Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Lutz Lilje DESY Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October.

Slides:



Advertisements
Similar presentations
Motors/actuators SSR1 (325MHz) slow/coarse tuners Piezoelectric actuators for SSR1 (325MHz) fine/fast tuner Presented by Yuriy Pischalnikov 02/06/2012.
Advertisements

Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Cost comparison of tuners H. Hayano, KEK AWLC14
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Review of LLRF system based on ATCA standard, Dec 3-4, 2007 Piezodriver and piezo control.
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
Cavity Integration summary H. Hayano April 25, 2008 ILC-SCRF
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
, DESY, Hamburg ECFA Workshop, SCRF Session, Lutz Lilje, DESY Lutz Lilje DESY European Linear Collider Workshop ECFA LC2013 Fabrication and Quality.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Reinhard Brinkmann, DESY Status of the European XFEL Accelerator Construction Project.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
Qualification Tests for the ILC Blade-Tuner Carlo Pagani University of Milano & INFN Milano - LASA Material prepared by: Rocco Paparella & Angelo Bosotti.
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
S. Prat SCRF meeting Fermilab April 21-25, 2008 Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ SCRF Meeting Fermi.
Shuichi Noguchi,SRF2007,10.71 New Tuners for ILC Cavity Application Shuichi Noguchi KEK.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Lutz Lilje, DESY, TILC08 Tests with the Fast Frequency Tuners in the Saclay-I design Lutz.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Blade Tuner L. Lilje for the INFN colleagues. Disclaimer The slides were prepared by R. Paparella and N. Panzeri for Carlo Pagani who could not attend.
1.3GHz Input Coupler for ILC
ILC FAST TUNER R&D PROGRAM at FNAL Status Report CC2 Piezo Test Preliminary Results Ruben Carcagno (on behalf of the FNAL FAST TUNER Working Group) 4/5/06.
Carlo Pagani University of Milano & INFN Milano - LASA WP8 Tuner Status & Perspective ILC-HiGrade Kick-Off Meeting DESY, Hamburg 29 August 2008 Material.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Cold Tuner test overview S1-Global at KEK 5-9 July 2010.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
LCLS II Tuner Mechanics; Accessibility/Replacement E. Borissov, Yu.Pischalnikov SRF cavity Tuner Workshop, FNAL, Oct. 13.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov (FNAL) S1-Global tuners.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov for FNAL Tuner team.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
LCLS-II Button-type BPM (Review) Nikolay Solyak Review, FNAL, Dec. 12, 2014.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
VISIT to DESY and SACLAY Tuners for SRF cavities XFEL cavities testing workflow Yu.Pischalnikov 05/07/2012.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Piezo Tuning System (PTS)
S1G Experiment Schedule Plan
TDR guideline discussion on Cavity Integration
Power Couplers, HOM Couplers and Tuners for the XFEL
R. Paparella, INFN-Milan, LASA Laboratory, Segrate, Italy
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
LCLS II SRF Cavity Tuner (developed by FNAL)
Mechanical setups Lorentz Force Detuning System Setup
European-XFEL tuners Review of quality control strategy
Nick Walker (DESY) EU GDE Meeting Oxford
Presentation transcript:

Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Lutz Lilje DESY Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Fabrication and Quality Control of the Frequency Tuner for the XFEL

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Outline of the talk Steps towards industrialisation  Mechanics  Motor drive  Piezo system Current status Disclaimer:  No details on Piezo amplifier or motor driver electronic given here  Developments well on-track by LLRF WP and DESY groups MSK and MCS

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Tuner Scheme Current design in use at FLASH  Original design by CEA  Fast piezo detuning introduced by DESY Design by M. Maurier and P. Leconte based of the MACSE tuner design (CEA Saclay)  L scre w  L arms  L cavit y

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY 4 Tuner Parts: Overview Mechanics Drive Unit Piezo System

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Challenges for industrialisation: Mechanics Mechanics supplied by CEA  Adapted to local supplier in France Cost reduction Material quality  Steel with low permeability needed Therefore  Prototypes with companies experienced in mass production of precision machined pieces (for Airbus etc.) Conclusions  Several simplifications on the detailed drawings  Relaxed tolerances to reduce cost for precision machine time  Good basis for a successful call for tender

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Industrial fabrication of mechanics Contract awarded to Astro- und Feinwerktechnik, Berlin  Minor adaption of drawings  After initial problems with material smooth production Quality control  Agreement on ‚essential‘ measures  Pre-series completely cross-checked at DESY  Piezo fixture incoming check at Piezo company  QC protocols delivered into DESY EDMS system by company Delivery  Pre-assembled state  Allows for additional cross-check of completeness

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Challenges for industrialisation: Motor and gear box Basic idea from CEA: Step motor and harmonic drive  Initial tests failed due to insufficient coating  Lubrication under cold vacuum conditions tricky  DESY in-house development on coatings  Parts purchased via different sources  Integration/Assembly at DESY  Second motor supplier came into play later than expected  Cold testing possible at vendor Therefore:  Training for at least two companies to deliver complete and tested drive units:  Motor, gear box, thread with nut  Test temperature liquid nitrogen, units under load  Use prototyping phase Conclusion  Both vendors were capable to fulfill XFEL requirements  E.g. Life-Time

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Industrial fabrication of drive unit Contract awarded to Harmonic Drive, Limburg  Minor adaption of drawings Quality control  Agreement on few ‚essential‘ mechanical measures  Room temperature and at liquid N2 temperature tests  Record current when  Beginning of movement  Loss of steps  Total number of steps  QC protocols delivered into DESY EDMS system by company Delivery  Delivered in a sealed bag including disseccant and humidity indicator

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Challenges for indutrialisation: Piezo system DESY development with several iterations  Guaranteeing sufficient pre-load for piezos  Avoid loose piezos under all operation conditions  Change of pre-tuning of cavities Assembly ‘hand-crafted’ at DESY No burn-in tests  One special case of failure at initial operation suspected  Not fully conclusive data Therefore:  Require companies to  Further improve radiation resistance (ETFE cabling)  Respect vacuum compatibility  assemble piezo systems  More than buying piezos only  Use experience of piezo companies for assembly  perform burn–in test  Room-temperature considered sufficient  Implementation in series production

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Industrial fabrication of Piezo System Contract awarded to PI, Karlsruhe  PI Ceramics for Piezo elements Design improved of drawings  Avoid local stresses on piezos by optimising the plates used for pressing the piezo elements  Increases thickness  Definition of surface quality  Better fixation of the wiring

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Industrial fabrication of Piezo System Quality control  Burn-in test after assembly  DC test  100 % of nominal voltage for 2 hours  AC test  Voltage:100% of nominal piezo voltage  Pulse length:Sinusoidal Half Wave of 1000 Hz  Rep rate:100 Hz  Number of Cycles:1 Million  After the tests the following parameters should be measured  Capacitance  Stroke  Leakage current at nominal voltage  QC protocols delivered into DESY EDMS system by company

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Status of the System Components Mechanics:  Series fabrication finished. Delivery completed  721 normal mirrored units  Minor problems with tolerances Drive unit:  Documentation reports decided.  More than than half of all units have FAT and been delivered to CEA and DESY.  588 normal and 84 mirrored Piezo system:  Continuing tests of permanent FLASH setup.  Series production of fixtures completed.  824 units  3 Piezos (of 1600) failed the FAT and were replaced by the company QC testing during module installation at Saclay (INFN contribution). Documentation in EDMS continues.

XFEL WP 07 Cavity Frequency Tuner Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY If I had had time, … … what would be different? Piezo  Design improved for mechanical robustness  Kept overhead in voltage  Position of the piezo?  T-sensor? Mechanics  Nothing in the design  Assembly procedures and training of personnel Drive unit  More lifetime testing  T-sensor?

Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Several people contributed with support and measurments to the work presented here: R. Paparella, A. Bosotti, C. Albrecht, K. Jensch, O. Keller, K Przygoda, M. Grecki, C. Müller and many more also within the S1 Global Test at KEK Thanks!