Pump Storage Power Plant Pyhäsalmi Concept - Background and current status Ari Aalto LAGUNA – LBNO General Meeting Paris 16.9.2013.

Slides:



Advertisements
Similar presentations
TM/WSP 5-9 Nov Group B2- Management - Human resources development - Financing - Electric grid, industrial inv. and procurement QUESTIONS / DIFFICULTIES.
Advertisements

På väg mot en elförsörjning baserad på enbart förnybar el i Sverige En studie om behov av reglerkraft och överföringskapacitet Version 4.0 Lennart Söder.
1 AEP Perspectives on Development and Commercialization of CCS Technology for Natural Gas Power Generation Matt Usher, P.E. Director – New Technology Development.
New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
Market Situation in Hungary Market Situation in Hungary The Geothermal Heat Pumps market in Central & Eastern Europe BRATISLAVA Bela Adam Renewable.
Donors’ Conference on Sustainable Energy for Kosovo
1 MARKET OPPORTUNITIES AND BARRIERS Speaker: Vidas Čebatariūnas Commercial director UAB Energijos realizacijos centras.
A review of offshore wind power grid connection options in the Bothnian Bay Offshore grids for wind power integration Sisu Niskanen VTT Technical Research.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Pyhäsalmi (site review) W. H. Trzaska on behalf of the Finnish LAGUNA team.
Hamina Managing Director Timo Toikka Hamina Energy Ltd Mobile Operating engineer, wind power Heikki.
Renewable Energy in Oman Public Authority for Electricity and Water Khalil Alzidi Senior Renewable Energy Engineer.
Introduction to the EnergyPLAN model Henrik Lund Aalborg University Denmark Aalborg University, September October 2005 PhD-course: Energy System Analysis.
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
Wind Power in Ireland: Treatment of wind in the Single Electricity Market APEx Conference, Paris 16 th October 2007.
NextEnd. Preparation of Business Plan for Setting up Enterprise Business Plan.. The business plan is a written document prepared by the entrepreneur that.
©2014 Storelectric Ltd Making Renewable Energy Profitable and Traditional Energy Efficient Storelectric Ltd Compressed Air Energy Storage.
New Zealand & Australian Wholesale Electricity Markets A Comparative Review Dr Ralph Craven Transpower NZ Ltd.
Märt Ots Estonian Competition Authority Baltic Electricity Market Fora Vilnius Latest developments in Estonia.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Options for climate friendly technologies for power generation and their related costs and potential environmental impacts Sustainable Energy Development.
Naujos galimybės pastačius naujas elektros jungtis ir SGD terminalą New opportunities after construction of new interconectors and LNG terminal prof. Jurgis.
Demand Response – A New Option for Wind Integration ?
SDEWES, Dubrovnik, Croatia, 02. October 2009 Tariffs for energy storage -STORIES project workshop- Goran Krajačić, Neven Duić,
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
© Vattenfall AB Managing the Business of Hydropower Nils Andersson, Vattenfall Group Function Communication.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Solution for Future Electrical Supply in the Middle Europe Nuclear Power Ivo Kouklík
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
0 Rymantas Juozaitis Director General Lietuvos energija AB PAN BALTIC PPP CONFERENCE-SEMINAR Vilnius, November 2006 POWER SECTOR OF LITHUANIA and.
Impacts of wind power on energy balance of a hydro dominated power system EWEC 2006, Athens MSc Juha Kiviluoma, VTT PhD Hannele Holttinen, VTT.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Energy sector Special sector: –Depend on energy inputs (imported) –Strategic sector (linkages) –Non-competitive markets, high regulation Liberalization.
Gunnar Tryggvason Acting CEO. HKI objectives Background & owners HKI Targets
IEE/13/477/SI Legal disclaimer: The sole responsibility for the content of this publication lies with the authors. It does not necessarily reflect.
75MWp Solar PV Plant in El Salvador July One of the Largest Solar PV Project in Central America Key Figures » 60MWac / 75MWp » Attractive price.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
Hydro power 16.3 % Wind power 0.1 % Peat 6.9 % Other renewable 11.4 % Nuclear power 26.8 % Natural gas 10.3 % Coal 14.1 % Oil 1.9 % Net imports 12.2 %
Diagram from the publication
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
ACCESS TO THE GRID Vaida Tamašauskaitė Power System Planning Division Power System Development Department Lietuvos energija AB Ryga, 3 July, 2006.
HEAT PUMPS IN EUROPE Martin Forsén President EHPA Martin Forsén SULPU
Issues of Grid Integration of Renewables : Creative solutions 09/11/2012Mickaël HERVY01 / 11.
PORTFOLIO RISK ANALYSIS BASED GENERATION EXPANSION PLANNING Presenter: Nguyen Xuan Phuc Asian Institute of Technology School of Environment, Resources.
What’s happening in Spain? Access to the grid request of STE projects by Oct MW.
Geothermal Policy and Regulation Cases from Chile, Kenya, New Zealand and the Philippines November 2015.
Recent TSO report on changes because of larger amounts of renewable enery IEA Task 25, January 14, 2016 Edf – Clamart – Paris – France Lennart Söder Professor.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
Updated Energy Year 2011 Electricity Finnish Energy Industries
2015 Market Research Report on Global Water and Wastewater Treatment Chemicals Industry Published: Jan 2015 Single User License: US$ 2600 Corporate User.
TNC’s SUEZ. Suez aims SUEZ, an international industrial and services Group, designs sustainable and innovative solutions in the management of public utilities.
AREVA’s Reactor Projects: Building on Experience Kathy Williams, Chief Financial Officer AREVA Inc. July 29, 2014.
Wood chip drying in connection with combined heat and power or solar energy in Finland Samuli Rinne Henrik Holmberg Tiina Järvinen Kaisa Kontu Sanna Syri.
Laguna-LBNO-Pilot Implementation Model for an underground science infrastructure at Pyhäsalmi ECONOMIC REALIZATION PLAN FOR THE INFRASTRUCTURE DEVECON.
Latest developments in Estonia
Market opportunities and barriers
Uniper Energy Services
DISTRICT COOLING A promising and sustainable option for HFC phase-down
Finnish Climate and energy strategy and electricity markets
Applications of Optimization
Underwater Storage Technologies for Offshore Wind Energy
Wind Power in Bulgaria and the Region: Key Challenges
PROJECT REPORT PREPARATION
An operational analysis of Kadamparai Pumped Storage Hydro Plant located in Tamil Nadu Sanyasi Naidu.
Svetlana Rybina, Lauri Holopainen
ELEC-E Smart Grid Demand Response of EV Loads
Your partner with over 70 years of experience
Building a city on waste heat – a technological perspective
Presentation transcript:

Pump Storage Power Plant Pyhäsalmi Concept - Background and current status Ari Aalto LAGUNA – LBNO General Meeting Paris

Finland is a part of Nordic power system Increasing demand of regulation power due to increase of wind & solar power large nuclear and back pressure capacity Decreasing regulation availability from Nord-Pool increasing own needs in Sweden new and stronger connections to Middle Europe Market drivers in future Power balance in Finland Ari Aalto, LAGUNA-LBNO Paris

Source: Eurelectric 2011 Ari Aalto, LAGUNA-LBNO Paris

Source: GTK Hitura H = 630 m Jussarö / Tammisaari H = 246 m Kylkynlahti H = 800 m Kemi H = 500 m Pyhäsalmi H = 1400 m Possible mine locations for pumped storage Ari Aalto, LAGUNA-LBNO Paris

Pyhäsalmi Mine 1450 m Ari Aalto, LAGUNA-LBNO Paris

Together with four regional electricity companies Vantaan Energia Turku Energia Oulu Energia Oulun Seudun sähkö Pyhäsalmi Mine These electricity companies had 2012 revenues of 980 M€ and 100 M€ profit 10 TWh electricity distribution to customers PSPP Pyhäsalmi developers Ari Aalto, LAGUNA-LBNO Paris

Almost optimal location in terms of Finnish national grid Ari Aalto, LAGUNA-LBNO Paris

Pit excavated for backfilling of mine is used as upper storage reservoir Open mine pit not used as upper reservoir PSPP Pyhäsalmi water gallery vertical penstock down to 1400 m depth Pit excavated for backfilling of mine V > 3 Mm 3 Open mine pit PSPP Pyhäsalmi water gallery Pyhäjärvi (12`178.5 ha) Ari Aalto, LAGUNA-LBNO Paris

Hydraulic system Ari Aalto, LAGUNA-LBNO Paris

Underground storage Speicher Nassfeld 2007 Ari Aalto, LAGUNA-LBNO Paris

PSP Pyhäsalmi -Dual unit Ari Aalto, LAGUNA-LBNO Paris

Linth- Limmern Switzerland 1000 MW Start up 2015 Ari Aalto, LAGUNA-LBNO Paris

Pyhäsalmi Mine - in 1400 m depth Ari Aalto, LAGUNA-LBNO Paris

PSPP Pyhäsalmi current schedule 2013 Pre-Feasibility Study more detailed technical concepts corresponding cost estimates revenue generation possibilities coordination with Laguna project discussions with Fingrid legal aspects, permiting issues commercial viability in general review of feasibility among the partners Ari Aalto, LAGUNA-LBNO Paris

PSPP Pyhäsalmi current schedule II 2014 Full scale Feasibility Study selection of technical concept pre-engineering, modell tests main machinery bids in detailed construction plan & schedule detailed cost structure revenue generation & financial modell legal issues, final partners, risks etc Financing, permitting, investment decisions 2016 – 2020 Construction & installations Ari Aalto, LAGUNA-LBNO Paris

Pump Storage Power Plant Pyhäsalmi Concept - Background and current status Thank you for attention! Ari Aalto Paris Ari Aalto, LAGUNA-LBNO Paris