Team Lit Week 15 Deliverables: Prototype Final Review Justin Ballenger Brian Barker Greg Hahn Chow He Jon Klopf Vi-Vi Nguyen.

Slides:



Advertisements
Similar presentations
Holiday Lighting Tips Compliments of Outdoor-Christmas-Decorations.net.
Advertisements

Electricity Investigation 2 Review.
Schematics On or off Batteries Series or Parallel Volts and Amps FJ
Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
GROUP 9: SENIOR DESIGN DEANNA MCKENZIE MICHAEL D. BROWN WILLIAM THORNTON Gunnery Control Handle 1.
Northwest Natural 12” Pipeline Integrity Project Team Members Jon Ziring Zack Lemmon Long Nguyen Academic Advisor Faryar Etesami NWN Sponsor Advisors Ross.
Justin Akerman (CE) Chris Hoerbelt (ME) Hersh Anand (EE) Anthony Poli (ME) Greg Mucks (ME) Jon Notaro (EE) Eric Tripp (EE) Customer: Stan Rickel.
Team Members Industry Contact Academic Advisor Dr. Faryar Etesami.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
12/15/09. Light Bulbs are Being Used in Homes During Daylight Hours While Sunlight is “Wasted” On the Floor An Economical, User Friendly Way to Use This.
Final Presentation Team Crutch. Agenda Process – Justin Vision Document Issues Use Case Diagram Domain Diagram SIG Prototype Why Team Crutch?
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Starting a “Cold Fire ” Start to Finish: The Creation of an Entire Computer from Motorola’s Cold Fire Processor Pyrotechnicians : Drew Larson Randy Jedlicka.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Michael Hogan Jon McHale.  Problem Statement ◦ Develop a handheld device, that with minimal specialized training, can be used to quickly record EEG signals.
WildStamm Device Overview Pat Maloney Zack Bowen Brian Hermano Ken Ragen Vance Feavel.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Team Lit Week 4 Deliverables: Conceptual Designs Justin Ballenger Brian Barker Greg Hahn Chow He Jon Klopf Vi-Vi Nguyen.
The Great Team1 Week 6 : Midterm Presentation Bunk Bed Converter Adam Brown Blaine Gardner Sarah Gleaton Jimmy Jiang Addisu Lemlem Lee Tschaepe 6/21/2006.
How Does Electricity Flow? Electricity & Magnetism Science Instructor: Miss Aartman.
Smart Material Museum Exhibit Spring Design Review #2 Senior Design Group 13 Glen Ashworth Daniel Roque Isaac Piersall Laura Wainikainen.
ENGINEERING TEAM PROJECT Group 52 SAFETY LIGHT JACKET.
Eye Detector Project Midterm Review John Robertson Roy Nguyen.
Status Report #7 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 03/23/2011.
Rebecca Hall Accessed on 26 th March 2013 at : /
Lesson 8 Electromagnet. We know that all magnets have two ends, usually marked "north" and“south,“ And that magnets attract things made of steel or iron.
Is this a series circuit or a parallel circuit?
Technovation Lesson: Effective Presentations Week 10.
Wegmans Bread Tray Lift Assist By Brendan Moran,Greg Feather Alex Phillips and Andrew Beasten.
Team Lit Week 2 Deliverables: Project Bids Justin Ballenger Brian Barker Greg Hahn Chow He Jon Klopf Vi-vi Nguyen.
Science Electricity: Lesson 8: How a Bulb Works Day 1.
Status Report #6 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 02/28/2011.
AMSTI Circuits Lesson 14. Overview Semiconductor diode = allows electricity to flow in one direction Examples: battery chargers, radios, computers, and.
Half term 2 week 2. Discuss the website as a class Reflect on your thoughts and the discussion for 1 minute in silence. Finish with your house prayer.
Trap Components Pheromone secured With paperclip
Design Process TED 105 Fall Define the Problem (ask) Clearly state the problem –Problem statement –Needs assessment –Design criteria & goals.
The Cap’n Travis Estes Steve Swearingen George Threadgill Andrew Riley.
Team Lit Week 9 Deliverables: Layout Drawings Justin Ballenger Brian Barker Greg Hahn Chow He Jon Klopf Vi-Vi Nguyen.
How to install an Xbox 360 By Michael Trim. Step 1 Position the Xbox where desired and then insert the ‘HDMI Cable/ Component Cable’ into the back of.
CS-EE 481 Spring February 2006 University of Portland School of Engineering Project Umpqua Electric Vehicle Drive System Team Abdullah Binsaeed Dustin.
Part 2 of the Agenda: 5 E and C-E-R-R Investigations with batteries, bulbs, wires, and switches.
Dance Pad Project By: David Dorsten. Understand  Electric Engineering Project = Dance Pad and Light Bulb Station  This activity will demonstrate the.
Ch. 24: Electric Current and Circuits Vocabulary: electrical energy, electric current, circuit, closed circuit, conductor, closed circuit.
E-NABLE Hand Test Rig P16061 David Schwartz, Tia Parks, Shannon Barry, Samantha Mason, Charles Rumfola.
Power. P = work/time (J/s) or (Watt) P = I * V The “Power” company charges you by the Kilowatt Hour or Kwhr. What unit are they really charging?
By: Justin Elnicky, Stephanie Martella, Brian Nielson, Derek Rascon
EE/CS 481 Spring February, 2008 University of Portland School of Engineering Project Surf Scoter Electronic Ballast for a Fluorescent Lamp Team McGuire,
Half term 2 week 5. christmas-mean-to-you/canon-jim-rosenthal What does this video clip mean? What does the video.
Current Electricity Part 1. Word Bank D-cell Word Bank D-cell – a source of electricity.
Today’s Agenda What is user experience? User experience deliverables Project.
Dance Floor Project By: Ross King and Kyle Greulach.
Comes from Latin word that means, “to go around.” A circuit is a path provided to allow electrons to flow. A circuit allows the energy from a power.
Welcome to... A Game of X’s and O’s
Team Lit Week 5 Deliverables: Patent/Product Search Justin Ballenger Brian Barker Greg Hahn Chow He Jon Klopf Vi-Vi Nguyen.
 A multimeter is tool that measures electrical currents. It is a combination of many different measurements in one tool.
ATLAS 1 Beam Pipe Support SCT TRT Side CSide A Services and Beampipe Support Frame Services and Beampipe Support Frame Pixel Detector Composite support.
WEB 237 Week 5 Learning Team Finalized Paper Only Submit the eCommerce analysis paper and prototype Check this A+ tutorial guideline at
Ch.14- Test 1 (2nd 9 wks) Review
' d' :- '" L I _ I r 1.
Gunnery Control Handle
Complete or Incomplete?
P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016
Natural Sciences and Technology Grade 6
A Mobile Guide to California's High Desert
Kevin O’Neal & Jeff Black METBD 111 FINAL PROJECT
Electrons in Circuits. Electrons in Circuits Parts of a circuit Battery Closed switch (allows electrons to flow) Open switch (impedes flow) Wire Resistor.
Assembling/Dismanteling Method of the Socket
Circuits.
Name: _______________________
The Design Process.
Presentation transcript:

Team Lit Week 15 Deliverables: Prototype Final Review Justin Ballenger Brian Barker Greg Hahn Chow He Jon Klopf Vi-Vi Nguyen

Agenda Overall Agenda: –Problem Statement To completely redesign the fluorescent light bulb, sockets, and housing in order to create an affordable, user friendly device for changing 4 ft. fluorescent light bulbs Week Agenda: –Prototype Review Continue prototyping and fabrication

Prototype Finished grabber

Prototype Top view of grabber showing spring placement

Prototype Finished prototype of extending grabber

Prototype Final prototype of device extended

Prototype Final prototype of device holding final prototype of bulb

Prototype Elongating slotted piece to adapt the housing

Prototype Assembly of clips, housing connection, and elongation piece

Prototype Assembled end of housing bottom

Agenda for Final Presentation Assembled housing Wire up housing Working bulb

Questions