Diplomacy, Technology and Finance: ESCAP’S Way Forward to Asia-Pacific Information Superhighway Expert Consultation on the Asia-Pacific Information Superhighway.

Slides:



Advertisements
Similar presentations
Ashish Narayan, Advisor, ITU Regional Office for Asia and the Pacific
Advertisements

1 Session 3 Bridging Digital Divide through Innovative & Creative Digital Economy Background Paper Ms. Sireerat Bunnag Project Manager ITU Regional Office.
International Telecommunication Union Committed to Connecting the World Global and Regional Broadband trends Workshop on Regulatory policies on universal.
SADC Forum on Analogue to Digital Migration Workshop Present Emerging and Future Broadband Technologies and potential uses 27 – 31 August, Mozambique 2012.
International Telecommunication Union HIPSSA Project Support for Harmonization of the ICT Policies in Sub-Sahara Africa The assessment of international.
Facilitation of Broadband in SATRC Countries: Bangladesh
Cross-Sector Infrastructure Sharing Réseau Arabe des Régulateurs des Télécoms et des Technologies de l'information Rabat, March 6, 2014 Rajendra Singh,
Infrastrukturë Backbone ALBANIAN NATIONAL FIBER OPTIC NETWORK.
IP connectivity in the Least Developed Countries Dr Tim Kelly, ITU Workshop, Geneva, April 2002.
Potential and prospects of strengthening transport connectivity in South and South-West Asia Nagesh Kumar.
Mobile Broadband: Way Forward to Bridge Digital Divide Bhutanese Experience Wangay Dorji HEAD, Telecommunications Bhutan InfoComm and Media Authority Africa.
International Telecommunication Union Committed to Connecting the World Speeding-up the NGN Ubiquity: A Pilar for Digital Growth Athens, Greece February.
A Case Study of Kenya’s National Broadband Strategy
ESCAP, Information and Communications Technology and Disaster Risk Reduction Division Connecting economies and empowering people Asia-Pacific Information.
Google Fiber Planning to build and test an experimental ultra high-speed fiber optic broadband network. Deliver internet speeds 100 times faster than.
© 2007 Verizon. All Rights Reserved. PTE /07 FCC Workshop Global Broadband Connects the World Jacquelynn Ruff Vice President, International Public.
Abu Saeed Khan Senior Policy Fellow, LIRNEasia Longest International Open-access Network CommunicAsia 2011 June 22, 2011 Singapore.
Press launch Doha, Qatar 6 March 2012 Cosmas Zavazava Chief Project Support and Knowledge Management Department ITU/BDT.
 Introduction  History  Responsibilities  Policy Goals  Satellite Communications  Space Policy  Space Policy.
LANDLOCKED DEVELOPING COUNTRIES HARNESSING ICT OPPORTUNITIES
Digital Content & IP Transit Growth Caspian Telecoms, Istanbul, Turkey, 24 th April 2014 Konstantin Novikov Wholesale, CIS countries.
Program for Development of Broadband Internet Access in Republic of Moldova and results of its implementation.
Advisor : Kuang Chiu Huang Group : Ting Wei Lin,Ting Huei Lee, Kuei Chin Fan Transit & peering Taiwan Internet Interconnection problem.
1 Internet Society Creating an Enabling Environment for the Internet: Role of IXPs ENOG 8 – 9 September 2014, Baku Maarit Palovirta, European Regional.
Future of Africa’s iGDP Protect. Connect. Grow.. Is Africa still a significant market? Africa is the 2nd largest continent, in both size and population.
International Telecommunication Union Ebrahim Al Haddad, Regional Director, ITU Innovation and Technology Day, 24 th April 2012, Doha.
Introducing Connecting our communities; past, present and future. Workshop 2009.
Increasing Access, Reducing Costs Consolidation and Management of the Bandwidth Consortium SANDRA ALUOCH.
TASIM Trans Eurasian Super Information Highway Summary Presentation October 2010.
Digital Silk Rout Regional Interconnectivity toward better and faster social and economic development Baryalai Hassam Deputy Minister Technical September.
Internet Access and Digital Divide-Nigeria Victor CHUKWUMA, Department of Physics, Olabisi Onabanjo University, PO Box 351, Ago- Iwoye Ogun State, NIGERIA.
Conselheiro José Leite1 JOSÉ LEITE PEREIRA FILHO Member of the Board PORTO SEGURO, BA 4 JUNE 2001 ITU-T SEMINAR Multimedia in the 21st Century.
The Public Voice in Emerging Market Economies Dubai, U.A.E., 15 January 2001 Access & Equity OECD Work on the Digital Divide John Dryden, OECD/ICCP.
TASIM/EuraCA New Platforms for Improving Connectivity in Eurasia.
The importance of strengthening strategic telecom alliances.
New Opportunities through New Technologies Wireless and Satellite Communications Jack Rigley Vice President Satellite Communications Research Communications.
1 4th Southern Africa Regional Broadband, Next Generation Networks and New Technologies Workshop 2014 Midrand, Johannesburg, South Africa November.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
TÜRK TELEKOM AT A GLANCE Mehmet C. TOROS Senior Vice President Türk Telekom.
World Water Forum IV Civil Society Engagement in Kathmandu Water Supply Reforms Nepal Experience NGO Forum for Urban Water and Sanitation 19 th March 2006.
Technology Advisory Committee Status and Interim Report July 14, 2008 Gary Gomes.
Introduction to the Networked Communications Environment Lisa Horner, Global Partners.
Unlocking Asian Borders for New Avenue to Revenue Pacific Telecommunications Council Honolulu, Hawaii January 18, 2016 Abu Saeed Khan
International Telecommunication Union « Overview of the ITU-D satellite activities focusing on IP issues in Developing Countries » Workshop on Satellites.
Mohamed El Bashir Technical Affairs Dpt. Manager Communications Regulatory Authority The State of Qatar Telecom Laws and Regulations Forum Telecommunications.
Development Authority of the North Country 317 Washington Street, Suite 414 Watertown, NY An Economic Development Initiative.
A P LAN TO C ONNECT W EST V IRGINIA ’ S C OMMUNITIES.
Inês Nolasco Senior Regulatory Affairs Manager European Competitive Telecommunications Association.
BOFINET NETWORK PRESENTATION
International Internet Statistics ITU ICT Indicators Meeting February 10, 2005.
State of Telecommunication/ ICT Indicators in Bangladesh Akber Hossain Ministry of Science and Information & Communication Technology Government of the.
© GSM Association 2009 UNIVERSAL ACCESS: MOBILE VOICE, DATA, BROADBAND FOR ALL Robindhra Mangtani, Senior Director, Government & Regulatory Affairs, GSMA.
Abu Saeed Khan Senior Policy Fellow, LIRNEasia Making broadband affordable in RECC, UNESCAP September 5, 2012 Colombo.
Connect Africa Summit Kigali, Rwanda October 2007 Outcomes Report Mr. Sami Al Basheer Al Morshid Director, Telecommunication Development Bureau,
Oman TRA – Telecom Regulation and Law Forum Mohamed El Bashir Technical Affairs Dpt. Manager Access Disputes and Open Access 9 February 2015.
P. Vigneswara Ilavarasan, PhD
Unleashing Infrastructure Synergies Across Sectors
Abu Saeed Khan Senior Policy Fellow, LIRNEasia
4th Generation Regulation
Back to basics in cross-sector infrastructure sharing
Broadband fest and famine in Asia
Broadband fest and famine in Asia
Istanbul: Emerging Gateway of Eurasia
P. Vigneswara Ilavarasan, PhD
bridging the digital divide through regional cooperation
Terrestrial Transmission Networks in Africa
4th Generation Regulation
IP connectivity in the Least Developed Countries
4th Generation Regulation
CAREC REGIONAL INTEGRATION INDEX
Presentation transcript:

Diplomacy, Technology and Finance: ESCAP’S Way Forward to Asia-Pacific Information Superhighway Expert Consultation on the Asia-Pacific Information Superhighway and Regional Connectivity Thimphu, Bhutan. October 2, 2014 Abu Saeed Khan Senior Policy Fellow LIRNEasia

Unique mobile users are 50% of connections being sold Source: GSMA, The Mobile Economy, ASIA PACIFIC 2014.

Asia is a diverse market Source: GSMA, The Mobile Economy, ASIA PACIFIC 2014.

The great Asian broadband divide Source: GSMA, The Mobile Economy, ASIA PACIFIC 2014.

Median IP transit prices per Mbps per month on Q Prices exclude local access and installation fees. Source: TeleGeography. Publication: Global Internet Geography Prohibitive wholesale internet bandwidth in Asia

Meshed and resilient telecoms ROW Connecting 32 Eurasian countries with EU through 141,000 km of standardized roadways.

IntegratedIntegrated map of highway & railway Roads are red.

Each country’s share in Asian Highway (There are 10 LLDCs)

Submarine networks = Terrestrial networks Landlocked countries = Coastal countries Courtesy: Ciena

Roadblocks to affordable Internet Source: The state of Broadband 2012: Achieving digital inclusion for all. ITU/UNESCO Broadband Commission.

Costs of civil works in fiber deployment FranceApproximately 80% United KingdomBetween 70% and 80% Republic of KoreaBetween 80% and 90% European UnionApproximately 80% MENAApproximately 80% OECD average (2008)Between 50% and 80% Source: “Harnessing cross-sectoral infrastructure synergies.” ESCAP. August 27, Right-of-way (ROW) = ?%

“Anytime a roadway is opened up for any purpose, conduit is installed, which cuts the cost for later deployment of fiber by 90 percent or more in some cases. The conduit itself costs almost nothing; it’s the labor cost to open up the street and then close it up later that is the bulk of the cost. By installing conduit any time construction is going on, the cost of that construction is amortized over all projects that later utilize the conduit, reducing costs dramatically and minimizing disruption to drivers.” Milo Medin, Vice President of Access Services, Google Inc. April 18, 2011 Conduit of fortune

“Anytime a roadway is opened up for any purpose, conduit is installed, which cuts the cost for later deployment of fiber by 90 percent or more in some cases. The conduit itself costs almost nothing; it’s the labor cost to open up the street and then close it up later that is the bulk of the cost. By installing conduit any time construction is going on, the cost of that construction is amortized over all projects that later utilize the conduit, reducing costs dramatically and minimizing disruption to drivers.” Milo Medin, Vice President of Access Services, Google Inc. April 18, 2011 Conduit of fortune

“Noting that some states were levying hefty RoW charges, equivalent to Rs 1.27 crore (US$ 208,000) per km, DoT has urged states to scrap such practices, failing which NOFN project costs would shoot up and scuttle the Centre's ambitions of delivering affordable broadband services. DoT has reached out to states as there has scarcely been any progress in laying down optic fibre over the past three years.” Lesson from India: ROW up to $208,000/km.

Lessons from Africa’s terrestrial projects Fiber not being buried deep enough – Frequent physical damage (accidental and deliberate). Poor quality splicing – Intermittent faults and reduction in throughput Poor maintenance of manholes – Leads to flooding and cable damage. Poor systems and processes for fault management – Sometimes the maintenance companies deliberately sabotage cables to create work for themselves. Source: Philip Bates, Analysys Mason, April 2014

Asian Information Superhighway: Core objectives Creating a cross-border telecoms consortium of 32 countries being linked through the Asian Highway. – Example: Intelsat (Past) and SEA-ME-WE3/4/5 (Present). Using Asian Highway’s right-of-way (ROW) for open-access optical fiber transmission networks. – Highways are preferred ROW for long distance telecoms. Each country’s road authorities will own the fiber. – State-ownership and open-access guaranteed. No payment is required for ROW. Only the licensed operators will have access to it. – No regulatory disruption.

Suggested way forward for ESCAP Internal activities 1.Conduct route survey of Asian Information Superhighway. 2.Design the network and assess the costs of C&M. 3.AH members endorse the concept of Asian Info Superhighway and approve the C&M Agreement. 4.Finalize C&MA and award the project. External activities 1.Get engaged with partners (World Bank, ADB, ITU, APT, SATRC, BIMSTEC etc.) 2.Make the long distance telecoms carriers on board. 3.Effectively disseminate the status of Asian Information Superhighway.