ESS Vacuum Standardization

Slides:



Advertisements
Similar presentations
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Advertisements

AT-LINE A Practical Application of Smart Modular Sampling Components IFPAC 2001 ABB.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Workshop “Vacuum systems of Synchrotron Light Sources“ organized by MAX-LAB & ALBA Barcelona, th September 2005 Instrumentation and Vacuum Control.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
ISO OPERATIONAL CONTROL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Training in Vacuum Technology for JUAS 2013 Students
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
Vacuum issues concerning the Proton Source and LEBT Salvo Marletta, Luigi Celona, Lorenzo Neri, Franco Chines, David Mascali.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
Cryomodule test stand at ESS site
Making Difficult Decisions in a Transparent Way –
LINAC4 Vacuum Control System Review
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
XFEL Vacuum System Commissioning
Introduction to W7-X Coil Testing at CEA – Saclay, France
Cryogenic C&C Scope of work
Horizontal Tests in a Vertical Cryostat
Optimum cryomodule length at the ESS
C.Octavio Domínguez, Humberto Maury Cuna
TTC Hot Topic Common Questions
Operator Training Requirements
SNS PPU Cryomodule Instrumentation
ISRC and LEBT Vacuum System Design
LEBT water cooling system
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
APTM and GRID interface requirement PBIP and PBW
Safety Readiness Review (SRR) Thomas Hansson, ESH
Hilko Spoelstra, Vacuum Group Specialized Technical Services / AD
Ola Ingemansson Electrical & Instrumentation Engineer
NSS integrated installation plan workshop Introduction
Machine Protection PLC Based System Verification and Validation Plan
Test Beamline System Requirements and Charge to PDR Committee
CHIC: Possibilities of Supply
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Target Safety System Interfaces
Vacuum Control System for Monolith Vacuum
SAR MEBT Bilbao March Mats Lindroos
MRV system budget and scheduling Short overview installation
Vacuum System Design for the Target Monolith System
Overview of the TARGET Monolith Rough Vacuum
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

ESS Vacuum Standardization Marcelo Juni Ferreira Vacuum System Section Leader European Spallation Source ERIC

Outline Vacuum Standardization, an Integrated Approach, Introduction to the Vacuum Standardization, Vacuum Standardization, an Integrated Approach, Vacuum Instrumentation specifications, Vacuum Control System, Vacuum Requirements examples: Proton Source (PS) and Low Energy, Beam Transport (LEBT), Target, Loki, ESS Vacuum Facilities (VacLab), Conclusions, 2 Feb 10, 2016

Introduction: ESS Vacuum system Target Warm LINAC Cold LINAC The ESS organization charges the ESS Vacuum System team with the responsibility for all ESS vacuum systems including not only the Accelerator, but also Instruments and Neutron Beam Lines and the Target. The main task of the team is to support the in kind contributions on the vacuum system and the integrated vacuum design of the ESS complex. Neutron instruments Feb 10, 2016

Introduction Justification: integrated design of the vacuum system, simplify common components, simplify maintenance, training, lower number of hardware spare parts, create scale to lower costs (bid process), simplify interfaces with other sub-systems (EX: ICS interface). It means, support the in kind work on their specific needs looking from the ESS long term operation in a most cost effective way. 4 Feb 10, 2016

Vacuum Standardization, an Integrated Approach Working closely with our partners across the project one of our primary goals was to promote the use of common vacuum equipment and standards. As a result a Vacuum Standardization meeting was held in February 2014 where equipment suitable for Standardization was agreed and reflected in the ESS Vacuum Handbook. An important element of this Standardization is the Procurement Policy applied for the procurement of all “major” vacuum equipment. The primary objective of the program is to develop a list of standard vacuum equipment for use project wide to minimize project costs, reduce spares holdings, training and achieve other benefits of standardization. http://europeanspallationsource.se/accelerator-documents Feb 10, 2016

Vacuum Instrumentation specifications A preliminary list of equipment to be included in this Standardization Program and have a ESS specification document include: Primary dry pumps, Sputter ion pumps and controllers, Turbo-molecular pumps, Getter and combo type (ion + NEG) pumps and controllers, Gate, angle, gas injection and fast valves including all aspect (elastomers, all-metal, limit switches, electromagnetics, pneumatics…), Vacuum Gauges and controllers, Residual Gas Analyser (RGA), Leak detectors, Vacuum hardware from ESS catalogue (most used items), etc. In general, these will supplied by the ESS to support work at ESS. The supply of specific equipment required by ESS partners to support work at their facilities will be their responsibility. Feb 10, 2016

Vacuum Control System Epics Domain ICS team responsibility Vacuum team responsibility Feb 10, 2016

Vacuum Requirements: Proton Source (PS) and Low Energy Beam Transport (LEBT) Feb 10, 2016

Vacuum Requirements: Proton Source (PS) and Low Energy Beam Transport Vacuum diagram Feb 10, 2016

Vacuum Requirements: Proton Source (PS) and Low Energy Beam Transport Vacuum wiring diagram and logic (interlock system) Feb 10, 2016

Vacuum Requirements: Proton Source (PS) and Low Energy Beam Transport

Vacuum Requirements: Target The moderate will operate in either helium or vacuum. In the vacuum mode the BPW will be removed and the monolith connected directly to the accelerator beam line. The monolith will be designed and built to high vacuum standards to ensure that the operation of the accelerator is not compromised, particulates being of major concern. Operating pressure will be 10-3 Pa. The vacuum for insulation will be an active vacuum that will handle both the cryostat vacuum and the piping adjacent to the system. This vacuum might be contaminated by H₂O, H₂ and He . Scope: The vacuum for insulation, piping, cryostat vacuum and vacuum for purging. Specification for support system, safety system, integration, installation and test. Proton beam window Moderator and reflector plug Target wheel Neutron beam extraction Target drive housing Neutron beam window ESS Vacuum Handbook for the monolith Coming soon: Feb 10, 2016

Sapphire window Sample LoKI – SANS Instrument Interface document for Instruments already in discussion, Standardization model in place. Second shutter 2 6 7.5 9.7 20.5 12.5 10.3 22.5 38 Chopper Pit 1 Chopper Pit 2 Chopper Collimators Monolith Sample positioning Detectors tank Window Target Gate valve at sample Gate valve Chopper Window Target Sapphire window Sample Gate valve Feb 10, 2016

Vacuum Laboratory Vacuum Integration Test Facility (VITF) Feb 10, 2016 This facility will provide the capability for seamless integration of all vacuum systems used on the accelerator, target and neutron instruments with the ICS (ESS Integrated Control System). This allows control logic to be developed and interlocks checked before implementation on the actual systems for which they are designed. EPICS control screens will also be developed together with data acquisition functions using this facility. The VITF comprises a vacuum vessel that with the installation of vacuum pumps, valves, gauging and any other vacuum equipment can be used to replicate any vacuum subsystem or system used in the accelerator, target or for neutron instruments. While the equipment will be physically different (in most cases smaller), it will operate in the same manner providing a vehicle for the development of the vacuum to ICS interface. Feb 10, 2016

Vacuum Laboratory Gauge Calibration Facility (GCF) The GCF will be used to confirm the operation and calibration of all vacuum gauges prior to installation with calibration performed against a secondary standard. All vacuum gauges installed on the accelerator, target and neutron instruments will use this facility. Gauge accuracy is important since gauge readings will be used for set point control and the interlocking and sequencing of the various vacuum system operations. Feb 10, 2016

Vacuum Laboratory Outgassing Test Facility (MTF) Feb 10, 2016 This facility is designed to support the selection and approval of materials for use in a vacuum environment in accordance with the requirements of the ESS Vacuum Design Handbook (VDH) where materials having vacuum compatible characteristics are listed. The majority of work conducted using this facility will be in support of neutron instrument design where materials used for the neutron filters in the guide tubes can pose specific vacuum issues due to outgassing and in some cases undesirable constituents resulting in the need for preconditioning prior to installation. The selection of vacuum compatible cabling, to minimize the contamination of vacuum spaces from the outgassing of hydrocarbons from plasticizers inherent in cable insulation, will be made using this facility. The selection process will also include a quality control aspect requiring the batch-to- batch monitoring of materials for potential changes as a result of the manufacturing process. Feb 10, 2016

Conclusion Vacuum group is responsible for the vacuum requirements of the machine, target and instruments, Vacuum Group responsible to over see all related aspect of the vacuum for ESS (including the in kind contributions), ESS Vacuum Handbook main point of interface, Interface all other subsystem to provide the vacuum signals and logic to the machine control system. Feb 10, 2016

Thank you! Tack!