LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
11 T Dipole for DS Status of CERN Activities M. Karppinen CERN TE-MSC On behalf of B. Auchmann, L. Bottura, B. Holzer, L. Oberli, L. Rossi, D. Smekens,
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Raúl Morón Ballester TE-MSC-LMF
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
Superconducting Large Bore Sextupole for ILC
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
11-T Dipole Collaboration Review Cold Mass Fabrication and Tooling Procurement F. Savary, with contributions from B. Auchmann, E. Grospelier, S. Izquierdo.
Support structure working group video- meeting P. Ferracin, D. Cheng, H. Felice, M. Juchno, J.C. Perez July 15th, 2014.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
LHQ Coil 02 Winding and Curing Miao Yu 07/11/2013.
1 Short Model Coils George Ellwood, Simon Canfer Jan 08.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014.
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez
Review of Modular Coil Winding Pack Configuration David Williamson March 19, 2004.
Long coil manufacturing plan and QC at CERN F. Lackner, P. Ferracin, H. Prin, M. Duret, F. Savary, L. Favier, S. Triquet, S. Luzieux, R. Principe, C. Scheuerlein,
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Click here to add footer 1 Ludovic Grand-Clément & Hervé Prin 08/12/2014.
P. Ferracin on behalf of the MQXF collaboration
Superconductng cable for CBM magnet
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Cold mass design, assembly plans and QA/QC at CERN
Coil Design and Fabrication
Winding tests on Roebel cables
11 T Dipole Integration & Plans M. Karppinen
Overview – Nb3Sn Furnace
J.C. Perez on behalf of SMC collaboration team J.C. Perez
Reaction fixture: What is working and not working
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
Mechanical stability and QXF coil winding
P. Ferracin and G. Ambrosio
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
QXF schedule and milestones
Practice Geometry Practice
MQXF quench heaters: tests and investigation (CERN)¶
Coil Fabrication Status
Presentation transcript:

E. Cavanna, M. Duret, P. Ferracin, T. Genestier, L. Grand-Clement, F. Lackner, S. Luzieux, F. Savary, S. Triquet, J.C. Perez, M. Pozzobon, H. Prin, P. Revilak, P. Voisin 07. April 2016

Outline 2 Coil NameDescriptionStatus MQXFB MQXFB Cu practice ins. Preparation curing inner layer Cable received 1.Status coil production

MQXFB: Coil 0.01 Winding – inner layer damage,.eg 3 - Insulation damage due to out of sync motion of cable spool and guiding rolls - Software already corrected by supplier of control system - Fix of damage with wrap of wedge insulation fibre - Acceptance of geometry anomaly in favour of proper electrical testing - No issues for tool closing expected - Next steps: curing of inner layer – lead item handling equipment for coil and mandrel

MQXFB: Coil 0.01 Winding – inner layer damage,.eg 4