2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

Newcastle Water Pollution Control Plant
Wastewater Management at an Animal Protein Rendering Facility J.B. Hess, W.A. Dozier, J. Spann and B. Thomas Poultry Science Department, Auburn University.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to American #2 Wastewater Treatment Plant.
Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
Module 1: Introduction to Wastewater Treatment
Wastewater Treatment City of London. What is Wastewater? Water used in our communities and businesses leaves as wastewater to be treated and returned.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Leswin D’cunha CH2M HILL Introduction to Wastewater Engineering Introduction to Engineering/Chabot College November 29, 2012.
15/01/2010 PREPARED BY : M. MERIH AYDIN BARIS TOR RANA OKUR GOZDE YILMAZ MODERN CARDBOARD CORPORATION.
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
The Quality Company - Worldwide SOUTH WEST WASTE MINIMISATION GROUP 3 RD JUNE 2009.
Surface Water Treatment Plant
Deborah Helstrom, P.E. Utilities Technical Review Water Supply Division Membrane Bioreactors Treatment Systems.
GALENA WASTEWATER TREATMENT UPGRADES Informational Presentation for the Sassafras River Association Presented by Ryan J. Rangel, PE April 23, 2015.
Wastewater Treatment & Collection System Improvements.
A Review of State-of-the-Practice Equipment at the Plum Creek WWTP By Tim Grotheer Plum Creek Wastewater Authority & Dave Oerke RTW Professional Engineers.
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Biosolids Treatment and Disposal
DOMESTIC WASTEWATER TREATMENT FACILITY. 1 st STAGE DIGESTER DISCHARGE DISINFECTION - Gas chlorination PRELIMINARY TREATMENT CLARIFIER AERATION BASIN COMPOSTING.
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
WASTEWATER TREATMENT IN LAHTI There are 2 wastewater treatment plants in Lahti - Kariniemi - Ali-Juhakkala In these slides we examine waste water treatment.
September 23, 2004 EVEREST Water Systems Inc. Solution Clear The is.
By Shantanu Mane Vaidehi Dharkar Viral Shah
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Moving Bed Biofilm Reactor Retrofit for Ammonia and Nitrate Removal
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
Phosphorus Removal in a Membrane Reactor System— A Demonstration Study Wayne Lorenz, P.E. and Matthew J. Gavin Wright Water Engineers, Inc. and Newell.
Biological Aerated Filtration (BAF) at the Denver Water Recycling Plant 2006 Water Reuse Workshop Golden, CO Russell Plakke, Denver Water.
July 2013 TECHNICAL DIRECTOR ENVIRONMENTAL APPLICATIONS OF ACCELERATORS INDUSTRY CHALLENGES – SLUDGE TREATMENT MARTIN JOLLY.
Water Treatment Chapter 11. Sewage Treatment Rationale More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement.
Waste Water Treatment Plant. HOW DO TREATMENT PLANTS PROTECT OUR WATER? Wastewater treatment plants: Remove solids, everything from rags and plastics.
Sewage Treatment.
Wastewater Treatment.
Deborah Helstrom, P.E. Industrial Permits Team Wastewater Permitting Section Membrane Bioreactors Treatment.
Stormwater Compliance Training South County Regional Wastewater Authority July 2015 Jack Rosenburg CH2M / Oakland.
Wastewater – Its Journey to Treatment and Return to the Environment.
Waste Treatment Waste is a general problem in chemical plant operation especially in the developing country where the rules and regulations are very strict.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
1 Wastewater Treatment Processes Jae K. Park, Professor University of Wisconsin-Madison.
Presentation by Chelsea Smith March 11, My Background Southern Wells (K-12) Graduated in 2010 Ball State University ( ) BS in Environmental.
COMPARISON OF MBBR AND Suspended growth BNR Performance at the HRWTF
Sludge Thickening and Dewatering Bob Dabkowski Katy Craig
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Wastewater Treatment. Dangers of Not Treating Wastewater-Waterborne Disease Cholera Typhoid Fever Hepatitis Amoebic Dysentery Giardiasis E.Coli 0157:H7.
Nikenbah WWTP Wide Bay Water Corporation’s experience to date in the operation of a 4.8ML/day Flat Plate Membrane Plant.
WASTE WATER TREATMENT.
Welcome to American-Bath Wastewater Treatment Plant.
Conventional Sewage Treatment Plants:
5th Annual Water and Sanitation Workshop
BNWRP Biosolids Presentation
Modified Ludzack-Ettinger Wastewater Plant
Preliminary Treatment Removing Large Solids Material by Raking & Screening REMOVES 1.
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Wastewater Treatment Dr.Gulve R.M..
Victor Valley Water Reclamation Authority Biogas to Energy Project with Omnivore™ Digester Demonstration May 30th, 2013.
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Wastewater Facilities Upgrade Project
Pollution Control in the City of Windsor Wastewater & CSO Management 2013 Status & Update The 7th Biennial Meeting of the Lake Erie Millennium Network.
A Tale of Two Plants: How Combining WWTP and WTP Improvements in Reidsville is Setting the Stage for the Future Kevin Irby, P.E. Kevin Eason, P.E
SBSA.
________________________________________________________________
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Presentation transcript:

2011 WCW Conference

Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment Rasel Hossain Associated Engineering – Program Director Herb Khuene Pat Given Major Contractors Bird Construction Company Schendel Mechanical Contracting Ltd. ACI Architecture Inc Key Project Partners

Fort McMurray Wastewater Treatment Plant

Effluent Standards PHASE 1PHASE 2 Total Phosphorus < 1.0 mg/L < 0.5 mg/L Ammonia (NH­ 3 -N) < 5 mg/L (summer) < 3 mg/L (summer) Ammonia (NH­ 3 -N) < 10 mg/L (winter) < 10 mg/L (winter) Winter Period Oct 1 - Jun 30 Total Suspended Solids (TSS) < 20 mg/L cBOD 5 < 20 mg/L E-coli < 200 CFU per 100 mL pH6.5 – 9.5 WCW 2011 Sapphire Sponsor Main Title of Slide

Pre-Design Summer 2004 Design 2004 – 2005 Tender Summer 2005 Award to Bird Construction Winter 2006 Construction 2006 – 2010 Fall 2009 – Partial flow Spring 2010 – Full flow 2011 – Final deficiencies and extra work Project Delivery

Staff Hiring 2005 to present Operator Training - Process Major Processes BNR, Composting 2007 thru 2010 Operator Training - Equipment Introduction to Equipment – 2008 thru 2010 Training during construction – 2008 thru 2010 Training with partial flow through plant Training with full flow and automated processes Operations Training and Start-up

Stage 1 Ensure Manufacturers are communicating to Contractor – Forms 100 & 101 Stage 2 Ensure Installation of Equipment is Correct – Form 102 Up to “bump rotation of equipment” Operations staff receive initial Equipment Training programs Stage 3 Wet testing of Equipment – Form 103 Testing to ensure the equipment performs according to spec in water Operations staff receive Equipment Training programs from Manufacturers Construction Contract Commissioning Phases (Normally)

Stage 4 14 day Performance Testing to ensure the fully automated process performs according to design Operations staff running unit processes under direction from Engineering Team Stage 5 Operations staff running entire facility with “assistance” from Engineering Team Long Term Optimization begins Construction Contract Commissioning Phases (Normally)

Reality in Fort McMurray Winter approaching in late 2009 Facility not ready for introduction of flow and operation with all equipment complete and computer system in “auto” Decision made to allow partial flow and run liquid train only in “manual”, covering floor slabs and saving the cost of another winter of tarping and heating all outdoor floor slabs. Stage 3a Running the plant with partial flow 3 – 10 ML/d through the winter Control systems in “manual” with the exception of Raw Sewage Pumping in auto with “callout alarms”. Operations staff implement daily checks with assistance of Engineering group to ensure the processes are moving water and collecting sludges in Gravity Thickener. Construction Contract Commissioning Phases

Sludge removed was hauled to Aerated Lagoons

Winter Start-up of Bioreactor

Winter Start-up of Secondary Clarifiers

Design Features of Secondary Clarifiers

Design Features of Bioreactor

Daily Rounds in Manual Operation

Liquid Train Stage 3 – Spring thru summer 2010 Influent Screening Grit Removal Primary Scum Removal and Scum Screening Hauled Waste Station Influent Pumping Primary Clarifier and Sludge Pumping Bioreactors, Aeration Systems, Process Blowers Secondary Clarifiers and Return Sludge Pumping UV Disinfection Final Effluent Utility Water system with Sodium Hypochlorite pumps HVAC systems including air conditioning using Treated Effluent Heat Pump Admin Building with offices, laboratory, staff facilities and workshop Construction Contract Commissioning Phases

Automated SRT Control

Primary Clarifier Scum Drum Thickener

Solids Train Stage 3 – Spring thru Fall 2010 Waste Activated Sludge Pumping and DAF Thickening Primary Sludge Fermenters, Macerator and Pumps Centrifuge Dewatering and sludge conveyors Polymer System for Centrifuge and DAF Sludge Mixing and Indoor Tunnel Composting Process Foul Air Collection, Ammonia Scrubber with Sulphuric Acid system Foul Air Blowers and Biofilter ChemScan Nutrient Analyzer and Alum System Instrumentation, Electrical, Gas Detection systems Stand-by Diesel (2011) Construction Contract Commissioning Phases

Sludge Control and Information Package

Effluent Quality