 Final Inspection Reminders  and  Recurring Corrective Work Items.

Slides:



Advertisements
Similar presentations
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Advertisements

Earthwork Operations & Equipments
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Subpart R Steel Erection
Specification Changes Pub 408/2011 Changes 1 & 2 District 8-0 Winter Construction School February 23rd, 2012 Linda Atkinson Bureau.
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
5/1/2015OSHA Office of Training & Education 1. 5/1/2015OSHA Office of Training & Education 2 Subpart Q - Concrete & Masonry Construction ( )
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
Maintenance of Traffic (MOT)
Engineers/Contractors Meeting Lexington, KY Steven Criswell Division of Construction.
Foundation Systems.
Project Close Out CTC-470.
Vegetation Establishment. Exposed soil occurs on all construction sites.
Floor Systems and Foundation Support
CONSTRUCTING A FIVE CABIN LATRINE
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Placing Quality Concrete
VALUE ADDED FEATURES Who’s Excited??? 2015 Construction Academy Larry Ritchie July 28 th, 2015.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Appendices Subpart R Steel Erection
1926 Subpart R OSHA’s Steel Erection Standard Scope
FALL PROTECTION IN THE WORKPLACE Trainer’s Guide
Other Construction Projects
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
The American Recovery and Reinvestment Act of 2009 (ARRA) Federal Highway Administration Wisconsin Division January, 2010 Jason P. Spilak, PE, ARRA Engineer.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Wes Marshall, P.E. University of Connecticut March 2007
CONSTRUCTION ADMINISTRATION Project Closeout Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate Program.
Bridge Engineering (5) Substructure – Abutments and Piers
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Preparing Foundations for Cylinders & ASME Tanks
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Specification & Quantities Estimating Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
Central Valley Flood Protection Board Meeting – Agenda Item No. 9A CVFPB MEETING – October 25, 2013.
Sign Structures Updates: Helpful Tips for Inspectors
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
1 BLUE SIGNAL PROTECTION Blue Signal Protection of Workmen This rule outlines the requirements for protecting railroad workmen who are inspecting,
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
BUILDING CONSTRUCTION
KYTC Change Order (Contract Modifications).
Firefighter Emergency Escape Systems New York State Department of Labor Public Employee Safety and Health (PESH)
Estimating and Scheduling CEE 492
PROJECT DEATH Stephanie Rich. Corrective Work Punch List Punch List Work Complete Date Work Complete Date Request Final(s) Request Final(s) Comprehensive.
Maintenance and Temporary Traffic Control
Applicant:Derek and Erica Hokkanen Site Address: th Street Property #s: A Computer #s: Location:Section 33, T30N, R16W,
Building Permit Contractor Round Table 8744 Government Drive New Port Richey, Florida Wednesday – May 8, :00 pm to 4:00 pm.
CAISSON FOUNDATION.
Kentucky Transportation Center Contractor Performance Evaluations S TEPS AND G UIDANCE Kentucky Transportation Center Kentucky Transportation Cabinet.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
ALL GROWN UP PROJECT ADULTHOOD Matt Looney Section Engineer’s Meeting Spring 2014.
Leads Institute of Technology & Engineering
CAD-Architecture Inst: Mr. Johnston Logan High School
Foundation – jay Desai.
Walking and Working Surfaces
4th Annual Construction Law Summit
Testing & Inspecting QC starts with submittals
Understanding Common Code Issues
Presentation transcript:

 Final Inspection Reminders  and  Recurring Corrective Work Items

.Why.When By whom

- Consistency with Proposal, Plans and Specifications -New set of eyes -Collaboration – preferably before -Not a test

The Department and other appropriate agencies, such as FHWA, will complete final inspections on all items of work for Formal Acceptance within 90 calendar days of the date of issuance of the Project Completion Notice. Except

The exception to this requirement is the inspection of striping, seeding, other erosion control items, tree planting, and landscaping.

Central Office Grade and Drain Structures Electrical Signs

May be grouped or separated out. -Structures -Grade and Drain -Electrical -Paint -Signs

District Office -Re-Surfacing -Guardrail -Slides -Mowing - Striping

A reminder for districts 4 and 12 it is not pronounced lazy one.Inspections Not confrontational but may request reasons.Much easier to have the contractor address issues as they occur, when the threat of LD is ENFORCEABLE Prefer not to see repetitive deficiencies

Make sure either the TEBM or the liaisons contact the other agencies or divisions to ensure inspections are completed in the required time-frame. Do not depend on site manager !!!!

SS : “The Department will not consider the work complete and will not make final payment until the Contractor clears the right-of-way, borrow pits, and all ground the Contractor occupies in connection with the work of all rubbish, equipment, excess materials, temporary structures, and weeds.”

.In short: Not Clean Not Complete.Clean up Project site.Get rid of all construction Debris.If signs are no longer needed remove them.Remove equipment away from clear zone if.not adequately protected or de-marked..Remove Formwork – especially on bridge. overlay projects with full depth patching or pier repair

Masonry Coating

Masonry Coating - – 6” below ground or fill line

Masonry Coating – 6” below ground or fill line

Washed shoulders – indicate and underlying problem. ( drainage/grade)

Steel from demolished structures should removed before burying concrete: SS – The Department may allow concrete rubble, without protruding reinforcement, to be placed in embankment provided that no fragment is larger than one foot in any dimension or is placed within 2 feet of the subgrade.

Drop offs -especially at intersections and entrances

Guardrail posts.. Make sure there are no voids around posts.

Make sure posts are not damaged.

 Ordinary Surface Finish. –SS  Surface Finish. Apply the following surface finishes to various parts of  concrete structures:  1) Ordinary Surface Finish,  2) Masonry Coating Finish, or  3) Floated Surface Finish.  Apply ordinary surface finish to all concrete surfaces not required to have masonry coating finish or a floated surface finish. Consider ordinary surface finish as a final finish on all surfaces not required to have masonry coating. 3/2/14

Ordinary Surface Finish. SS  Immediately following removal of forms, remove all fins and irregular projections from all surfaces except those not to be exposed  ……(How to get the required finish is further described )……..  The Engineer will consider individual surfaces satisfactory and in compliance with requirements for ordinary surface finish when the surfaces have been formed and finished as specified and the Engineer has approved the resultant surface as to uniformity, color, texture, and smoothness. 3/2/14

Ordinary Surface Finish

Ordinary surface finish – all concrete surfaces on structures.

Rolling Straight-Edge SS and Are we using this on all of our bridges?

Bridge ends - Interesting stat.. The bump at the end of the bridge is a common, complex problem that involves a dizzying range of design factors, including soil settlement in embankments, approach fill material, abutment foundation type, abutment type, structure type, joints, approach slab, paving and construction methods. The bump problem affects about 25% of U.S. bridges, or approximately 150,000 structures. The amount of money spent every year on the repair of this problem nationwide is estimated to be at least $100 million.

Bridge ends

Have contractor wedge without creating a bump in another location.

Neoprene Joints Depth

Neoprene Joints Depth

Neoprene Joints Depth

Silicone Joints Depth= 3/8 “ (+ or - 1/8”)

Removal of erosion control traps

When grates are to be bolted to the frames or connected by chains to the wall of the structure, ensure; Bolts and or chains are present Secured The correct quality and size of the attachment mechanism is used.

The Engineer will issue written final inspection reports for items of work upon completion of each final inspection. The reports will include a list of all uncompleted work and required corrective work.

Removal of Work Zone signs and devices Especially Speed limit signs Blasting signs Detour signs