4 Two small silicon pieces with a reference cross on the corner are glued on the MPC. We defined the x and y axis as in figure. We measured 4 points on the detector, by using the “F” on its corners in this way: F F#x[mm]y[mm] F#x[mm]y[mm] IPMU data Pisa data As expected, the subassemblies didn’t move during the shipment inside their MPC.