LCLS-II Optics Release: 26FEB16. What’s new in this release? new cathode-to-L0 (“GUNB”) layout ˃input Twiss from Feng Zhou’s 100 pC beam updated cryomodule.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Update of RTML, Status of FNAL L-band and CLIC X-band BPM, Split SC Quadrupole Nikolay Solyak Fermilab (On behalf of RTML team) LCWS2010 / ILC 10, March.
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Elvin Harms, Tom Peterson, Yuriy Orlov, Frank McConoloque.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Critical Points Layouts For Storage Ring and Beamlines Ken Chow March 14, 2014.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
10/9/2014LCWS14 : Accelerator : ADI / M. Woodley1 / 14 Status of ILC Decks.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
Re-evaluating the Need for a anti-DID in SiD T. Markiewicz/SLAC SiD Optimization Meeting Updated
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Principals of fast injection and extraction R. Apsimon.
TAS-Q1 Status & what if exercise Etude [HL-LHC] TAS-Q1.
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
AP2-Debuncher Injection Area 2004 Shutdown Work August 2, 2004.
PRELIMINARY DESIGN OF NEW CONNECTION LINES: BSY TO A-LINE AND CU-LINAC TO SXR Y. Nosochkov April 1, 2015.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
LCLS-II Injector layout design and study Feng Zhou 8/19/2015.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
Two-beam module layout
CLIC Parameter Working Group Two Beam Module Design
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
2K Cold Box FDR Introduction
ILC-CR-0004 Main Linac extension: Implementation status
LCLS2sc MAD files: Injector to Bypass Line
Options and Recommendations for TL and Dumps
LCLS-II Lattice 26FEB16: updates in the areas from bypass to dump
Alternate Lattice for LCLS-II LTU Y
Beam-Based Feedback in LCLS-II
Update on the PSB Transfer Lines
26AUG16.
Transition Wakes in the 3.9 GHz Cryomodule
Strip-line Kicker R&D at KEK-ATF
HRS at small angles for e+/ e- pair for APEX
XFEL Collimation and Beam Switchyard Vacuum Issues
01SEP17.
Electron Source Configuration
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
ILC Cryogenics -- Technical Design Report Planning
CLIC damping rings working plan towards the CDR
Alignment of Main Linac Cryomodule (MLC)
CEPC-650MHz Cavity Cryomodule
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

LCLS-II Optics Release: 26FEB16

What’s new in this release? new cathode-to-L0 (“GUNB”) layout ˃input Twiss from Feng Zhou’s 100 pC beam updated cryomodule layouts ˃internal dimensions are now all “cold” ˃fixed support post locations now included (“CSPnn”) ˃longer 3.9 GHz cryomodules (~40 cm each), each with cold BPM ˃removed HOM absorbers at end of each linac (L0,L1,L2,L3) sextupoles included for 2nd-order dispersion correction ˃4 pairs (8 total), FFTB 1.38S3.00 style, presently deferred (level 1) ˃see Paul Emma’s presentation kickers and septa redefined as DRIFTs where they don’t deflect beam new BSY AREA names (from Rick Iverson and OPS) reassigned “ownership” of some areas for Oracle upload downstream systems … see Yuri Nosochkov’s presentation (March 2)

no change to optics

01OCT15 26FEB16 ~17 cm

the numbers in the green boxes go into the MAD deck

Notes Downstream gate valve face to HOM absorber center taken from 1.3 GHz cryomodule = mm Downstream gate valve face to Upstream gate valve face taken from 1.3 GHz cryomodule = mm

MAD model: standard 1.3 GHz cryomodule HOM from Joshua Kaluzny spreadsheet (2015_11_19) gate valve gate valve λ/ center post gate valve

MAD model: L SOL special mechanical interference stay-clear β end cap γ end cap 1287

MAD model: L gate valve gate valve 3λ/ δ end cap HOM GHz 3.9 GHz HOM GHz mechanical interference stay-clear differential pumping gate valve gate valve

standard (L1, L2, L3) standard (L1, L2, L3) MAD model: L1, L2, L mechanical interference stay-clear differential pumping λ end cap 1829 mechanical interference stay-clear differential pumping δ end cap MAD model: L2

vacuum break MAD model: L3 vacuum break MAD model: L3 special 1464 mechanical interference stay-clear differential pumping α end cap

DC bend BXSP1H BSYH beam line SLTH beam line CLTH beam line drift DBXSP1H kicker BKYSP0-4H septum BLXSPH SPD beam line SPH beam line drift DBKYSP0-4H drift DBLXSPH BPMSPH? BPMSPH

CLTH0 All devices in “split” beamlines (i.e. SPD1, SPD2) will be assigned the “parent” area name (i.e. SPD) in the Oracle database. Muon Shield Wooden Door LCLS-II BSY MAD deck beamline names

uploaded to Oracle from LCLS2sc … uploaded to Oracle from LCLS2cu … 01OCT15 26FEB16

Beam Stay Clear values to Oracle

! ============================================================================== ! Deferred devices ! ! see: ! %20Deferment%20Levels.xlsx ! ! Device TYPE attributes have been prefixed by a 2-character deferment ! indicator. If the first character of a device's TYPE attribute is not (or ! if a device has no defined TYPE attribute), the device is baseline. If the ! first character of a device's TYPE attribute is the device is deferred. ! The level of deferral is indicated by the second character of the TYPE ! attribute: ! ! : level 0 (required for CD4-Threshold with >100 pC/bunch and ! 50 kHz operation) ! : level 1 (required to approach CD4-Objective, but limited to ! ~100 pC/bunch) ! : level 2 (required to meet science objectives across parameter ! range) ! : level 3 (component to improve tuning time) ! : level 4 (space for future components that may be needed) ! : level 5 (probably not needed... leave space in beamline for ! future installation) ! ! The remaining characters of TYPE define the device's engineering type. ! Issue devices in CLTH and BSYA areas are new or changed for LCLS-II, but are not part of the project … how to indicate this in Oracle? ˃new defined Deferment level = -1 for “off project” devices? ˃new defined Deferment level = 9 for “off project” devices?

Other Issues precise definition and location of end caps and feed caps ˃dimensions with respect to fixed support post ˃cryomodule flange faces? beam pipe flange faces? integrate BSY beamlines (= AREAs) into MAD decks ˃“external” definitions mean that beamlines are defined in two places the latest release/upload had to be re-done twice, due to mistakes and unanticipated consequences … more automated testing required

Documentation out for review/approval being written