19 December 2006Eddy Jans Annual Scientific Meeting0 The advent of the VELO introduction sensors mechanics vacuum motion cooling PU-modules installation.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Vrije Universiteit amsterdam CERN, November 27, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand Subatomic.
Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
14 June 2007VELOEddy Jans 0 Recent VELO-installation++ activities June 14, 2007 Potmeter calibration Bake-out Cabling & Commissioning.
7 Nov 2002Niels Tuning - Vertex A vertex trigger for LHCb The trigger for LHCb ….. and the use of the Si vertex detector at the first and second.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
IEEE Dresden, Wim de Boer, Univ. Karlsruhe An optimized tracker design using CO2 cooling Outline: 1.Requirements for sLHC trackers (massless.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
1 The LHCb Vertex detector 15/9/2003 Physics –Goals –Properties and consequences LHCb –Overview of the detector Vertex –Specifications –Silicon stations.
Lukasz ZwalinskiATLAS IBL CO 2 cooling 1 CO 2 cooling system for Insertable B Layer detector into the ATLAS experiment L. Zwalinski, C. Bortolin,
Drift Chambers Drift Chambers are MWPCs where the time it takes for the ions to reach the sense wire is recorded. This time info gives position info:
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
EDR - Mech. 2; December 16/17, 2002 Hans de Vries - 1 Status of Vertex at NIKHEF VELO Mechanics  RF/vacuum foil  Rectangular bellow  RF measurements.
Martin van Beuzekom, STD6 14 th September Outline: Introduction to LHCb and VErtex LOcator (VELO) Status of VELO Beamtests Upgrades Summary LHCb.
11/01/2006Wilco Vink / Martin van Beuzekom / L. Wiggers L0 ECS Workshop Pile-Up System.
The LHCb VErtex LOcator Olaf Behrendt on behalf of the VELO group Novosibirsk,
VTCS overview 13 April 2006 NIKHEFBart Verlaat 1 NIKHEF involvement in VELO ~1 m module support CO 2 cooling detector "hood" kapton cables Vacuum vessel.
November 29, 2002 NIKHEF-1 Hans de Vries Status RF foil RF/vacuum foil  Purpose  Production methods used  Deformations: static - overpressure  Electrical.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
LHCb VELO Meeting LHCb VELO Cooling System Bart Verlaat (NIKHEF) 25 February 2003.
LHCb VErtex LOcator & Displaced Vertex Trigger
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
Power Up of the First VELO Module at IP8 Eddy & Olaf on behalf of the VELO group.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
L0 Workshop 17/10/2007 Wilco Vink / Martin van Beuzekom Leo Wiggers / Sander Mos 1 Commissioning/Status Pile-Up System.
Limits of the current VTCS Ann Van Lysebetten Bart Verlaat Martin van Beuzekom VELO upgrade meeting 14/11/2008 pix module construction kick-off 09/11/2009.
ECS workshop, CERN, may ‘00M. Ferro-Luzzi LHCb Vertex Detector System Reminder of current VELO design Controls: Motion mechanics Vacuum system Cooling.
LHCb Vertex Detector and Beetle Chip
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Integration and commissioning of the Pile-Up VETO.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
Eddy Jans 0 Vertex2013 Operational aspects of the VELO cooling system of LHCb Eddy Jans (Nikhef) on behalf of the LHCb VELO group Introduction Main components.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group July 28, 2008Vertex 2008: 17th International.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
A.P.Colijn1 Nikhef Nikhef – History CO Nikhef - Who is Who CO Nikhef - Work in Progress CO Nikhef - Plans.
Aras Papadelis, NIKHEF Jaarvergadering 19/12/06 1 Fresh results from the LHCb Vertex Locator test beam Aras Papadelis Ann Van Lysebetten, Anne Keune, Eddy.
12 th LECC, Valencia Sep 2006Aldo F. Saavedra 1 The Vertex Detector of LHCb - VeLo Aldo F. Saavedra Glasgow University On behalf of the VeLo group.
9 December 2011Eddy Jans 0 LHCb-VELO CO 2 cooling plans CO 2 - meeting Present VELO - physics running in LongShutdown1 2013& physics running.
Installation of the T600 at Fermilab
Developing Radiation Hard Silicon for the Vertex Locator
Tracking detectors/2 F.Riggi.
VELO Thermal Control System
Simulated vertex precision
VELO Thermal Control System
LHCb comprehensive review, Paula Collins
Nikhef Nikhef – History Nikhef - Who is Who
Pixel CO2 Cooling Status
The LHC collider in Geneva
VELO Thermal Control System
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
LHCb PileUp VETO L0 trigger system using large FPGAs (M
CO2 Cooling IPNL Nick Lumb, 28/01/09.
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
Niels Tuning (Outer Tracker Group LHCb)
VELO-meeting January 25, 2007 Sub-projects: SX & SX
The LHCb vertex detector
Setup for testing LHCb Inner Tracker Modules
The LHCb VErtex LOcator
Presentation transcript:

19 December 2006Eddy Jans Annual Scientific Meeting0 The advent of the VELO introduction sensors mechanics vacuum motion cooling PU-modules IP8 outlook

19 December 2006Eddy Jans Annual Scientific Meeting1 250 mrad 10 mrad VErtex LOcator introduction IP in the VELO

19 December 2006Eddy Jans Annual Scientific Meeting2 L = 2x10 32 cm -2 s b-hadrons/year displaced vertex at l ≈1 cm need good impact parameter resolution detector halves: - retractable by 30 mm due to beam excursions during injection & tuning - adjustable by ± 5 mm in x&y due to variations in IP from fill to fill displaced vertex l primary vertex

19 December 2006Eddy Jans Annual Scientific Meeting3 VErtex LOcator Silicon sensors Vacuum vessel rf-box rectangular bellows exit window wake field suppressor ~1 m kaptons

19 December 2006Eddy Jans Annual Scientific Meeting4 VELO detector half kaptons silicon sensors cooling pipes + cookies manifold

19 December 2006Eddy Jans Annual Scientific Meeting5 2 PileUp-stations R-sensors VELO detector half 21 VELO-stations R+  sensors 172 k strips Interaction 7 mm from Si high and non-uniform radiation dose - radiation hard Beetle frontend chip - radiation hard n-on-n sensor ≈100 cm

19 December 2006Eddy Jans Annual Scientific Meeting6  (radial strips with stereo angle) sensors 300  m thick 2048 strips n-on-n, diffusion oxygenated float zone double metal layer Micron Ltd. 42 mm R pitch: 38 → 103  mpitch: 40 → 78  m readout with 16 Beetle chips analog pipeline and readout full readout in 900 ns 19 ns peaking time S/N ≈18/≈21 for R/  7 mm

19 December 2006Eddy Jans Annual Scientific Meeting7

19 December 2006Eddy Jans Annual Scientific Meeting8  IP 15 mm between neighbouring and slightly overlapping modules thin, leak tight corrugated rf-foil

19 December 2006Eddy Jans Annual Scientific Meeting9 super plastic pressing of 300  m Al foil with hot gas welding into a vacuum tight box rf-box Chiel Bron, Frans Mul, Erno Roeland, Hans de Vries 30 mm

19 December 2006Eddy Jans Annual Scientific Meeting10  p < 5 mbar !! last week installed in VELO-vessel

19 December 2006Eddy Jans Annual Scientific Meeting11 between (movable) rf-boxes and beam pipe 75  m CuBe foil wakefield suppressors Erno Roeland, Dimitri John, Martin Doets

19 December 2006Eddy Jans Annual Scientific Meeting12 Wake field suppressor mounted on VELO exit window

19 December 2006Eddy Jans Annual Scientific Meeting13 vacuum Luc Jansen, Martin Doets, Fred Schimmel 2 roughing pumps 3 turbo pumps 2 ion getter pumps 13 valves 1 bypass valve 6 membrane switches 11 Pirani gauges 7 Penning gauges

19 December 2006Eddy Jans Annual Scientific Meeting14 control implemented in a PLC - evacuating & venting while pressure difference between beam and detector volume < 5 mbar - bake out procedure GUI in PVSS UPS system M V1 V2

19 December 2006Eddy Jans Annual Scientific Meeting15 end pressures thus far without bake-out and without ion getter pumps: 4 x mbar pressures during venting p [mbar] 10 time p beam -p det. [mbar]

19 December 2006Eddy Jans Annual Scientific Meeting16 motion control implemented in a PLC readout via resolvers reproducibility < 10  m 3 d.o.f.: XR, XL and Y GUI in PVSS software and hardware limits UPS system motion Piet de Groen, Martin van Beuzekom, Fred Schimmel

19 December 2006Eddy Jans Annual Scientific Meeting [mm] rf-foil VELO open 0. half-open VELO tracking LHC-beams crossing VELO closed [mm]

19 December 2006Eddy Jans Annual Scientific Meeting18 cooling design&construction: Bart Verlaat, Berend Munneke, Erno Roeland, Dimitri John, Marco Kraan, Martin Doets control: Luc Jansen, Martin van Beuzekom, Piet de Groen, Jaap Stolte, Ann Van Lysebetten, Jaap Kuyt, Auke-Pieter Colijn 2-phase gas R404a chiller 2-phase condenser evaporator 60 m concentric tube pump restriction accumulator shielding wall coolant: two-phase CO 2 liquid VELO detector cooling plant

19 December 2006Eddy Jans Annual Scientific Meeting19 cooling blocks vacuum feed trough liquid inlet vapor outlet PT100 Interface board PT100 cables cooling pipes  inner =0.5mm evaporator

19 December 2006Eddy Jans Annual Scientific Meeting20

19 December 2006Eddy Jans Annual Scientific Meeting21 □  mass flow  mod17  Mod25  evaporator total mass flow [g/s] temperature [ o C] heat load 1.4x nominal presumably annular gas+liquid flow nominal flow = 12 g/s dry out

19 December 2006Eddy Jans Annual Scientific Meeting22 cooling plant CO 2 -part freon chiller

19 December 2006Eddy Jans Annual Scientific Meeting23 88 analog differential pairs per set reliable after 10k movements of 35 (5) mm x (y) sandwiched between 2 power planes rolled annealed copper of 17  m traces 150  m L=75 cm GSP Ltd. kaptons Jan Koopstra, Martin van Beuzekom, Sander Mos, Marco Kraan

19 December 2006Eddy Jans Annual Scientific Meeting24

19 December 2006Eddy Jans Annual Scientific Meeting25 4 upstream modules with R-sensors uses digital readout of Beetle-chips vetoes BXs with multiple PV’s Pile-Up Wilco Vink, Sander Mos, Martin van Beuzekom, Leo Wiggers, Joop Rovekamp 4 PU-hybrids 8 optical Tx-boards 4 vertex processing boards 1 output board L0DU 125 Gb/s under construction

19 December 2006Eddy Jans Annual Scientific Meeting  m R sensorpitch adapters16 Beetle chips 8 layer hybrid integrated kapton tails

19 December 2006Eddy Jans Annual Scientific Meeting27 LHCb pit 4 years ago VELO destination Installation in IP8 Frans Mul, Luc Jansen, Piet de Groen, Jaap Stolte, Martin Doets, E.J.

19 December 2006Eddy Jans Annual Scientific Meeting28 The travel of the VELO from NIKHEF (April ’06) to IP8

19 December 2006Eddy Jans Annual Scientific Meeting29

19 December 2006Eddy Jans Annual Scientific Meeting30 LHCb pit now VELO

19 December 2006Eddy Jans Annual Scientific Meeting31 outlook for 2007 perform vacuum tests with rf-boxes installed construct + test + install + test cooling plant finish LV, HV, analog, and control cabling, interlocks system assemble detector halves install detector halves in VELO-vessel commission detectors evacuate ……… beam on move VELO in start DAQ off we go