Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Selection Analysis Method Course Outline 9.

Slides:



Advertisements
Similar presentations
Capital Budgeting Decisions
Advertisements

Incremental Analysis Lecture No. 21 Professor C. S. Park
Contemporary Engineering Economics, 4 th edition, © 2007 Incremental Analysis Lecture No. 28 Chapter 7 Contemporary Engineering Economics Copyright © 2006.
Evaluating Business and Engineering Assets Payback Period.
© Prentice Hall, Chapter 8 Evaluating Investment Projects Shapiro and Balbirer: Modern Corporate Finance: A Multidisciplinary Approach to Value.
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
(c) 2001 Contemporary Engineering Economics 1 Chapter 16 Capital Budgeting Decisions Methods of Financing Cost of Capital Choice of Minimum Attractive.
COMPARING ALTERNATIVES
Chapter 7 - Rate of Return Analysis Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
EE535: Renewable Energy: Systems, Technology & Economics
Capital Budgeting Evaluation Technique Pertemuan 7-10 Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
FIN 40153: Advanced Corporate Finance EVALUATING AN INVESTMENT OPPORTUNITY (BASED ON RWJ CHAPTER 5)
Flash back before we compare mutually exclusive alternatives.
COMPARING ALTERNATIVES
Contemporary Engineering Economics, 4 th edition, © 2007 Choice of MARR Lecture No. 62 Chapter 15 Contemporary Engineering Economics Copyright © 2006.
Pemilihan Investasi Terbaik Pertemuan 19 dan 20 Matakuliah: D 0094 Ekonomi Teknik Tahun: 2007.
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
CHAPTER 1 INTRODUCTION TO ENGINEERING ECONOMY WHAT IS ECONOMICS ? The study of: –How to allocate resources effficiently to satisfy unlimited human wants.
ALI SALMAN1 LECTURE - 11 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Intro to Engineering Economy
INTRODUCTION TO ENGINEERING ECONOMY
1 Internal Rate of Return Internal Rate of Return (IRR): The interest rate i* at which NPW = 0 Note: This is the same as finding the roots of a polynomial.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 RATE OF RETURN ANALYSIS Course Outline 7.
Comparing Projects Using Time Value of Money
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Choice of MARR and Capital Budgeting.
Copyright ©2012 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fifteenth Edition By William.
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8.
Present Worth Analysis Chapter 5 Types of Economic Alternatives Mutually Exclusive Alternatives: –Only one of the viable projects can be selected. –The.
ALI SALMAN0 LECTURE - 02 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
SE 361 Lecture-03. Science is defined as: a department of systematized knowledge as an object of study; knowledge or a system of knowledge covering.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
Capital Budgeting: Decision Criteria
12/17/2015rd1 Engineering Economic Analysis Chapter 15  Selection of a MARR.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Capital Budgeting Chapter 11.
0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition 6 Chapter Six Some Alternative Investment Rules.
Lecture No.18 Chapter 5 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition, © 2010.
Other Criteria for Capital Budgeting Text: Chapter 6.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Comparing Economic Alternatives Using time value of money to choose between two or more options.
8-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 8 Rate of Return Multiple Alternatives © 2012 by.
L16: Comparing Mutually Exclusive Alternatives ECON 320 Engineering Economics Mahmut Ali GOKCE Industrial Systems Engineering Computer.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
1 Incremental Analysis A technique or approach that can be used with NPW, EAW, and later with IRR and Cost/Benefit to determine if an incremental expenditure.
Chapter 6: Comparison and Selection Among Alternatives
IE 342- Engineering Economic Analysis
Capital Budgeting and Cost Analysis
Capital Budgeting and Cost Analysis
Net Present Value Decision Rules IRR (Internal Rate of Return)
Chapter 6: Comparison and Selection Among Alternatives
Comparing Mutually Exclusive Alternatives
Chapter 6: Comparison and Selection Among Alternatives
INTRODUCTION TO ENGINEERING ECONOMY
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 6: Comparison and Selection Among Alternatives
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 7 Present Worth Analysis
IE 342- Engineering Economic Analysis
Costing and Finance P R Upadhyay.
IE 342- Engineering Economic Analysis
Chapter 1: Introduction to Engineering Economy
Chapter 6: Comparison and Selection Among Alternatives
Capital Budgeting Techniques
Chapter 6: Comparison and Selection Among Alternatives
IE 342- Engineering Economic Analysis
OUTLINE Questions? News? New homework due Wednesday
OUTLINE Questions? News? New homework due Wednesday
Presentation transcript:

Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Selection Analysis Method Course Outline 9

Outline Mutually Exclusive Basic Concepts Method for Comparing Mutually Exclusive Alternatives Alternatives Selection Choice of MARR 2

Mutually Exclusive Engineering projects can be accomplished by more than one feasible design alternative Selection one of these alternatives excludes the choice of any of the others, the alternatives are called mutually exclusive. Sometimes alternatives may have different useful lives. 3

Basic Concepts For Comparing Develop the alternatives –The choice (decision) is among alternatives. The Alternatives need to be identified and then defined for subsequent analysis Focus on Differences –Only the differences in expected future outcomes among the alternatives are relevant to their comparison and should be considered in the decision Use a Consistent Viewpoint –The prospective outcomes of the alternatives, economic and other, should be consistently developed from a defined viewpoint Use a Common Unit of Measure –Using a common unit of measurement to enumerate as many of the prospective outcomes as possible will simplify the analysis of the alternatives 4

Basic Concepts For Comparing Consider All Relevant Criteria –Selection of a preferred alternative (decision making) requires the use of a criterion (or several criteria). The decision process should consider both the outcomes enumerated in the monetary unit and those expressed in some other unit of measurement or made explicit in a descriptive manner Make Risk and Uncertainty Explicit –Risk and uncertainty are inherent in estimating the future outcomes of the alternatives and should be recognized in their analysis and comparison Revisit Your Decision –Improved decision making result from an adaptive process; to the extent practicable, the initial projected outcomes of the selected alternative should be subsequently compared with actual result achieved. 5

Choosing Analysis Method We have now seen three major economic analysis techniques: 1.present worth analysis (PW analysis), 2.annual cash flow analysis (ACF analysis), 3.rate of return analysis (ROR analysis). Which method should be used for any particular problem? The following points are important: You must know the MARR to use PW analysis or ACF analysis. PW analysis and ACF are often simpler than ROR analysis. In some contexts, ROR is easiest to explain. In others, ACF analysis is easier to explain The company you work for may dictate the analysis method you must use. ROR analysis is most often used in industry. 6

7 Comparing Mutually Exclusive Alternatives Evaluation Period Type of AlternativesRecommended Method Series to evaluate Equal lives of alternativesRevenue or service Public Sector AW or PW B/C based on AW or PW Cash Flow Incremental Cash Flow Unequal lives of alternativesRevenue or service Public Sector AW B/C based on AW Cash Flow Incremental Cash Flow Study periodRevenue or service Public Sector AW or PW B/C based on AW or PW Updated Cash Flow Updated Incremental Cash Flow Long to infiniteRevenue or service Public Sector AW or PW B/C based on AW Cash Flow Incremental Cash Flow After choosing method, define interest rate best on evaluate method, show on next table

Evaluation Method for Selecting Alternatives 8 Evaluation Method Equivalence Relation Lives of Alternatives Time Periods for Analysis Series to Evaluate Rate of Return; Interest Rate Decision Guideline: Select* Present WorthPWEqualLivesCash flowMARR Numerically largest PW PWUnequalLCMCash flowMARR Numerically largest PW PWStudy period Updated cash flow MARR Numerically largest PW CCLong to infiniteInfinityCash flowMARR Numerically largest CC Future WorthFWSame as present worth for equal lives, unequal lives, and study period Numerically largest FW Annual WorthAWEqual Or unequal LivesCash flowMARR Numerically largest AW AWStudy period Updated cash flow MARR Numerically largest AW AWLong to infiniteInfinityCash flowMARR Numerically largest AW * Lowest equivalent cost or largest equivalent income

9 Evaluation Method Equivalence Relation Lives of Alternatives Time Periods for Analysis Series to Evaluate Rate of Return; Interest Rate Decision Guideline: Select* Rate of ReturnPW or AWEqualLives Incremental cash flow Find i*Last i*> MARR PW or AWUnequalLCM of pair Incremental cash flow Find i*Last i*> MARR AWUnequalLives Cash flow Find i*Last i*> MARR PW or AWStudy period Updated Incremental cash flow Find i*Last i*> MARR Benefit / CostPWEqual or Unequal LCM of pair Incremental cash flow Discount rate Last C > 1.0 AWEqual or Unequal Lives Incremental cash flow Discount rate Last C > 1.0 AW or PWLong to infiniteInfinity Incremental cash flow Discount rate Last C > 1.0 Evaluation Method for Selecting Alternatives * Lowest equivalent cost or largest equivalent income

Choice of MARR Or you can choose MARR based on: Choice of MARR when Project Financing is Known Choice of MARR when Project Financing is Unknown Choice of MARR under Capital Rationing 10

Choice of MARR when Project Financing is Known 11 When you find the Net present worth of the project, use cost of equity (i e ) as the discount rate. Explicit accounts For debt flows

Bina Nusantara Choice of MARR as a Function of Budget ProjectAOAO Cash Flow A1IRR 1-$10,000$12,00020% 2-10,00011, ,00011, ,00010, ,00010, ,00010,4004 Borrowing rate (k) = 10% Lending rate (r) = 6%

Bina Nusantara An Investment Opportunity Schedule $20,000$40,000$60,000 20%15%10%8%7% 4% Project 1 Project 2 Project 3 Project 4 Project 5 Project 6 Required capital budget Rate of return (%)

Bina Nusantara A Choice of MARR under Capital Rationing $20,000$40,000$60,000 20%15%10%8% 7% 4% Project 1 Project 2 Project 3 Project 4 Project 5Project 6 Required capital budget Rate of return (%) k = 10% r = 6% MARR Borrowing rate (k) = 10% Lending rate (r) = 6%

Bina Nusantara Capital Budgeting Evaluation of Multiple Investment Alternatives –Independent projects –Dependent projects Capital Budgeting Decisions with Limited Budgets

Bina Nusantara Independent Projects AlternativeDescriptionXaXa XbXb 1Reject A, Reject B00 2Accept A, Reject B10 3Reject A, Accept B01 4Accept A, Accept B11

Bina Nusantara Mutually Exclusive Projects Alternative(X A1, X A2 )(X B1,X B2 ) 1(0,0) 2(1,0)(0,0) 3(0,1)(0,0) 4 (1,0) 5(0,0)(0,1) 6(1,0) 7(0,1)(1,0) 8 (0,1) 9

Bina Nusantara Contingent Projects AlternativeXAXA XBXB XCXC

Bina Nusantara Four Energy Saving Projects under Budget Constraints (Budget Limit = $250,000) ProjectInvestmentAnnual O&M Cost Annual Savings (Energy) Annual Savings (Dollars) IRR 1$46,800$1,200151,000 kWh$11, % 2104,8501,050513,077 kWh40, % 3135,4801,3506,700,000 CF32, % 494, ,962 kWh30, %

Bina Nusantara Marginal Cost of Capital Schedule (MCC) and Investment Opportunity Schedule (OSC)

Bina Nusantara Optimal Capital Budget