1 Optics: design, procurement, assembly and testing plans Dr Peter Doel, University College London.

Slides:



Advertisements
Similar presentations
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Advertisements

6-7 July 20051B. C. Bigelow - UM Physics Finite element analysis of DECam May 11 C1 corrector lens – gravity and thermal load cases Bruce C. Bigelow, Physics.
ARCTIC Post-PDR Optical Design Study
BigBoss Optical Corrector Intro to UCL M. Sholl 16 July 2010.
Demetrio Magrin INAF – Astronomical Observatory of Padova Optical Design Catania, 11/06/2014.
Keck I Cassegrain ADC: Preliminary Design Overview UCO/Lick Observatory 15 October 2003.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
Tibor Agócs Purpose of the talk  Wide-field spectroscopy/imaging is the driver  MOS  IFU  NB/WB imager  Current FOV is 40 arcmin – it’s.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
Ch 25 1 Chapter 25 Optical Instruments © 2006, B.J. Lieb Some figures electronically reproduced by permission of Pearson Education, Inc., Upper Saddle.
Figuring large off-axis segments to the diffraction limit Hubert Martin Steward Observatory University of Arizona.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Dennis C. Evans p1 SuperNova/Acceleration Probe 16 November 2001 Optical Analysis & Stray Light Evaluation Optical Analysis and Stray Light Evaluation.
Basic optics lab skills Optics care, types of optics, alignment tricks.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Advanced Optics Lab at San Jose State University Ramen Bahuguna Department of Physics.
M agellan I namori K yocera E chelle Rebecca BernsteinU. Michigan Steve ShectmanCarnegie Observatories Steve GunnelsParagon Engineering Stefan MochnackiU.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
ZTFC 12-segment field flattener (and related) options R. Dekany 07 Aug 2012.
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
High Resolution Echelle Spectrograph for Chinese Weihai 1m Telescope. Leiwang, Yongtian Zhu, Zhongwen Hu Nanjing institute of Astronomical Optics Technology.
Telescope Integration and Tests Tuesday Afternoon.
K. Gilmore Camera Workshop
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
K-D-PR Fabrication and testing of KGMT FSM prototype Oct Ho-Soon Yang, Hak-Yong Kihm, Il-Kwon Moon, Jae-Bong Song, Yun-Woo Lee Korea.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
ZTF Optics Design P. Jelinsky ZTF Technical Meeting 1.
The Prime Focus Imaging Spectrograph Design and Capabilities
4/20/2004s.e.mathews1 Steward Observatory Technical Division Mechanical Engineering Seminar Series Seminar #1 April 20, 2004.
1 Design and analysis for interferometric measurements of the GMT primary mirror segments J. H. Burge a,b, L. B. Kot a, H. M. Martin a, R. Zehnder b, C.
Notre Dame extended Research Community NANOWeek: The Power of Microscopes Optics Visible light Optical microscopes and telescopes Scanning electron microscope.
1st Advanced Virgo Review – November 3-4, 2008 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Substrates.
Binospec - Next Generation Optical Spectrograph for the MMT
ZTF Optics Design ZTF Technical Meeting 1.
System Performance Metrics and Current Performance Status George Angeli.
Notre Dame extended Research Community NANOWeek: The Power of Microscopes Optics/Use of light Optical microscopes and telescopes Scanning electron microscope.
New emittance monitor beamline
The High Altitude Observatory (HAO) at the National Center for Atmospheric Research (NCAR) The National Center for Atmospheric Research is sponsored by.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n s t r u m e n t S y n t h e s i s a n d A n a l y s i s L a b o r a t o r y APS Formation Sensor.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
J. H. Burgea,b, W. Davisona, H. M. Martina, C. Zhaob
Optomechanical Technologies for Astronomy, SPIE 6273 (2006)1 Manufacture of a 1.7 m prototype of the GMT primary mirror segments Buddy Martin a, Jim Burge.
LIGO-G D Core Optics Components (COC) Polishing Pathfinder Kickoff Advanced LIGO Project GariLynn Billingsley Caltech.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
The optical upgrade of the Dark Energy Survey corrector Dr David Brooks Optical Science Laboratory Department of Physics & Astronomy University College.
Fused Silica for Infrared @ 1319nm Dr. Mark Altwein, Pisa, Heraeus Quarzglas Home of Quarz Solutions.
ITOP Quartz Procurement Status James Fast Pacific Northwest National Laboratory PNNL-SA
Development of Micro-Pore Optics at NAOC MPO research group X-ray Imaging Laboratory, NAOC Presented by Chen Zhang.
Prime Focus Imaging Spectrograph Status
THE COMPANY OPTIKRON, your partner for micro-optics, assemblies and optical coatings was founded in 1992 in the optics and technology region of Jena. We.
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
30-Nov-2006 Jean-Marc Defise - CSL
Prime Focus Imaging Spectrograph Status
DES Blanco602 Opto-Mechanics
Point Source Transmission Simulations on the COROT baffle
Status of the PANDA Solenoid Magnet Production in BINP
Intra-pixel Sensitivity Testing Preliminary Design Review
Preliminary Design Review
Paper Synopsis: Lens Centering using the Point Source Microscope Robert E. Parks by Wenrui Cai Opti521.
Optics Alan Title, HMI-LMSAL Lead,
Injector Drive Laser Technical Status
Presentation transcript:

1 Optics: design, procurement, assembly and testing plans Dr Peter Doel, University College London

2 Contents WBS 1.4 Optical design Optics procurement and manufacture , Lens cell design and lens mounting Lens alignment in camera 1.48

3 Optics Roles University College London –Optics procurement and testing –Lens cell design/construction and mounting –Optical alignment University of Michigan –Optical Design/Stray light analysis –Filter procurement –Filter mechanism design/build –Shutter design /build Fermilab –Barrel design/build Chicago –Active alignment sensing

4 Field of view –2.2 degree diameter Pixel scale –57 µm/pixel (f/2.9) Image quality: –Resolution Element: < 2.25 pix (0.59”, 34µm) –Goal (as-built) fwhm: ~ 0.33” (18 µm) –Goal (design) fwhm: ~ 0.27” (15 µm) RMS spot size R rms = 8.7µm (area weighted) Wavelengths: –g, r, i, z (0.4 – 1.0 µm) –with a secondary goal of good performance down to 0.32 µm System throughput –Greater than 60% over the focal plane Pupil ghost: –intensity gradient < 3% over 61mm Optical Specification

5 Status of Optical Design Preliminary design development (Nov 2005-Feb 2006) –Number of elements –Glass choice –Overall size and volume (diameter of first element) –Number of aspheric lens surfaces Preliminary Design Review (Feb 2006) Final design development (Feb-Oct 2006) –Feedback from PDR included and optimisation of design –Preliminary sensitivity analysis completed Critical Design Review (Feb 2007) –UK provisional location –Final review before placing orders

6 Optical Design 5 lens design All fused silica Two aspheric surfaces C1 lens diameter 0.98m Minimum thickness ratio 1:10 Image scale 1" = 57μm 0.26"/pixel Sol-Gel/MgF 2 coatings R rms = 8.7 um Design due to Rebecca Bernstein

7 Lens Parameters Surface 1 Radius (mm) Surface 2 Radius (mm) Centre Thickness (mm) Edge Thickness (mm) Diameter Surface 1 (mm) Diameter Surface 2 (mm) Lens Lens * Lens Lens * Lens * Aspheric surface

8 Blank Procurement WBS :Status Preliminary blank specification (Nov 2005-Feb 2006) –Choice of blank material (fused silica, BSL7-Y,etc) –Discussion with manufacturers (Corning, Ohara, Schott, Heraeus) –Availability –Manufacturing issues (slumping, homogeneity) –Schedule –Cost Fused Silica chosen (Corning, Heraeus) –Good performance (especially in blue) –Available in sizes and homogeneity required –Production schedule ok Tender will be issued in December 2006

9 Corning Fused Silica HPFS Grade C is quoted as have a homogeneity of better than 2ppm. B is better that 1.5ppm and A better than 1ppm. The numeric refers to the inclusions: 1 has a total inclusion cross section per 100cm 3 of glass of less than or equal to 0.1mm 2 and 0 less or equal to 0.03mm 2 Delivery Weeks Grade Optic C C Optic C28-111C Optic C38-111B Optic C48-110B Optic C58-110A

10 Optics Polishing WBS :Status Input to preliminary optical design (Nov 2005-Feb 2006) –Discussion with manufacturers (SAGEM, SESO, Tinsley) –Manufacturing issues Lens size Asphere on convex or concave surface Size/gradient of asphere –Slope 1mm departure over 50mm was acceptable –All companies happy to quote on the proposed (or similar) design Testing issues –All optics tested in transmission to allow compensation for inhomogeneity Schedule Cost Tender for polishing will be issued in February 2007 –This will state optical specification and requirements on testing results during manufacture

11 U. Michigan will –handle procurement and testing of the filters –match SDSS – g,r,i,z and introduce a well defined cut-off at high wavelength –design and fabricate or procure a combined filter changer and shutter DES Filters WBS :Status

12 Filters bids as of June 2006 VendorBidDeliveryTotal CostData SAGEMNo--- Asahi-SpectraNo--- EMF Corp.No--- Barr Assoc.Yes26 wks ARO$213,000Yes Infinite OpticsYes?? wks ARO$300,000Yes JDS UniphaseYes20 wks ARO$378,000Yes Reynard Corp.Yes12 wks ARO$105,587Yes ZC&R Inc.Yes16-20 wks ARO$149,000Yes (Bruce Bigelow)

13 Optics Assembly and Test Lens mounting C1-C4 (WBS1.4.6) UCL –Design of lens cell and bonding technique (FEA, testing) –Handling of lenses –Alignment procedure definition Lens mounting C5 (WBS 1.4.7) FermiLab –Bonded straight to detector vessel –Design of lens cell and bonding technique (FEA, testing) –Alignment procedure definition Alignment of lenses in barrel (WBS 1.4.8) UCL –Handling of lens and cells –Alignment procedure definition

14 Production Procedure Blanks produced and ground to shape (US?) Blanks shipped to optical polishers (France?US?) Polished lenses shipped for coating (C1 and C5 could be coated by polishing firms) (US) Coated lenses shipped to UCL Lenses mounted in lens cells at UCL Lens and cells mounted in camera barrel at UCL Shipped to CTIO

15 Alignment Tolerances Lens Decentre Tolerance (μm) Tilt Tolerance (arcsec) Separation Tolerance to next lens (μm) C C C C C519020

16 Lens Mounting LBT lens mounting (from Diolaiti et al. SPIE 4841) Baseline athermal elastomeric (RTV rubber) bonding technique Looking at two cell options Invar lens cell + flexures + thin RTV layer (see figure) Steel cell + thick RTV layer

17 Lens to Cell Alignment Lens to cell –Lens to cell alignment performed using rotary table and digital dial gauges. Translation Stage Rotary Table D.G.I. Cell Cell Adjustment Screws Lens RTV inserted into gap

18 Lens/cell to Barrel Lens-cell alignment in barrel Mechanical alignment –Passive: using machined fiducials –Active: using rotary table and digital dial gauges Optical Alignment (see figures) –Using rotary table and laser beam

19 Optics Cost/Time Allocated CostTime Quoted Time allocated Blanks (inc grinding)$900,0005 months8 months Polishing$656, ,40013 months18 months Coating$123, ,000-3 months Filters$105, , months6 months Total$ million

20 Milestones MilestoneDate CDRFebruary 2007 Blanks Contract placedMarch 2007 Polishing Contract placedMay 2005 First lens to polishersJuly 2007 Last lens to polishers (C1)October 2007 First lens to UCLOctober 2008 Last lens to UCLApril 2009 Alignment of lens in cells completeMay 2009 Integration at UCL complete, ship to ChileOctober 2009 Assembly and test at CTIO completeMarch 2010