Safety at CERN in the INB Context, J. Poole, July 2007 Safety in the INB Context and its Impact on Access John Poole AB-SU.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Managing the Health and Safety of Contractors
Configuration Management
Ghislain Roy Safety Unit Accelerators and Beams Department CERN.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
IAEA RER/9/111: Establishing a Sustainable National Regulatory Infrastructure for Nuclear and Radiation Safety Regional Workshop on Drafting Regulations.
Substantive environmental provisions Prof. Gyula Bándi.
ICAO Provisions for Safety Management
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
The RTD Group NORM TRAINING: Increasing Awareness, Reducing Exposure Richard van Sonsbeek Röntgen Technische Dienst bv Dept. Radiation Protection Services.
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
17 July 2002RSOC presentation G.D. 1 NEW SAFETY CODE A9 Origin –Revision of SAPOCO 42 document Main modifications: –Official name becomes SAFETY POLICY.
Information Systems Security Computer System Life Cycle Security.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
05/05/2006P.Fassnacht - LEAF1 INB – Status report RPS, RGE: done! Zoning Traceability.
1 International Working Forum on Regulatory Supervision of Legacy Sites (RSLS) Technical Meeting Amel MELLOUK – ASN / DRC Jérémie VALLET – MEDDE/MSNR Regulatory.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Geneva, Switzerland5-7 April, 2004 Monitoring of radioactively contaminated scrap metal in Latvia A.Dreimanis (Radiation Safety Centre, Latvia)
Handling Electronics from Radiation Areas N. Conan, D. Forkel-Wirth, T. Otto, S. Roesler, C. Theis, C. Tromel, V. Tromel, Heinz Vincke, L. Ulrici R2E,
Health and Safety Policy
Radiation testing in facilities outside CERN EDMS document version 2.0 Heinz Vincke - RadWG meeting 6/7/2010.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
Important informations
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Management Systems Part II.
Clean-up of former nuclear sites and the role of the Planning regime Jim Cochrane.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
© Mahindra Satyam 2009 Configuration Management QMS Training.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
State Nuclear Regulatory Committee of Ukraine Development of Regulations Development of Regulations School for Drafting Regulations on Nuclear and Radiation.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Safety Matters for External Contractors Work of 1st category –W.Weingarten TIS/GS STTC –29/5/2000.
Radiation Protection info update C. Adorisio (DGS/RP) 17 th LTEX Meeting
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
International Technical Safety Forum CERN, Geneva, Switzerland, April 12-16, 2010 CERN Safety Coordination How it functions M. Arnaud, C. Bedel, J. Etheridge,
Health and Safety Coordination at CERN Environmental Health and Safety managing risks today for a safer tomorrow John Robert Etheridge, Emmanuel Paulat,
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Radiation Protection computing tools Gérald Dumont HSE/RP.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Health and Safety Policy
Safety in Construction and Upgrade Phases
Quality Assurance applied to Accelerator Safety
EP Experiments safety validation process Safety Permits
Radiation protection organisation
Reference Manual update Item 5.2 of the agenda
ESS Handbook on Radiation Protection Chapter 6 – Dosimetry
ESS Handbook for Radiation Protection
Radiation Protection Handbook
Radiation Safety Information Management System (RASIMS)
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

Safety at CERN in the INB Context, J. Poole, July 2007 Safety in the INB Context and its Impact on Access John Poole AB-SU

Safety at CERN in the INB Context, J. Poole, July Aim of this Talk Explain what the “INB” is Describe CERN’s position with respect to the host states in matters of safety Give an overview of the impact of the recent licensing process for access

Safety at CERN in the INB Context, J. Poole, July 2007 Short Version There is no direct impact but…

Safety at CERN in the INB Context, J. Poole, July Context with respect to France At CERN’s request an international treaty (convention) was signed in 1984 for LEP. –CERN and the State of France agree that LEP will be considered as an INB. CERN is therefore not listed as an INB but the parts of our installations within the agreed perimeter are open for inspection like all of the official INB’s in France in as much as this is compatible with CERN’s status as an International Organisation. LEP was dismantled under the 1984 convention –Safety documents were submitted and our plans were approved. The 1984 convention was replaced by a new one covering the LHC and SPS and in an addendum, CNGS.

Safety at CERN in the INB Context, J. Poole, July Consequences of being INB An operator of a facility writes his own safety rules and procedures and submits them to the French authorities for approval. The technical experts from the French authorities analyse the documents and say if they think that they are satisfactory or not (without proposing solutions to any problems which they find). The final package is reviewed by an independent (French) panel which reports back to the licensing authority who then authorise (or refuse) operation of the facility. During operation of the facility the French authorities carry out formal inspections, verifying that what has been written in the safety documentation is being followed.

Safety at CERN in the INB Context, J. Poole, July Tripartite Meetings CERN also reports separately to the Swiss authorities. In order to have a coherent approach, a high level tripartite committee comprising CERN’s management, the head of the French authorities and the head of the Swiss authorities, meets regularly to discuss radiation safety matters.

Safety at CERN in the INB Context, J. Poole, July INBIG In Summer 2003 the INB Implementation Group completed its report which defined a new strategy for handling radiation safety in the accelerators in the context of our inter- governmental status. The major conclusions of this report were: –We should apply our rules and procedures across all of CERN’s accelerators and experiments in exactly the same way. –A quality assurance culture should be progressively introduced for the accelerators, starting with the INB. –Pragmatic radiological zoning for waste should be implemented. –Traceability procedures should be simplified. This strategy was approved by the Directorate at the time. This strategy has also been discussed and agreed at the Tripartite meeting.

Safety at CERN in the INB Context, J. Poole, July Safety Documentation The major reports submitted to the host state authorities were: Rapport provisoire de sûreté (RPS)~850 pages Règles Générales d’exploitation (RGE)~150 pages Étude déchets (ED) [5 volumes]~450 pages Plan d’urgence interne (PUI)~150 pages

Safety at CERN in the INB Context, J. Poole, July Supplementary Documents Mini reports for –SPS Access System –CNGS startup –LHC sector test (not sent) Hundreds of pages of supplementary information requested by the French authorities following written requests, visits and meetings. Major revision of 50% of the RPS and RGE before November Between December 2006 and April 2007 we wrote more than 300 pages of replies to specific written questions from IRSN about the safety documents.

Safety at CERN in the INB Context, J. Poole, July RPS Part I is a description of the facilities Part II is an analysis of the risks and a description of how they are/will be managed. Annexes: LHC access system SPS access system

Safety at CERN in the INB Context, J. Poole, July 2007 Analysis by the Authorities The analysis focused on radiation protection and access. Some weaknesses were exposed during the analysis and modifications were introduced.

Safety at CERN in the INB Context, J. Poole, July Ramifications of the Safety Documents There is nothing more than was anticipated in the INBIG document and we are coming into line with other major laboratories. Main areas of impact (cost) are: –Quality management –Formalised procedures everywhere –Radiation Protection activities –Environment Protection activities –Waste management and disposal –Ventilation and access systems –Alarms and safety devices

Safety at CERN in the INB Context, J. Poole, July 2007 Impact for Access Systems The main impact will be in the area of testing both for the commissioning and during the following years. A full quality management process must be applied and this will require planning and documentation.

Safety at CERN in the INB Context, J. Poole, July 2007 Undertakings by CERN – subset Send safety file concerning the upgrade of the SPS Access System before the modifications are introduced. Send an Annual Safety Report –During the first years of LHC operation to include a number of specific items in the annual report in addition to the regular: List of incidents Inventory of releases and waste production Summary of personnel dosimetry Summary of periodic testing results (e.g. DSO access system tests) 14

Safety at CERN in the INB Context, J. Poole, July 2007 Further Undertakings By the end of 2007 Update the RPS to include all of the information sent since the full documents (v. 1) were submitted (~1man-year). Update and complete the RGE to include all of the information sent since the full documents (v. 1) were submitted. –In this case there is still a lot of work to be done (3-5 man-years), particularly concerning the chapters on Quality Assurance, Radiation Protection procedures, procedures during incidents and routine tests. 15

Safety at CERN in the INB Context, J. Poole, July 2007 The Strategy for Implementation The Safety Documents respect the strategy defined in the INBIG report. It is worth noting at this stage that although there are many more activities which have to be carried out in the coming years, they are driven by CERN’s regulations, not the French or Swiss regulations. A concentrated effort has been made to find pragmatic and simple procedures in all areas of safety. 16

Safety at CERN in the INB Context, J. Poole, July 2007 Cultural Change The complexity and greater risks which we will face in the LHC era mean that a more rigorous approach by everyone is required. This will be manifested in more formal procedures and more paperwork and it will affect everyone. Some degree of work planning will be involved for every intervention in LHC 17

Safety at CERN in the INB Context, J. Poole, July 2007 Implementation The main impact will be in the following areas: Safety document maintenance Quality assurance procedures (operation and auditing) Training Radiation protection procedures (optimisation/ALARA) Buffer zones and traceability systems Waste management (logistics, legal and contractual aspects and quality management) 18

Safety at CERN in the INB Context, J. Poole, July DIMR – Before Access A safety document concerning an intervention in a radioactive area containing: 1.General Description 2.Radiological Conditions 3.Approvals (RP, Technical Manager, Contractor, DSO/RSO 4.Procedures and special precautions 5.Dose results –Lessons learned and dose follow up 6.Operational procedure –Lessons learned and operational follow up

Safety at CERN in the INB Context, J. Poole, July 2007 Traceability Traceability of equipment will be achieved using the standard methods available to us. –Internal documents (transfer slips) –Asset management systems (MTF) & barcodes –Simple labelling for legacy systems (PS, SPS …) –Contractual documents (customs, invoices for scrap etc.) –Waste will be handled by RP using their own tools 20

Safety at CERN in the INB Context, J. Poole, July 2007 Control of Material Flow All equipment leaving the accelerator and experimental areas must be checked for radioactivity. –This will mostly be done in the buffer zones A zoning of the accelerators and experiments has been defined (radioactive and conventional areas). –The boundary between two such zones may be inside a 3 dimensional volume Equipment will be measured before it can leave the area. 21

Safety at CERN in the INB Context, J. Poole, July 2007 ATLAS Zoning 22

Safety at CERN in the INB Context, J. Poole, July 2007 LHC Dipole Zoning 23

Safety at CERN in the INB Context, J. Poole, July Each area is classified into one of the following Appropriate procedures are defined for each area Radiological Zoning

Safety at CERN in the INB Context, J. Poole, July 2007 Radiological Zoning in LHC after beam 25

Safety at CERN in the INB Context, J. Poole, July 2007 The Doctrine Anything coming from within a volume which has been defined as one which will produce radioactive materials will be classified as radioactive (even when it is not radioactive). Such materials will be classed as radioactive waste once they become waste. If radioactive materials are found within a conventional area there must be an investigation and possible revision of the official zoning. 26

Safety at CERN in the INB Context, J. Poole, July 2007 Buffer Zones Separate areas for radioactive and conventional materials Large items (like magnets) will be handled on a one-off basis with special provisions for radiation measurements and traceability 27

Safety at CERN in the INB Context, J. Poole, July 2007 Training Radiation protection for radiation workers –New courses tailored to the individual’s needs Procedure preparation/writing Quality management Training concerning specific procedures –e.g. searching the underground areas, access procedures, traceability etc. Training for specific activities e.g. vacuum interventions in TCC2 28

Safety at CERN in the INB Context, J. Poole, July 2007 Operations Running within operating limits –Operators must know the limits and stay within them MDs may require that a particular operational limit is exceeded but this must be compensated in some way –Such experiments will require approval by Chef d’Installation Operations will be increasingly dependent on formal procedures (access, maintenance etc.) 29

Safety at CERN in the INB Context, J. Poole, July 2007 Long Term Each year we need to compile the information required for the annual safety report –This will be an on-going process, collecting information throughout the year. Changes to the accelerators and our procedures need to be recorded in the safety documents –They are living documents After five years of operation we need to submit a definitive safety report to the French authorities –We are currently working with the provisional version which says what we expect to build and implement. 30