Positive Train Control Implementation of the Rail Safety Improvement Act Mandate: Elements of an Agreement?

Slides:



Advertisements
Similar presentations
Positive Train Control Benefits
Advertisements

1 Track and Time to a Train Field Presentation 2 The following presentation is an example of Track and Time Authority to a Train. You will need a blank.
SCORT/TRB Rail Capacity Workshop - Jacksonville Florida1 1  A Primer on Capacity Principles  New Technologies  Public Sector Needs 22 September
M3 - 1 The Road to Skilled Driving April 2006 Chapter 2 Signs, Signals and Roadway Markings.
FDA’s Proposed Rule under FSMA for Preventive Controls
1 Federal Railroad Administration Railroad Safety Advisory Committee On-Track Safety Adjacent Tracks Safety Advisory No April 27, 2004.
The Essentials of Train Operation Methods of Control- OCS and CTC
Signal Basics. Signals: –Allow for safe operation of trains – protecting your train, other trains, and the equipment –Lets the railroad operate more efficiently.
1 Union Pacific Railroad David Wickersham Chief Engineer, Western Region February 24, 2014.
Final Rule Positive Train Control Full Presentation Implementation of the Mandate Rail Safety Improvement Act of 2008 January 2010.
ISO 9001 : 2000.
Positive Train Control Allison I. Fultz Kaplan Kirsch & Rockwell LLP Washington, DC 2010 LEGAL AFFAIRS SEMINAR February 23, 2010.
Transport Railways Incident Procedures. Aim To give students information about the emergency procedures to be adopted at incidents involving railways.
Locomotive Horn Rule Regulations
©David F. Thurston, 2012, All rights reserved Capacity Implications of PTC now and in the Future David Thurston, Ph.D., P.E., FIRSE Vice President – Rail.
Conductor Decertification Discipline
Rev: Section 6 Alternative Fall Protection.
The Rail Safety Improvement Act of 2008 Issues For Rail Industry Contractors Kevin M. Sheys Partner K&L Gates LLP January 9, 2009.
Guidelines for Traffic Control at Surface Mines
CE 515 Railroad Engineering
Electronic Train Management System and Safety Larry Milhon March 9, 2007.
Ch. 4 Traffic Control NY State DMV.
Standing Committee on Rail Transportation Oklahoma City September 22, 2009 High-Speed Passenger Rail Safety Strategy Grady Cothen Deputy Associate Administrator.
May 20, 2008 Train Detection 1 Train Detection Systems Mid-States Highway-Rail Grade Crossing Safety Conference Session 4 Use of New Technology for Highway-Rail.
Slide 1 School of Engineering and Applied Science Center of Rail Safety-Critical Excellence Center of Rail Safety-Critical Excellence BRIEFING September.
ARRC Collision Avoidance System
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Levels of safety Priorities for eliminating hazards in the workplace Eliminate the hazard through the machine design stage Apply safeguarding technology.
Confined Spaces in Construction Subpart AA XX
1-1 Roles and Responsibilities. 1-2 Module Objectives  Recognize the roles of LEOs and others in work zones  List LEO responsibilities and expectations.
Positive Train Control Labor Briefing Washington, DC December 10, 2008.
 Classes of trains  Fundamental principles of track authority  Impact of power/ton ratios  Drivers of dispatch priority 22 September 2010 SCORT/TRB.
Doc.: IEEE ptc SubmissionKevin Nichter, Lilee SystemsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Operations Railroad Communica- tions Hazmat & Safety Personnel.
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
Advanced Preempted Crossings – A Case Study Tim Oster Railroad Project Manager City of Fort Worth Mid-States Highway-Rail Grade Crossing Safety Conference.
Office of Railroad, Pipeline & Hazardous Materials Investigations Right-of-Way Procedures & Safety Rules Compliance.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
C B T M Communications Based Train Management
1 PTC 101 A primer for PTC PTC 101 A primer for PTC.
Security and the National ITS Architecture ITS America 2003 Session 19: The State of the Practice: ITS and Homeland Security May 19, 2003 Minneapolis,
POSITIVE TRAIN CONTROL What it is, and what it does SCORT – September 2015.
1 PTC Update ACACSO May 2011 PTC Update ACACSO May 2011.
© American Public Transportation Association Advanced Train Operation PTC and CBTC.
Positive Train Control The impact of legislative changes SCORT Chris Heald September 22, 2009.
1 BLUE SIGNAL PROTECTION Blue Signal Protection of Workmen This rule outlines the requirements for protecting railroad workmen who are inspecting,
Higher Speed Rail: How Soon? Key Regulatory & Transactional Issues Kevin M. Sheys
49 CFR PART 240 Qualification and Certification of Locomotive Engineers.
Hazmat HM-246 Enhancing Railroad Tank Car Safety William S. Schoonover Chief, Hazardous Materials Division Federal Railroad Administration Presentation.
UNIT IV TRACK CONSTRUCTION. POINTS AND CROSSINGS Point and Crossings are peculiar arrangement used in permanent way to guide the vehicle for directional.
Final Rule for Sanitary Transportation. Background Proposed Rule: February 5, 2014 Public Comments: More than 200 Final Rule: On Display April 5, 2016.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Ron Hynes, Executive Director SCORT Conference Chicago, IL October 4, 2016.
MBTA/MassDOT RAILROAD QUIET ZONES
Positive Train Control
Guide for the application of CSM design targets (CSM DT)
ODOT Railroad Access & Safety
Issue Entry Permit Training.
University of Colorado A Line and B Line Grade Crossing Update
Commissioning and Testing the LHC Beam Interlock System
OVERVIEW: POSITIVE TRAIN CONTROL (ptc)
JSA Quality Assessment Tool Guidelines for Assessors
Freight Rail Policy Division
Designed-in Logic to Ensure Safety of Integration and Field Engineering of Large Scale CBTC Systems Author: Fenggang Shi.
Positive Train Control
PSS0 Configuration Management,
System Safety Regulation
System Safety Regulation
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Positive Train Control Implementation of the Rail Safety Improvement Act Mandate: Elements of an Agreement?

2 Overview PTC functions PTC territory PTC trains Process Training Updates and conforming changes Major issues remaining

3 PTC Functions Prevent train-to-train collisions Existing architectures effective Display restricted speed and enforce upper limit of restricted speed in certain instances (e.g., where permitted to pass red signal in TCS, joint authorities) Issue of side collisions at diamond crossings: given limited build out, enforce as to non-PTC line where two lines cross and where risk is relatively high

4 PTC Functions Crossing typeMax SpeedRequired (or safety equivalent to items listed) PTC route intersected by non-PTC route ≤ 40 mphInterlocking signal arrangement (non); enforced stop (PTC) >40 mphAbove + split-point derail and 20 mph MAS on non-PTC line Two PTC linesAny speedEnforce positive stop all routes

5 PTC Functions Prevent over-speed derailments Enforce permanent and temporary speed restrictions based on class of train Include restrictions associated with identified highway-rail grade crossing malfunctions No requirement to enforce equipment-specific speed restrictions, but encouraged where system design permits

6 PTC Functions Prevent incursions into roadway work zones Arrange system to prevent single point human failure Employee in charge to maintain control over entry For later implementation: portable roadway worker terminals

7 PTC Functions Prevent movement of a train through a switch left in the “wrong position” In dark territory, individual switches would be monitored with position detected and secured Sidings with speeds above 20 mph considered main line In signal territory, signal circuits may be used to verify route integrity (main line and controlled sidings) FRA to consider other approaches

8 PTC Functions Warn and/or enforce for identified hazards Hazard detectors tied into existing signal system would be given effect through the PTC system (typically route integrity detectors)— most likely to take warning followed by enforcement Railroads could interface additional detectors and provide for responsive action in PTC Safety Plan—many may warrant warning only Protect movements at moveable bridges

9 PTC Functions Higher speeds and auxiliary functions Above 59 mph passenger and 49 mph freight, functionality of block signal system, including fouling circuits and broken rail detection Above 90 mph, technology must be vital, perimeter protection must prevent unauthorized entry and rollouts Above 125, must demonstrate performance equivalent to high speed rail of same class internationally Above 150, must be integrated into system safety plan approved by FRA

10 PTC Territory For Class I railroads, their lines with 5 mgt and PIH/TIH traffic Intercity and commuter railroad lines Additional lines with equal or greater total risk (no agreement)?

11 PTC Territory Exceptions Tracks where all movements are by restricted speed (e.g., yards, industry tracks) Passenger terminals where speeds do not exceed 20 mph, movements are by signal indication, interlocking rules are in effect, and there is no freight traffic, subject to FRA review

12 PTC Territory Exceptions Passenger lines with limited freight operations under strict conditions, subject to FRA review 1. All trains limited to restricted speed; 2. Passenger and freight temporally separated; or 3. Risk mitigation plan showing that risk is no more than 1. or 2.

13 PTC Trains Typical application in train control is that all trains must be equipped (§ ) Requirement would become fully effective 12/31/2015, when PTC must be in place on all statutory lines Issue of latitude during cutover identified (no agreement) Failed trains (no agreement) Class II/IIIs seek latitude for interchange; Class Is take the position that Class II/III trains operating on their properties must be equipped (no agreement) Issue also presented regarding tourist and excursion trains in PTC territory (no agreement)

14 Process PTC Implementation Plan must be filed by April 16, 2010 Interoperability Deployment considers relative risk Accompanied or preceded by PTC Development Plan that describes the technology and supports a Type Approval Type Approval may be used by others. PTC Safety Plan incorporates PTCDP, incorporates by reference the current PTCIP, and provides basis for system certification

15

16 Process FRA to use web postings to announce pendency of PTCIPs, PTCDPs, PTCSPs Comments considered to the extent practicable given the limited time (90 days for PTCIPs) Railroads may include requests for discontinuance or material modification of existing systems, in which case comments to be fully considered before action is taken (same criteria as part 235)

17 Process Grandfathering for systems in service (short form certification) ACSES I, II ITCS BNSF’s ETMS, Configuration I Others approved under subpart H? Credits for showings made under subpart H through effective date of the new rule Option to proceed under subpart H where PTC is not mandated

18 Process Safety case showings Non-vital overlay: demonstrate 80% reduction in PTC-relevant risk Vital overlay: abbreviated risk assessment Standalone: full risk assessment; introduce no new hazards that have not been mitigated All systems Show mitigations related to use of management information system sources not subject to prior verification, CAD inputs

19 Process Field testing Independent assessment of verification and validation When requested by FRA Same criteria as subpart H May be for all or portion of the system FRA endeavors to advise of expected requirements during PTCDP review

20 Process During build-out, equipped PTC trains run responsive to PTC system where in place, but unequipped trains are allowed Complete PTC deployment by 12/31/2015 New railroad service / lines within mandate to cut over PTC prior to initiating service Grace period for new passenger rail starts?

21 Training Training per subpart H for all employees affected, including— Train crews Dispatch personnel Signal and train control personnel (including shop personnel maintaining and testing on- board equipment) Roadway workers Contractor employees included Line supervisors included

22 Updates and Conforming Changes Limited updates, corrections, and clarifying amendments to subpart H and appendices that are used for subparts H and I

23 Major issues remaining No agreement on— Whether to address gaps in statutory route structure (other major hazmat lines, if any; Class I captives over which they operate, such as switching and terminal railroads) Unequipped trains in PTC territory Displays visible to each assigned crew member in cab