NCHRP 7-22 Planning & Preliminary Engineering Applications Guide for the HCM Kittelson & Associates 01/12/15 1 Status Report.

Slides:



Advertisements
Similar presentations
Tysons Corner Consolidated Transportation Impact Analyses (CTIAs)
Advertisements

1 Innovative Tools October 27, 2011 Chi Mai. 2 Presentation Overview VISSIM Corridors VISSIM Protocol Hours of Congestion.
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
Roundabout Level of Service and Delay and Comparison to Other Intersection Types Roundabout Level of Service and Delay and Comparison to Other Intersection.
Statewide Mobility Performance Measures Team Meeting Webinar June 17, 2013.
HSM: Celebrating 5 Years Together Brian Ray, PE Casey Bergh, PE.
The 2010 Highway Capacity Manual
HCM 2010 WORKSHOP PRAVEEN EDARA, PH.D., P.E., PTOE UNIVERSITY OF MISSOURI - COLUMBIA DAN SMITH, P.E. MISSOURI DEPARTMENT OF TRANSPORTATION.
Determining the Free-Flow Speeds in a Regional Travel Demand Model based on the Highway Capacity Manual Chao Wang Joseph Huegy Institute for Transportation.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
US 101 Corridor Mobility Master Plan Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1.
Byron Becnel LA DOTD June 16, Microscopic simulation models simulate the movement of individual vehicles on roads It is used to assess the traffic.
December 13, 2010 Developing Bicycle Performance Measures for Integrated Multi-Modal Corridor Management.
NCHRP Project : Evaluating the Performance of Corridors with Roundabouts Photo: Lee Rodegerdts.
Beyond Peak Hour Volume-to-Capacity: Developing Hours of Congestion Mike Mauch DKS Associates.
Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Oregon Pedestrian and Bicycle Safety Implementation Plan.
Highways & Transportation I (ECIV 4333) Course Outline 1 The Islamic University of Gaza Faculty of Engineering Highways & Transportation I (ECIV 4333)
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
October 6, :30 – 11:00. MPM Team Agenda Review of MPM program and team MAP-21 and other updates Mobility performance measures reporting On-going.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Planning and Preliminary Engineering Guide For Using the Highway Capacity Manual NCHRP 7-22 Workshop.
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
June 15, 2010 For the Missoula Metropolitan Planning Organization Travel Modeling
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
May 27, :00 – 11:45. MPM Team Agenda 1.Review of MPM program and team 2.MAP-21 and other updates 3. On-going activities 4. Outreach and upcoming.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Connectivity & Mobility
Case Study 1 Styner/Lauder Intersection Moscow, Idaho.
Presented at the 2015 ACEC- KY/FHWA/KYTC Partnering Conference Tom Creasey, PE, PhD September 9, 2015 Models: Keeping the Horse before the Cart.
Eastside Transit Alternatives Kick-Off Meeting Mesquite City Hall September 11, 2013 Kick-Off Meeting Mesquite City Hall September 11, 2013.
Transportation leadership you can trust. presented to TRB 11 th Conference on Transportation Planning Applications presented by Dan Goldfarb, P.E. Cambridge.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
Transportation Research Board Report Ray Derr.
Draft 2008 Congestion Management Process (CMP) Technical Report Andrew J. Meese COG/TPB Staff TPB Technical Committee June 6, 2008 Item # 8.
1 based on Federal Highway Administration Capability Maturity Model Workshops Transportation Systems Management and Operations (TSM&O) Performance Measurement.
Highway Capacity Manual. Highway Capacity Manual (HCM) Most widely referenced and best selling document of the Transportation Research Board HCM 2000:
Case Study 1 Problem 3 Styner/Lauder Intersection Moscow, Idaho.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
Summary of the WILMAPCO Congestion Management Process Prepared for T3 Webinar September 18, 2007.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Status Update on Developing Guidance for Travel Demand Modeling Office of Transportation Data and Analysis August 11, 2009 Mark Flinner, Traffic Forecast.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
NCHRP 7-22 Planning & Preliminary Eng. Applications Guide for the HCM Kittelson & Associates, ITRE, Mike Kyte, Stantec, Write Rhetoric 1 Full Committee.
HCM Analysis of Active Transportation and Demand Management Strategies Progress Report January 21, Dowling Associates Cambridge Systematics Rick.
Incorporating Truck Analysis Into the HCM - Proposed Truck LOS Model Rick Dowling Kittelson & Associates HCQS Presentation 1/12/14 1.
The New 2010 Highway Capacity Manual An Overview.
The HCM Update & NCHRP 7-22 – The Planning & Prelim. Eng. Applications Guide January 2014.
Dr. Roger Roess UPDATE January 11, 2015 Mode Definitions in the HCM.
ATDM Analytical Methods for Urban Streets Urban Streets Subcommittee Meeting January 10, 2016 David Hale.
Virginia House Bill 2 – Funding the Right Projects Intelligent Transportation System Activities May 19, 2016.
Regional Transportation Plan Draft Hybrid Scenario Transportation Policy Committee 7/22/03.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
L08: INCORPORATING RELIABILITY INTO THE HCM FREEWAY AND MULTILANE SUBCOMMITTEE JANUARY 22, 2012 Kittelson & Associates, Inc. Cambridge Systematics Dowling.
NCHRP Report 825 Planning & Prelim. Eng. Applications Guide to the HCM 1.
“Bringing Back-of-the-Envelope Back”
The New Highway Capacity Manual 6th Edition It’s Not Your Father’s HCM
“Bringing Back-of-the-Envelope Back”
HCM – Sixth Edition Introducing the Planning & Preliminary Engineering Applications Guide to the HCM Today’s web briefing introduces the Planning & Preliminary.
Planning & Preliminary Applications Guide to the HCM
“Bringing Back-of-the-Envelope Back”
HCM – Sixth Edition What’s New in the HCM Sixth Edition
School of Civil Engineering
SB 743 and New Models for Estimation of VMT
Presentation transcript:

NCHRP 7-22 Planning & Preliminary Engineering Applications Guide for the HCM Kittelson & Associates 01/12/15 1 Status Report

The NCHRP 7-22 Project Purpose: ◦ To develop a guide on the use of the HCM for planning and preliminary engineering applications by  identifying appropriate methods and applications, illustrating them with case studies. End Date ◦ June 3,

The People The Research Team ◦ Kittelson & Associates - Rick Dowling, Paul Ryus ◦ Bastian Schroeder, ITRE; Tom Creasey, Stantec ◦ Mike Kyte, Univ.of Idaho; Danica Rhoades, Write Rhetoric 3 The Panel Dirk Gross (Ohio) (Chair)Tyrone Scorsone (CSI) Robert Bryson (Milwaukee)Brian Dunn (Oregon ) Jessie Jones (Arkansas)Subrat Mahapatra (Maryland) Erik Ruehr (VRPA)Andrew Wolfe (SUNY) Doug McLeod (Florida)Jeremy Raw (FHWA)

The Process Literature Review, Critique HCM, Outline Get Stakeholder Input for Critique. ◦ (1 st round workshops) Interim Report 1 st Draft Guide to Panel and Stakeholders ◦ (2 nd round workshops) 2 nd Draft Guide to Panel and HCQS (Dec 2014) 3 rd And Last Draft Guide to Panel (March 2015) 4

The Guide Should Cover: 1.Appropriate use of HCM for a broad spectrum of planning and preliminary engineering applications (including different stages, different scales, and system performance monitoring); 2.Appropriate uses for different parts of the HCM (e.g., appropriate use of default values); 3.Use of the HCM in scenario planning; 4.Coordinated use of HCM with simulation models, travel demand forecasting models, mobile source emissions models, multimodal transportation analysis tools, and other tools; and 5.Use of the HCM in evaluating oversaturated conditions in a planning context. 5

The Guide Part I - Introduction ◦ Types of Analyses, Defaults, Serv. Vol Tables Part II – Mid-level Analyses ◦ Facility and intersection analyses ◦ Ped, bike, transit, truck Part III – High-level Analyses ◦ Corridors, regions Part IV – Case Studies, Example Apps. 6

Levels of Analysis 7

Focus of Guide 8

Part I – Intro to Guide Chapter 1 – Introduction Chapter 2 – Mid-Level (Facility) Analyses Chapter 3 – High-Level (Areawide) Analyses Chapter 4 – Working with Traffic Demand Data Chapter 5 – Predicting Intersection Control Chapter 6 – Default Values Chapter 7 – Service Volume Tables 9

Part II – Facility Analysis Chapter 8 – Freeway Analyses Chapter 9 – Multilane Highways Chapter 10 – Two lane Highways Chapter 11 – Urban Streets Chapter 12 – Signalized Intersections Chapter 13 – Stop Controlled Intersects Chapter 14 – Roundabout Intersections Chapter 15 – Peds, Bikes, and Transit Chapter 16 – Truck Level of Service 10

Part III – Area/Corridor Analyses Chapter 17 –Corridor Quick Estimation Screenline Analysis Chapter 18 – Areas and Systems 11

Case Studies Freeway Master Plan Impacts of BRT Project on Urban Street Long Range Regional Transportation Plan Analysis Roadway System Monitoring 12

70 mile long Interurban Freeway Case 1 – Freeway Master Plan 13

Case 1 Example Problems I.1 – Focusing the Study Screening for Service Volume Problems I.2 – Forecasting V/C Hot Spots I.3 – Estimation of Speed and Travel Time I.4 – Prediction of Unacceptable Auto LOS Spots I.5 – Estimation of Queues I.6 – Prediction of Reliability Problems 14

14 mile urban street BRT to take 2 thru lanes Case 2 – Urban Street BRT 15

Case 2 Example Problems II.1 – Screening Service Volume Problems II.2 – Screening for Auto Choke Points II.3 – Auto and BRT Speeds II.4 – Predicting Queue Hot Spots II.5 – Transit, Bicycle, Pedestrian LOS 16

Case 3 - LRTP 2040 Regional Transportation Plan - 6,000 square miles - 1 million population 17

Example Problems Example Problems that Develop Demand Model Inputs ◦ Example I.1 – Estimation of Free-Flow Speeds and Capacities ◦ Example I.2 – HCM Based Volume-Delay Functions Example Problems Post Processing Demand Model Outputs ◦ Example I.3 – Speeds for Air Quality & Noise Analysis ◦ Example I.4 – Screening for Auto V/C and LOS Hot Spots ◦ Example I.5 – Predicting Queues & Delay ◦ Example I.6 – Interpretation of Results ◦ Example I.7 – Prediction of Reliability ◦ Example I.8 – Transit, bicycle, and pedestrian LOS screening ◦ Example I.9 – Truck LOS screening 18

Case 4 – System Monitoring State produces annual report on state highway system performance. Over 12,000 center-line miles Three different monitoring station types ◦ Some collect AADT only (e.g. HPMS) ◦ Some collect hourly speed data (e.g. INRIX) ◦ Some collect simultaneous hourly spot speeds and volumes (loop detectors) 19

Case 4 – Example Problems IV.1 – Estimate Monitor Site Capacities & Free-Flow Speeds IV.2 – Estimate Monitoring Site Speeds from Volumes IV.3 – HCM Assisted QA/Quality Control IV.4 – Computation of Modal Performance Measures 20

Next Steps Get comments from HCQS by January 31. Produce third and final draft of Guide by March 5,

Comments/Suggestions Rick Dowling – Paul Ryus – Dirk Gross (Panel Chair) – (contact via Ray Derr) Ray Derr (NCHRP) – 22