BERCEN plenary meeting Budapest, September 9 2002 Agenda item 4 National key achievements in environmental enforcement and compliance, and proposals on.

Slides:



Advertisements
Similar presentations
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
Advertisements

BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
Improving implementation and Enforcement 17 February 2011 Terry Shears - IMPEL Vice Chair.
Second BERCEN Plenary Meeting Ohrid, September Agenda item 11 Key achievements in environmental enforcement and compliance, and discussion on.
TURKISH ENVIRONMENTAL COMPLIANCE SYSTEM FEVZİ İŞBİLİR TURKISH NATIONAL COORDINATOR FOR ECENA DEPUTY DIRECTOR GENERAL DG FOR ENVIRONMENTAL MANAGEMENT TURKISH.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Analysis of minimal criteria for environmental inspection.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.
Report on the current legal structure and resources available to the environmental protection agencies and inspectorates in Croatia 1st BERCEN Exchange.
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
Supervision and regulation of banking system duty is given to a autonomous organization called Banking Regulation and Supervision Agency. BRSA is public.
WSNTG Annual Conference September 2007 Water Services National Training Group 11 th Annual Conference 6 th September 2007.
Application of minimum criteria for environmental inspections in Bulgaria.
EU ACCESSION PROCESS ECENA Plenary Meeting Zagreb January 2006 Carmen Falkenberg Ambrosio - European Commission.
ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia Update on strengthening the implementation and enforcement of EU environmental.
1 ACCREDITATION – BG situation April 2014, Prague STATE AGENCY STATE AGENCY FOR METROLOGICAL AND TECHNICAL SURVEILLANCE TECHNICAL SURVEILLANCE 1.
First ECENA Plenary Meeting Zagreb, January 2006 Agenda Item 5 Guidance for Reporting on IPPC Directive Implementation and RMCEI Implementation Ruslan.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
MINIMUM CRITERIA Project Manager Marianne Lindström, Bulgaria SYKE, Expert Services, Environmental Management Division.
Ohrid, Macedonia September Second BERCEN plenary meeting - Ohrid, September Key achievements in environmental enforcement and.
Third BERCEN Plenary Meeting December 16-17, 2004 Brussels, Belgium Key Achievements in Environmental Enforcement and Compliance in the Republic of Montenegro.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
4 th Exchange Programme Cluj Napoca, October, 2005 REPUBLIC OF CROATIA Updates in the Transposition and Implementation of IPPC directive Updates.
Croatian Report on Key Achievements in Environmental Enforcement and Compliance Josipa Blažević-Perušić, B.Sc. Arch. Assistant Minister Anita Pokrovac.
Meeting of the TEMPUS DoQuP Project –Workshop on “Documentation for Quality Assurance of Study Programs" 1-6 May 2012, Bishkek, Kyrgyzstan Accreditation.
Balkan Environmental Regulatory Compliance and Enforcement Network BERCEN Secretariat The Regional Environmental Center for Central and Eastern Europe.
1 ASPECTS REGARDING PLANNING AND REPORTING RELATED TO RECOMMENDATION 331/2001/EC ON MINIMUM CRITERIA FOR ENVIRONMENTAL INSPECTION AND ITS IMPLEMENTATION.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Bulgaria.
CONTROL Environmental protection act Boyko Malinov Ministry of environment and water Bulgaria.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
Republic of Serbia BENCHMARKING AND SETTING ENVIRONMENTAL COMPLIANCE AND ENFORCEMENT INDICATORS Ministry of Science and Environmental Protection Directorate.
Monitoring on batteries and accumulators in Bulgaria.
Ministry of Waters and Environmental Protection, Romania 1 BERCEN plenary meeting - Budapest, September 9, 2002 National key achievements in environmental.
3rd BERCEN Exchange Programme, Prague WASTE CONDITIONS IN ENVIRONMENTAL PERMITS Mrs. Marianne Lindström, Finnish Environmental Institute,
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Stabilisation & Association Process: the EU Policy for South East Europe Brussels December 2004.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Twinning project ENEA – ENforcing Environmental Acquis Skopje, 19 th of November, 2015.
COOPERATION AND COORDINATION OF THE CONTROL ON THE ILLEGAL TRAFFIC OF WASTE IN BULGARIA Workshop on Illegal Traffic Bratislava, Slovak Republic, 3 rd to.
1 Third BERCEN Plenary Meeting Brussels, December 2004 Agenda item 13 Key achievements in environmental enforcement and compliance - discussion on.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Third BERCEN Plenary Meeting December , Brussels Belgium The key achievements in environmental enforcement and compliance REPUBLIC OF SERBIA.
Svetlana Parežanin, head of Department Sector for control and surveillance Major activities of the Serbian inspectorate from September the second.
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Consultant: CMDC Joint Venture Czech experience - Use of BREFs and national BAT notes, role of IPPC Agency, Czech TWG Multi-Country Workshop June 8th,
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
Ministry of Environment, Forests and Water ManagementAlbania ECENA Exchange Programme First Plenary Meeting January, 2006 Zagreb, Croatia.
1 Kosova/o ECENA 3 rd Plenary meeting September 18-19, 2008 Istanbul, Turkey.
Report on reforms in environmental policy and reconstruction Bosnia and Herzegovina 8th REReP Task Force meeting September 23, 2005 Brussels, Belgium.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and climate change.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
Marta Szigeti Bonifert Executive Director Progress Achieved in REReP Implementation since the 5th Task Force Meeting Sixth REReP Task Force Meeting November.
Executive Environment Agency
PRESENTATION OF MONTENEGRO
Dr Costas Papastavros Environment Service
ECENA 3rd Plenary meeting
EUROPEAN INSTITUTIONS
PRESENTATION OF MONTENEGRO
Second BERCEN Plenary Meeting September
BERCEN Plenary Meeting Budapest, September 9, 2002 Agenda item 4
BERCEN plenary meeting Budapest, September Agenda item 4
Preparation of the Heavy Metals Protocol Ratification by Ukraine
Coordination of the National Statistical System of the Republic of Macedonia Kruševo, 2018.
Presentation transcript:

BERCEN plenary meeting Budapest, September Agenda item 4 National key achievements in environmental enforcement and compliance, and proposals on further BERCEN activities BULGARIA

Key achievements Legislation: New Environmental Protection Act New Environmental Protection Act (adopted in July by the Parliament – returned by the President – final adoption expected)  4 Regulations drafted under the EPA (to be enforced 6 months after its coming into force) Law on Biodiversity (State Gazette 77/Aug.2002 ) Law on Biodiversity (State Gazette 77/Aug.2002 ) 4 new (approximating) regulations in the Chemicals sector 4 new (approximating) regulations in the Chemicals sector

Key achievements Drafted legislation: Draft Law on Genetically Modified Organisms Draft Law on Genetically Modified Organisms (at the stage of inter-institutional agreement) Draft new Waste Management Law Draft new Waste Management Law (in the Parliament) Draft Regulation on packaging and packaging waste Draft Regulation on packaging and packaging waste Draft Regulation on PCB and PCT Draft Regulation on PCB and PCT

Key achievements New Structures: 4 River Basin Directorates (permit and control functions) : 4 River Basin Directorates (permit and control functions) :  Varna – Black Sea Region  Pleven – Danube Region  Plovdiv – river catchments of Maritza, Arda and Toundja  Blagoevgrad - river catchments of Mesta and Struma To operate with 20 people each by the end of 2002 To operate with 20 people each by the end of people to be appointed from January 1, people to be appointed from January 1,

Key achievements New Structures: Integrated Permits Department (permit functions) : Integrated Permits Department (permit functions) :  Within the Executive Environment Agency To implement the permit issuing provisions of the IPPC Directive and the new EPA To implement the permit issuing provisions of the IPPC Directive and the new EPA -

Key achievements New equipment: 3 small Regional inspectorates to be equipped with computers, servers and software 3 small Regional inspectorates to be equipped with computers, servers and software (within REREP 1.7) New hazardous waste database in place within the Executive Environment Agency New hazardous waste database in place within the Executive Environment Agency New packaging and packaging waste database in preparation in the Executive Environment Agency New packaging and packaging waste database in preparation in the Executive Environment Agency

Key achievements Planned training for inspectors: Study visits of inspectors in EU Member States - to be supported by TAIEX Study visits of inspectors in EU Member States - to be supported by TAIEX Seminar and training on the implementation and enforcement of the new EPA - to be carried out by the National Institute for Public Administration and European Integration (planned for January 2003) Seminar and training on the implementation and enforcement of the new EPA - to be carried out by the National Institute for Public Administration and European Integration (planned for January 2003) On-going (twinning) training on enforcement of IPPC and SEVESO On-going (twinning) training on enforcement of IPPC and SEVESO

Key achievements Increased number of qualified inspectors on board: According to the New Administrative structure of the Ministry of Environment and Water, approved by the Council of Ministers in July 2002: According to the New Administrative structure of the Ministry of Environment and Water, approved by the Council of Ministers in July 2002:  Regional Inspectorates in 2003 (477in 2000; 502 in 2001)  River Basin Directorates – 250 in 2003 (20 in 2002)

Operative control Year 2001(appr. quantative data): Inspected sites – ( in 2000) Inspected sites – ( in 2000) Penalty statements – 1300 (1700 in 2000) Penalty statements – 1300 (1700 in 2000) Sanctions imposed – 300 (420 in 2000) Sanctions imposed – 300 (420 in 2000) Not considerable increase in the amount of collected sanctions, compared to 2000

Operative control New approach in collecting statistical information on inspection: There was not official statistics of the appealed administrative measures and the court cases related to enforcement of the environmental law. There was not official statistics of the appealed administrative measures and the court cases related to enforcement of the environmental law. New questionnaire related to the Inspectorates’ annual reports has been developed in accordance to the Draft IMPEL Guidance on compliance with Article VIII of the Recommendation on minimum criteria for environmental inspection. New questionnaire related to the Inspectorates’ annual reports has been developed in accordance to the Draft IMPEL Guidance on compliance with Article VIII of the Recommendation on minimum criteria for environmental inspection.

BERCEN activities in 2003 Proposal: 2-days exchange program related to IPPC permitting and installations inspection to be carried out in Bulgaria