TPTF Update Trip Doggett TAC March 9, 2006. TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.

Slides:



Advertisements
Similar presentations
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
Advertisements

June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
Retail Market Subcommittee Update to TAC Kathy Scott April 24,
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Load Distribution Factor Calculation Update for Market Applications and studies a Presentation for NATF 11/2/ NATF1Texas Nodal.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 6, 2008 Trip Doggett.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Credit Work Group Update April 4, General  Credit Work Group met on Friday, March 7  Received Ethics Training from ERCOT Legal staff  Reviewed.
Lead from the front Texas Nodal 1 TPTF Update for TAC April 4, 2008 Trip Doggett.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 5, 2007 Trip Doggett.
March 19, 2008 WMS WMS Procedures Review Nieves López ERCOT Market Rules.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
CMWG Update to WMS Report of CMWG Meeting of M Wagner Edison Mission Marketing & Trading.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
ERCOT Nodal Readiness Plan Trip Doggett TAC Special Meeting September 7, 2005.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 1, 2007 Trip Doggett.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Enterprise Data Warehouse Section 8 – Performance Monitoring.
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
February 12, 2009 ROS ERCOT and TSP activities for Planning Model Go-Live.
2009 Project Prioritization Troy Anderson ERCOT Program Management Office February 20, 2008.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
ERCOT Comments TNT Transition Plan Ray Giuliani TAC Meeting October 6, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 6, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Lead from the front Texas Nodal 1 TPTF Update for TAC January 4, 2007 Trip Doggett.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
Lead from the front Texas Nodal 1 TPTF Update Trip Doggett.
Nodal Readiness Plan Update Ron Hinsley Update for TAC November 3, 2005.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Lead from the front Texas Nodal 1 TPTF Update for TAC February 7, 2008 Trip Doggett.
Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006.
Transition Plan Network Operations Model Change Requests 5/26/2010.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 TPTF Update for TAC August 2, 2007 Trip Doggett.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
Kenan Ögelman & Randa Stephenson TAC Leadership Retreat TAC Meeting September 5, 2013.
1 CenterPoint Energy presentation to TAC regarding the NMMS April 7, 2006.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
Texas Nodal Market Implementation Transition Planning Task Force Metric Framework Review Readiness Advisor January 24, 2006.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Approval of Important Station Voltages for State Estimator Reporting Review of SE and Telemetry Standards Alex Sills Advanced Network Applications 10/13/11.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
ERCOT Update on UFLS Annual Survey with TSP/DSP Gene Lowrie Reliability & Compliance Eng Sr. July 2016.
Texas Nodal Market Go-Live Procedure
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
2011 Prioritization Update to Market Subcommittees
Load Distribution Factor Calculation for Market Applications and Studies a Presentation for NATF 9/21/ NATF 1 Texas Nodal.
Commercial Operations Sub-Committee Update to TAC
Presentation transcript:

TPTF Update Trip Doggett TAC March 9, 2006

TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification questions on Section 7 Training Update Reviewed Architecture Document Reviewed TAC Transition Issues Next meetings  Monday, March 6 and Tuesday, March 7  Tuesday, March 28 and Wednesday, March 29

ERCOT’s Clarification Questions Reviewed questions from Sections 1, 3, 4, 5, 6, 7, 10, and 22F with TPTF Questions from 2, 8, 9, 16, and 17 yet to be presented ERCOT preparing Nodal PRRs, by section, to address synchronization requirements and address clarifications Plan to present PRRs for Sections 1, 3, 4, 5, 6, and 7 beginning March 28

TPTF Update – NMMS Requirements First Business Requirements Document for TPTF approval is for the Network Model Management System Primary objectives are:  Ensure consistency between Network Operations Model, CRR Network Model, and Annual Planning Models  Meet timing requirements to modify the Network Operations Model close to the time actual operations occur in the network Process  2 Feb - Posted proposed timeline / framework for approval  6 Feb - Reviewed proposed timeline / framework for approval w/TPTF  11 Feb - Posted a draft of the document for review  17 Feb - Sent a note to TAC so other Subcommittee Chairs would be aware of the process  20 Feb - Overview of document / Q&A with TPTF  23 Feb - Comment deadline (Received 7 sets of comments from 6 companies)  1 Mar - ERCOT distributed revised document addressing comments  6 Mar - Goal - TPTF approve as being in compliance with applicable Protocols

TPTF Update – NMMS Requirements Received a number of comments around business processes impacted by the nodal requirement of consistency between the models. This may merit a workshop with TSPs to discuss the requirements in the Nodal Protocols. The Transition Plan says, “ Any declaration of the accomplishment of a major milestone (business requirements, conceptual design, and successful completion of Market Participant testing) or a decision to proceed is contingent on the approval of both ERCOT and TAC.” Should we bring each business requirement document to TAC for approval?

TAC Transition issues ERCOT must work with the appropriate TAC Subcommittee to develop procedures for characterizing a Simple Transmission Outage Each Transmission Element must have a unique identifier using a consistent naming convention used between ERCOT and TSPs. ERCOT shall develop the naming convention with the assistance of the TSP and the approval of TAC The appropriate TAC subcommittee shall establish a task force that is open to Market Participants, comprised of technical experts to develop a set of Telemetry Criteria consistent with the minimum requirements of the Protocols The appropriate TAC subcommittee shall establish a task force that is open to Market Participants, comprised of technical experts to develop a State Estimator Performance Standard consistent with the minimum requirements of the Protocols.

TAC Transition issues 3.19(2) An appropriate subcommittee approved by TAC (“TAC Subcommittee”) may develop an alternative list through the analysis described below for determining Competitive Constraints 3.19(3) The TAC Subcommittee shall perform the following analysis with the goal of developing an objective standard for determining Competitive Constraints: 5.61(4) The process for determining the verifiable actual costs must be developed by ERCOT, approved by the appropriate TAC subcommittee 5.6.3(3) The process for determining the verifiable actual costs for a startup attempt under paragraph (2) above must be developed by ERCOT, approved by the appropriate TAC subcommittee

TAC Transition issues (2) ERCOT shall develop a methodology, subject to TAC approval, to determine the optimal frequency bias for given system conditions (1) ERCOT shall develop a procedure approved by TAC to deploy Resources providing Non-Spinning Reserve Service (2)(b) ERCOT shall develop a procedure for determining which Load Resources to interrupt and to equitably allocate Load Resources to one of two deployment stacks to enable a 50% deployment, which procedure must be approved in advance by TAC The appropriate TAC subcommittee shall establish a task force that is open to Market Participants, comprised of technical experts, to develop a naming convention for CRRs consistent with the requirements of the Protocols 8.0 in some instances Section 8 requires ERCOT to develop other performance measures that must be approved by the Technical Advisory Committee (TAC)

Questions