LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 1 Cost and Schedule Overview Marc Kaducak LARP Review June 10, 2013.

Slides:



Advertisements
Similar presentations
1 Project Design Module 5 Session 5. 2 Summary This session provides introduction to project preparation, project documents, and checklist for questions.
Advertisements

1 Click to edit Master text styles Second level Third level Fourth level Fifth level Administrative Support for Large- Scale Funding Applications – Session.
Mu2e WGM 6/15/2011 R. Ray Mu2e Project manager. Reviews We were on Lehman’s schedule for early August. We gave up that slot 2 weeks ago when it became.
5-6 May 2009 AWG Meeting LAX1 Technology Development Project US contributions to global.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
David McGiven FAC: Construction Management Procurement October 2006 Facility Advisory Committee (FAC) Construction Management.
Project Management and Scheduling
February  Intro  Budgeting Timeline  Update on NSTAR upgrade  Budgeting Changes and Guidelines  HR position budgeting  Finance budgeting 
© 2012 PMO Coach Executive Status Report Project Name Date.
U.S. ATLAS Physics and Computing Budget and Schedule Review John Huth Harvard University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Utilities Planning Group CIP Tracking System Jim Broome, PE Chief Engineer.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
Copyright 2010, The World Bank Group. All Rights Reserved. Budgeting Statistical Projects Section A 1.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Yazd University, Electrical and Computer Engineering Department Course Title: Advanced Software Engineering By: Mohammad Ali Zare Chahooki The Project.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
Bob Travica MIS 2000 Class 12 Group Processes and Group Support Systems Updated Feb
Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate.
TOF Project Construction Project Plan
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
Lab Coordination Meeting 9/25/13Introduction – G. Sabbi 1 Magnet Development Plan Update Overview GianLuca Sabbi LARP Lab Coordination Meeting September.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
Anthony Indelicato DOE-Princeton Site Office May 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the NSTX.
Bob Travica MIS 2000 Class 9 Group Processes and Group Support Systems Updated: 7 October 2012.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
Change Management CAMP JUNE 11, Change Management – why?  Why is it necessary?  Why is it important?  Proactive  Cost effective  Transparent.
AGS RSVP Weekly Meeting P. Pile 24 Mar 2005 AGS RSVP Weekly Meeting 24 Mar 2005 Useful Links: RSVP Project : C-AD.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Reducing Emissions from Deforestation and Forest Degradation Forest Carbon Partnership Facility Participants Committee Meeting Panama, March 11-13, 2009.
Budget Outlook Glen Crawford P5 Meeting Sep
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky.
 Presented ongoing activities in LARP  Magnet Systems  Accelerator Systems  Program Management  Also presented plan for “spinning off” construction.
Finance Roy Preece STFC RAL Oversight Committee Meeting 27 th November 2015.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
University of Southern California Center for Systems and Software Engineering RDCR ARB CS 577b Software Engineering II Supannika Koolmanojwong.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
PIP-II Resource Loaded Schedule (RLS) ---- Step Luisella Lari 13 May, 2016.
Sullivan – Fundamentals of Statistics – 2 nd Edition – Chapter 9 Section 4 – Slide 1 of 11 Chapter 9 Section 4 Putting It All Together: Which Procedure.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
Large Synoptic Survey Telescope
Chapter Five Project Planning.
SCT Project Management Issues
Overview of Project Planning
PROJECT CHANGE REQUEST
Preparations for a Lehman Review
CIS 210 Systems Analysis and Development
TENTATIVE BUDGET SUMMARY
Recommendations for using this ‘framework’ template
ARB Schedule Locations
Mark McKinnon EVLA Project Manager
FY19 Budget Summit (Division Name) (Presenter’s Name)
FY19 Budget Summit (Division Name) (Presenter’s Name)
APAN General Assembly APAN Secretariat Report
Conventional Facilities
School Council Sub-Committee
Presentation transcript:

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 1 Cost and Schedule Overview Marc Kaducak LARP Review June 10, 2013

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 2 Outline Cost Estimate Methodology Project Management Effort Cost Overview NOTE: These slides do not include information about potential CERN or GAD contributions. Details included in parallel sessions. Only activities directly funded by LARP are represented. APOLOGY: These slides are not aesthetically pleasing. Shorter projects would require fewer columns and therefore look better.

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 3 Cost Estimate Methodology Initial cost estimates developed for Dec.2012 deliverable down- selection process. Guidelines issued for estimating each deliverable with respect to project accounting (overheads, escalation, contingency). Formats were time phased estimates on spreadsheets. These are ok for now, but do not lend themselves to updates based on status. Attempted to reconcile with near term budget realities, but there are still challenges.

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 4 Project Management Staff Functions Typical project management roles for $200M project in “DOE 413 style” context: Covered in existing LARP budget

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 5 Overall Costs and Existing LARP Budget **No Contingency in these columns, see following slides

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 6 Overall Costs and Existing LARP Budget con’t *Contingency distributed uniformly by % in these columns

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 7 Totals (with Distributed Contingency)

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 8 Funding

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 9 Summary Substantial work put into estimates for a project at this stage. Management model and staffing plan under development. Unknown parameter is level of rigor required for a “proceed as- if in CD process” scenario. Prototyping development and long lead procurements will require funding in advance of the assumed FY17 CD-3 in addition to the existing flat-flat LARP levels. Thank you

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 10 Backup

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 11 Prototype Cost Profile (with Distributed Contingency)

LARP Review, June 10, 2013Cost and Schedule Overview – M. Kaducak 12 Construction Cost Profile (with Distributed Contingency)