Www.kockw.com Kuwait Oil Company Commercial Support Group Supplier Relationship Management Team PRE-QUALIFICATION OF CONTRACTORS AND MANUFACTURERS 2016.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Course Material Overview of Process Safety Compliance with Standards
Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
Transition from Q1- 8th to Q1- 9th edition
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Generation Business Line
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Prequalification Process / Subcontract Lisa Conomy Construction Counsel, OSU Lane Beougher State Architect.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Chapter 3 Project Initiation
Contractor Safety Management
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
The ISO 9002 Quality Assurance Management System
PROCEDURES FOR SELECTING THE CONTRACTOR
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
ZHRC/HTI Financial Management Training
Procurement Presentation Alan Brett Contracts Officer HSE.
Obtaining Surety Credit An Introduction to the Surety Process for Contractors and Subcontractors.
Welcome to the Board! (and did we mention your Fiduciary Responsibility?)
VALIDATION METHODOLOGY
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon.
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
United Nations Procurement Division
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
State of Connecticut Consultant Selection Office 2015 Consultant Prequalification Process Presented by the Connecticut Department of Transportation (CT.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
“Quality with Passion”. About us Induspect (India) Pvt. Ltd. is a company established to provide inspection and Technical Manpower Supply services to.
“SPEAR” W ORKSHOP O CTOBER 19 & 30, 2015 ANGELLE GOMEZ S UBAWARD R ISK A SSESSMENT / MONITORING.
Office of Procurement Services.  Vendor Application Website: 
The Procurement Channel and the Procurement Working Group of the Joint Commission February 2016RELEX, Brussels1.
Individual Work Plan (IWP). Objectives Describe the purpose of the Individual Work Plan (IWP) Discuss when to submit an IWP The IWP as a living document.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
ISO 9001:2015/14001:2015 Certification Transition Process
EPPSS 1 Frequently Asked Questions What are the recommended technical specifications for using ePPSS? 1 Relatively modern workstation and recent Operating.
마스터 제목 스타일 편집 Overview of K-MAS Commercialization & Competitiveness Products with similar quality, function and specification Standardized specification.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Update of API Standards for Supply Chain Management API Standard 20J – Qualification of Distributors.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
How to succeed in International Tenders Ing. Miloš TKÁČ MTC – Engineering / Consulting / Sales Južná trieda 93 – P.c. Strojár, Košice tel.: 055 / 6808.
Planning meetingCertification audit, stage 1 Pre-audit (optional) Document review Prior to every certification audit a planning meeting is conducted where.
Presentation by ET Marchak Consulting November 30, :45 pm – 3:00 pm.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
Minimum Set of Requirements for Suppliers
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RFP /2017/00033 Supply and delivery of Corporate Uniform Date: 07 July 2017 Time: 11:00.
Minimum Set of Requirements for Suppliers
Award Management Services
Understanding The Benefits Of Surety Bonds
Quality Management Systems – Requirements
Audit Planning & Service Method Geotek Global Certification Pvt. Ltd.
Inspection and Testing
GDPR – Practical Implementation Managing contracts, procurement and relationships with suppliers Terry Brewer Chief Executive.
Lockheed Martin Canada’s SMB Mentoring Program
The Evolution From No Regulations To 2.0 e-Procurement system
PROJECT DELIVERY METHODS
Development of a specification
Operationalizing Export Certification and Regionalization Programmes
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
How to conduct Effective Stage-1 Audit
United Nations Procurement Division
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Kuwait Oil Company Commercial Support Group Supplier Relationship Management Team PRE-QUALIFICATION OF CONTRACTORS AND MANUFACTURERS 2016

1 Introduction  Kuwait Oil Company (“KOC”) conducts a thorough pre-qualification exercises with an objective to obtain lists of qualified contractors/manufacturers, who posses the experience, has the capabilities and the credentials, with solid financial stand and applying up to date high standards (HSE/Quality) to provide upstream and midstream works/services/products.  KOC implements OPEN ONGOING prequalification concept whereby interested contractors/manufacturers can apply for prequalification under any of the existing categories, at any time.  Single point of contact for communications with contractors and manufacturers with respect to prequalification or introduction of any new services or products to KOC : – Team Leader Supplier Relationship Management – PO Box: 9758, Ahmadi 61008, Kuwait – E mail: – Telephone:

2 Established Categories  94 main categories of works for contractors with total of 167 subcategories  133 main categories for manufacturers with total of 253 sub-categories.

3 Established Categories  These categories of works and products are covering wide range of services & products, such as and not limited to the following: These categories of works and products are covering wide range of services & products, such as and not limited to the following: CONTRACTORSMANUFACTURERS - EPC PROJECTS - DRILLING OPERATIONS AND SERVICES - WELL SURVEILLANCE - INSPECTION, CORROSION & PROTECTION SERVICES - PIPE LINES & FLOW LINES WORKS - MARINE SERVICES - HSE & ENVIRONMENTAL CONSULTANCIES & SERVICES - MECHANICAL & MAINTENANCE WORKS - GEOPHYSICAL WORKS/SPECIALTIES - GAS SERVICES - RECRUITMENT SERVICES - SECURITY AND FIRE SERVICES - INFORMATION TECHNOLOGY - PIPES - PIPE FITTINGS - PUMPS - VALVES - GAUGES - PROTECTIVE EQUIPMENT - LINER HANGERS - LIFTING EQUIPMENT - OCTG (CASING, TUBING & PREMIUM CONNECTIONS) … ETC.

4 Evaluation Process  All PQ Applications received shall be evaluated as follows: CONTRACTORSMANUFACTURERS  Commercial Evaluation ( organization and structure )  Technical Evaluation ( Previous and current projects, manpower, equipment, facilities, QA/QC )  Financial Evaluation  HSE Evaluation  Commercial Evaluation  Technical Evaluation  Financial Evaluation  QA/QC  The applicant should be accepted under the above areas in order to be considered as an approved/qualified  During evaluation, clarification process may be conducted, in order to clarify/requesting any missing documents or information  applicant shall allow KOC to visit its premises/ facilities to verify and explore its capabilities (if required)

5 Process For Establishing New Category  New PQ exercise is issued with open and closing dates, where all applications should be received within this period  Advertisement shall be published for the respected new prequalification exercise/program in Kuwait Official Gazette and selected local / GCC and International newspapers  Upon finalizing the PQ exercise/program, a new category of work shall be established  After establishing the new category of work, new applicants may submit their applications

6 Offering New Services / Products to KOC  Contractors/Manufacturers offering services, products or expertise which are not covered under any of the Company’s Categories shall be treated as a New Service/Product Providers.  Service/Product Providers shall submit their request through submitting their complete profile of their experience and resources with clear description of the type of services/products that can be provided to the Company.  Such requests shall be forwarded to the concerned Teams/Groups for their evaluation and to determine the KOC’s needs.

7 Areas For Consideration  Only legal established entities can be pre-qualified.  If the applicant is a wholly owned subsidiary entity, part of group of entities, then the application must be for the entity who shall actually perform the services/work in the event a contract was awarded.  Prequalification shall be granted for the applicant’s entity only and shall not include prequalification of any parent or sister or subsidiary companies.  Separate PQ application is required for each category of work. Contractors:

8 Areas For Consideration  KOC Pre-Qualifies manufacturers only (not assembler/ System Integrators/ Suppliers/ Stockiest).  Manufacturers Should have their own design, manufacturing & testing capabilities through well organized management system.  Separate Application is to be submitted for each Manufacturing facility and for each category  Manufacturers Should have minimum 5 years of proven manufacturing experience in the same business.  Evidence of having applicable international monogram/ certifications such as ISO / ASME / API / ASNT / NB...etc.  Experience with international Oil & Gas companies are mandatory for most categories of works and products.  All approved contractors/manufacturers are subject to periodical verification Manufacturers:

9 How To Prequalify By submitting the related PQ application(s), available in KOC website as follows E-Tendering Application for pre- qualification under KOC categories Application for Manufacturers Application for Contractors

10 Frequently Asked Questions  What is the duration to get qualified with KOC? - As soon as the PQ application received by KOC, the evaluation process will starts, the average duration is 1~2 months, however it depends on the PQ submittal itself, whether it is fulfilling all the requirements, or clarification rounds are required.  Being an international entity, should I have a local agent to get prequalified? - No, Local agent is not mandatory requirement during prequalified stage, the international entities can submit their PQ application directly to KOC.  What sort of action entities need to take if they are exempted from issuing audited financial statements? - Audited Financial Statements for the recent three years are mandatory to conduct the required financial evaluation, if an entity doesn’t have these statements for some reason, they may relay on a parent company (if available) in accordance with related conditions, or they have to prepare these statements to proceed further.

11 STATISTIC  Approved Contractors/Countries

12 STATISTIC  Approved Manufacturers/Countries

THANK YOU