Lockheed Martin Additive Manufacturing Introduction to Engineering Design EDGSN 100 Section 002 Family First Designs/ Team 5 (Carolyn Baker,

Slides:



Advertisements
Similar presentations
LANDING GEAR SHOCK ABSORBER DESIGN
Advertisements

Miniature Modular Rack Launcher Combo Senior Design Group 3 Casey Brown Cyril John Keith Kirkpatrick Bryan Rickards.
Preliminary Design Review. Rocket & Payload Schematic.
Adjunct Missile Seeker Deployment Mechanism Concept Review University of Arizona Raytheon Missile Systems.
Moonbuggy Rear Suspension Analysis ME450: Computer-Aided Engineering Analysis Department of Mechanical Engineering, IUPUI Instructor: Dr. Koshrow Nematollahi.
Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
Balance and Trim ATC Chapter 3.
Prosthesis Device for paraplegic people Jorge J. Corujo Javier Cruz Irvin De La Paz Francisco Torres.
Miniature Modular Rack Launcher Combo Senior Design Group 3 Casey Brown Cyril John Keith Kirkpatrick Bryan Rickards.
Low Energy Printing Project P10505 David Hatch. Outline Introduction Competitive Technologies Objectives and Markets Project Requirements Future Vision.
GPS Vehicle Tracking/Payload Release System For Small UAV Project Team
Shear - Tensile - Compression Stresses Slip Ted 126 Spring 2007.
University of the Pacific1 PFADS Project Team P.O.C. Gavin Saito Miguel Perez Michael Bruch December 5, 2002 University of the Pacific Introduction to.
Trebuchet Design Project Presentation Team H.E.D. Huy Nguyen | Edward Lau | Daniel Vizcaino Lab Section Tuesday 4-6 PM.
Project Management Tools Utilized in Tech Transfers Morning Session #1 Robert Beall, PMP.
Team Weatherman Completed Design Review James Banks, Test Engineer Katonio Butler, Electrical Specialist Alex Cutting, Structural Engineer Lori Huberman,
Falling Drop Experiment A study on liquid- liquid extraction using a single drop Team Leader:Thomas Salerno Group Members:Gregory Rothsching An Du.
Beams – Internal Effects The external load applied to a beam can cause changes in the shape of the beam, it can bend for example. We do not want.
Electrosurgical Life-test Fixture Team E.L.F. Design Review Mechanical Engineers Mary Hamann Brad Watson Naomi Sanders Electrical Engineers Tony Giedl.
1 Coupling Design Section VII. 2 Coupling? Classifications of Coupling A) Rigid Coupling B) Flexible Coupling Analysis of Bolts Talking Points.
Project Plan Reverse Engineering of a Radio Control Race Car
Chapter 1 Stress.
Bridge Design Report Jeremy Hennings Matt Kilmer Tim Williams Nina Mairena.
Development of a Remote External Repair Tool for Damaged or Defective Polyethylene (PE) Gas Pipe Presented by Kenneth H. Green, President Timberline Tool.
Earthquakes Chapter 6 February 2012 This topic will shake you up.
Chapter 9 Static Equilibrium; Elasticity and Fracture
Skeye. Personnel John Spurgeon Daren Dotson Michael Bailee Collins.
Group 1: Material Testing Device Jobe Dyson Brie Witherspoon John Chandler Brett Newstead.
Lecture 5: Climb PERFORMANCE
FRR Presentation IF AT FIRST YOU DON’T SUCCEED, TRY AGAIN… AND AGAIN AND AGAIN AND AGAIN.
Design Partition, Project Plan, Task Assignments and Conceptual Designs September 13, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher.
Abstract Intramedullary nails (IN) present one method of repairing long bone fractures. Upon insertion into the intramedullary space the nail is fastened.
Field Measurement of Running Impacts Team: Chelsea Wanta, Amanda Feest, Matt Kudek, Nicole Daehn, Lindsey Carlson BME 201 March 9, 2007 Client: Dr. Bryan.
The Lumberjacks Team /16/12 Brian Martinez.
Problem Statement Project Proposal Design a device that will reduce the time of a medial malleolus fracture repair surgery Design a device that simplifies.
Improving Performance of a Heavy Duty Engine Cooling Drive Through Reduction of Drag Losses Design Recommendations & Future Analysis CFD Analysis It is.
Sponsors: National Aeronautics and Space Administration (NASA) NASA Goddard Space Flight Center (GSFC) NASA Goddard Institute for Space Studies (GISS)
Unit-5. Torsion in Shafts and Buckling of Axially Loaded Columns Lecture Number-3 Mr. M.A.Mohite Mechanical Engineering S.I.T., Lonavala.
Team 6: Stephen Heussler and Nolan Skop Freely Adjustable and Accessible Keyboard and Arrow Pad for Client with Cerebral Palsy Sponsored by the National.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Armadillo.
Problem Statement & Conceptual Designs September 6, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
ME 440 Aerospace Engineering Fundamentals Hot Topic of the Week.
Advanced Weight & Balance
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 G4 Design.
Patrick Dempsey Bridget Fitzpatrick Heather Garber Keith Hout Jong Soo Mok Structures Preliminary Design Review #1 October 12, 2000.
Engineering Design Process Selecting an idea – design and build Steps 3 and 4.
Lockheed Martin Additive Manufacturing Introduction to Engineering Design EDGSN 100 Section Girls 1 Guy / Team 8 Rebekah Moshier,
D. V. RAMANAREDDY VARDHAMAN COLLEGE OF ENGINEERING
Unit D Structures and Forces
Assumptions Limitations
Lockheed Martin Additive Manufacturing
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
Application of Forces Learning Objectives:
Lockheed Martin Additive Manufacturing
DEVICE FOR THE IMPLANTATION OF NEURAL ELECTRODE ARRAYS
Lockheed Martin Additive Manufacturing
How Do Helicopters Fly? An Introduction to Rotor Aeromechanics
How to Handle the Stress part 1
Training Presentation
Material Properties and Forces
Bonneville Power Administration Aerial Line Cart Progress Report
Sae – aero micro capstone
Replacement of Vehicle Bridge over Spring Creek
Replacement of Vehicle Bridge over Spring Creek
Teams What is a team? Maintaining Focus
Lockheed Martin Additive Manufacturing
Designing and Manufacturing of a hand operated plastic injection moulding machine envisioned for the mesoscale range. Freddy Travieso
Replacement of Vehicle Bridge over Spring Creek
Presentation transcript:

Lockheed Martin Additive Manufacturing Introduction to Engineering Design EDGSN 100 Section 002 Family First Designs/ Team 5 (Carolyn Baker, & (Shelby Quick, & (Ricardo Branco, & (John Guglielmi, & Presented to: Prof. Berezniak Date: 04/29/2016

Purpose 2 ●The goal looked to be achieved is to utilize additive manufacturing to improve the current UAV elevator design and connection. ●Possible improvements include a decrease in weight, an increase in function, a decrease in cost, or the like.

Background ●UAV parts are disassembled during the impact to relieve some stress in the UAV’s parts. ●However, most of the members and the connections will still suffer a moderate amount of stress. ●In our project, we will focus solely on the elevator part and its connection with the back of the UAV. Our objective will include building a complementary part that will fit between the elevator and the tail of the plane that will primarily serve as a stress reliever. 3

Sponsor ●Lockheed Martin is a global security and aerospace company that is principally engaged in advanced technology systems. ●Lockheed Martin is a large defense supplier to the United States government, making the majority of their products and services military-oriented. ●Because their products are being utilized in harsh environments, the company is working towards expanding their range of manufacturing--incorporating additive manufacturing--to make parts available and ready more easily. 4

Project Description ●The UAV project peaked our team’s interests and allowed for the greatest flexibility while still giving a set of guided directions. ●Project: develop an internal member to transfer and distribute the shock loads from the tail to the elevator. –Designing a structure that can survive multiple landings and that will see bending moments acting on the lever and fastener holes –Building structures that are not limited to lab or factory production –Lightening the structure’s weight to improve the UAVs’ maximum flight time and payload –Fitting the structure within the provided volume. 5

Procedures (1 of 2) ●The UAV sees bending moments where the tail connects to the rear elevator through its lever arm and fastener holes during landing. –Team decision: eliminate these bending moments completely. ●This was accomplished by a system that ejects the tail during the landing impacts. Within the connections of the tail and elevator, an additively manufactured spring and housing device now sits: –One end of the spring is attached to the housing and the other end is attached to a magnet which keeps the spring in compression. –The magnet would be attached to the tail of the UAV while the housing would be attached to the elevator. –The spring is to be made so that its spring constant, under compression, can eject the elevator from the tail of the UAV. –The magnet is chosen so that it is greater than the force of the spring that it is holding in compression plus the maximum drag that could be applied to it during flight, but less than the impulse applied to it during a landing. This would ensure that the tail does not prematurely eject during flight. 6

Procedures (2 of 2) ●During landing, the bending moments acting on the lever arm and fastener holes would shear the magnet from the housing, weakening the magnetic force holding the spring in compression. The spring force by the spring pushing against the elevator would now be stronger than the force of the sheared magnet holding it in compression and thus the tail would be ejected. The rear elevator, now freed from the tail of the UAV, sees no bending moments applied to its lever arm and fastener holes. ●The tail and elevator are still connected by the uncompressed spring so it is not lost during the landing event. F landing > F magnet > F drag + F spring 7

Results and Discussion I. Conceptual Design The design team began the first phase of the design process by analyzing the possible forces and stresses that the UAV may undergo during landing. It was determined that most UAV parts would suffer less damage if they came disassembled upon impact. The team decided to create a spring and magnet based shock absorber. II. Analysis The prototype is meant to fit into the elevator of the UAV as a small, lightweight component that can survive multiple landings. A spring fits inside the component and ejects the elevator upon impact. In doing so, the shock absorber not only endures much of the shock of landing but also removes all shock from the elevator. III. Summary A prototype of the shock absorber component was created using the Penn State MakerBot Innovation Center. The team chose to create a spring and brace system as an internal shock absorber because the structure, being a lightweight internal component, would not affect the flight of the UAV but would eliminate any stress upon landing. 8

Conclusions and Recommendations Ultimately the analyses done of the potential UAV part illustrate the innovative use of materials and additive manufacturing to maximize the UAVs’ control in landing. The magnet and spring release system both improve the transfer and distribution of shock to the elevator, as well as provide a part that can be produced in any environment--not limited to labs or factories. 9

Closing 10