Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Managing the Information Technology Resource Jerry N. Luftman
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Auger Project Management H. Glass Director’s Review15-Dec-2011 Fermilab (Technical Division) has hosted Auger Project Management office since collaboration.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
CERN LBNE Test Experiment. Plan view of Bat
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Produced by: Operations Turnaround Leadership and Integrated Turnaround Planning A. Bobby Singh, President Project Assurance, Houston, Texas.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Telescope Integration and Tests Tuesday Afternoon.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Status Update Outline  General remarks - reminder  Progress since last Annual Meeting – June 2010  Next steps - timeline EUROnu Costing Ilias Efthymiopoulos.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
VLCW July Global Design Effort1 Installation Global System Review F. Asiri W. Bialowons, T. Shidara Acknowledgment: C. Hauviller, R. Sugahara C.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
EGEE NA3 Status Prof. Malcolm Atkinson Director John Murison Training Manager CERN 14 th January 2004.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
K.Gadow CALICE technical review 1 Move to FNL ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3/B4.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Linda Bagby - SBN Program Electrical Coordinator ICARUS Electronics Meeting 27 January 2016 SBN Program Operational Readiness Clearance.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Installation of the T600 at Fermilab CSN2, September 22,
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Template for DUSEL Meeting with Potential Experiments.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
O. Kester, NuSTAR annual meeting, 27/02/2013
WBS Experiment Infrastructure: Design Status Discussion Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 6/17/11.
Challenges to get LBNF ready for Far Detector installation ASAP Elaine McCluskey ELBNF Proto-Collaboration Meeting 22 Jan 2015.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
T600 Detector FNAL Fernanda G. Garcia Fermi National Accelerator Laboratory.
Warm Vessel Leveling Islands (Piers)
Installation of the T600 at Fermilab
SBN Far Detector Installation & Integration
News about the WA104 Programme
SBN Far Detector integration model overview
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
News and brief overview of Beamline plans for the next few months
Warm Vessel South Wall Installation, Sub-assembly Option
Far Detector Activities Late 2017 – Early 2018
Preliminary Project Execution Plan
Presentation transcript:

Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration

SBN 12/16/201A. Stefanik | SBN Director's Review Dec

SBN The SBN Far Detector Installation and Integration (SBN FD I&I) work package aims to develop and implement the plan for installation and integration of the ICARUS detector at FNAL over the next two years and be ready for beam data taking in CY2017 The recently formed SBN FD I&I team has been active getting information and establishing the strategy –Level 2 manager took up her post in Nov 2015 Visited CERN and met CERN and INFN collaborators –Experienced skill personnel identified - Nov 2015 –Majority of the team is not at full-time capacity on the project Nevertheless the group is motivated and committed to the task Team and leader are held accountable for results, not for efforts Far Detector Installation & Integration Overview 12/16/201A. Stefanik | SBN Director's Review Dec

SBN The SBN far detector installation and integration work package scope includes the following major points: –Assembly of one warm cryostat –Installation of T600 detector (more later on this presentation) –Overseeing / joint coordination of cryogenic system installation assembly and testing cooperation between CERN and FNAL –T600 commissioning & cool-down –Detector support systems readout support requirements grounding requirements (more later on this presentation) –Installation of cosmic ray tracker (Detector breakout session 2) –Installation of overburden (Facility Infrastructure breakout session 1) Firm up the high-level integration between the different subsystems is key to maintain schedule Far Detector Installation & Integration Scope 12/16/201A. Stefanik | SBN Director's Review Dec

SBN WBS 40 SBN/4.1.1 – FD Installation and Integration –Identify a responsible manager for each subsystem  –Develop a schedule Provisional schedule in progress  “Living document” as our understanding matures –Identify budget needs First top-down (presented in this review)  Updating to a bottom-up approach --> system managers define their budget in agreement with project leader –Account for dependences on or links with other subsystems, schedule and budget Level of granularity will depend on complexity of task –Define the type and number of documents required for the project –Define management and communication structure Weekly meetings with managers  Increase personnel recruitment in the next months Structuring the SBN Far Detector I&I task 12/16/201A. Stefanik | SBN Director's Review Dec

SBN 12/16/201A. Stefanik | SBN Director's Review Dec SBN FD Enclosure Construction 2Q Q Q Q Q Q Q Q Q Q 2016 Ship Overburden Ship Warm Vessel Parts Ship Two Cold Vessels with ICARUS Detectors Assemble Warm Vessel in FD Building Install Warm Vessel Insulation (Vendor) Install Two Cold Vessels into Warm Vessel Install Cryogenics Install Detector Readout Systems Install CRT, integrated with Warm Vessel – details TBD Far Detector Installation Timeline – Provisional Plan

SBN Resources 12/16/201A. Stefanik | SBN Director's Review Dec Input and advise from CERN and INFN colleagues are imperative throughout this process WBS Fernanda G. Garcia WBS 4 Cat James Mechanical Support - Andy Stefanik Justin Tilman, John Voirin Jim Kilmer Electrical Support - Linda Bagby Bagda Baiboussinov Cryogenic - Mike Geynisman Mike Zuckerbrot Alignment - Babatunde OShinowo CRT - Bob Wilson David Warner

SBN Active communication and close cooperation with CERN and INFN colleagues –Active communication about the planning process is helpful for maintaining consensus and keep the collaboration informed about the installation status –We will seek advice on alternatives to consider during the planning process –With the initial SBN FD I&I team in place, we can cultivate the cooperation and communication with CERN/INFN colleagues that will be essential for a successful installation We will rely on Claudio Montanari (ICARUS Technical Coordinator) and Marzio Nessi (CERN Head of Neutrino Platform) for our primary point of contact and anticipate a close collaboration with the entire team Cooperation among institutions 12/16/201A. Stefanik | SBN Director's Review Dec

SBN 12/16/201A. Stefanik | SBN Director's Review Dec Current thoughts on Detector Grounding (work by Linda Bagby) Installation of the T300 modules (work by Andy Stefanik et.al.)

SBN SBN Far Detector – Detector Grounding 12/16/201A. Stefanik | SBN Director's Review Dec Maintain separate detector and building grounds is vital to the success of the experiment Isolate the detector from all other electrical systems Minimize ground loops Initial ground plan requirements are specified in SBN docdb #589 Authored by SBN Program Electrical Coordinator Linda Bagby A measurement of the resistance-to-ground will be provided by the contractor as a deliverable after beneficial occupancy To achieve desirable sensitivity of the detector a < 1 ohm specification is required Two separate ground structures are required: one for the detector and one for the detector building –The detector building ground structure is to be composed of rebar imbedded in the concrete –Copper tie points, connected to the rebar, will run along the walls of the detector building

SBN The current installation proposal plan is based on the following: Each unfilled T300 detector weights 52 metric tons (57 US short tons). There are two building cranes; each crane has a capacity of 27.2 metric tons (30 US short tons). We assume we will need a lifting fixture. Fermilab personnel will install the T300s if no rigging contractors are required. We have two other possibilities that depend on the equipment that Fermilab owns: Use a rigging contractor for specific tasks. Use a rigging contractor for the entire installation task. We will work with Fermilab rigging and safety personnel as the installation plan develops. We have already started discussions with rigging personnel. Installation will be in accordance with Fermilab Standards. Installation of the two T300 cold detectors 12/16/201A. Stefanik | SBN Director's Review Dec

SBN Standard trailer Installation of the two T300 cold detectors 12/16/201A. Stefanik | SBN Director's Review Dec Loading dock extension We have removable panels in the building wall to bring in each T m (36”) clearance between the hook and the top of the T300. What if 0.9 m (36”) clearance between the hook and the top of the T300 is not enough?

SBN Low-boy trailer: Not an option to increase the lifting clearance between the crane hook and the T300. Installation of the two T300 cold detectors 12/16/201A. Stefanik | SBN Director's Review Dec

SBN Use rigging contractor to lift the T300 off the truck and to place it on track rollers so it can be rolled into the building. Fermilab personnel does the rest of the installation work. Installation of the two T300 cold detectors 12/16/201A. Stefanik | SBN Director's Review Dec m (90”) clearance between the hook and the top of the T300.

SBN ICARUS lifting fixture. T300 Lifting Fixture 12/16/201A. Stefanik | SBN Director's Review Dec

SBN T300 Installation Route 12/16/201A. Stefanik | SBN Director's Review Dec #1 #2

SBN Obtain information for all components of the T600 Detector that we need to install: 3D models and drawings in a workable electronic format. Weights, especially the T300 because the T300 sets building carne capacity. Lift points, especially the T300 because we need a special fixture to lift it and the weight of the lifting fixture adds to the load on the crane. The T300 and its fixture set building crane hook height. Will CERN provide the T300 lifting fixture? Will CERN provide lifting and assembly fixtures for all of the other components? Support points under the T300 so we know where to place rollers in case we must roll the T300 into the building on rollers and bar track. Installation of the two T300 cold detectors 12/16/201A. Stefanik | SBN Director's Review Dec

SBN CERN provides one crane but the second crane is not funded yet. If we do not have the second building crane then we must hire a rigging contractor to install the T300s and hire them again to remove the T300s when the experiment is decommissioned. We need to learn if we will have the second building crane or not so we can start the process of issuing an RFQ for a rigging contractor. We are looking for a building crane on the Fermilab site that will fit in the Far Detector Building and that we can borrow for installation and removal of the T300s. Potential problems with our current installation plan 12/16/201A. Stefanik | SBN Director's Review Dec

SBN We currently have three skylights in the building roof to facilitate installation in the event we have only one building crane. Potential problems with our current installation plan 12/16/201A. Stefanik | SBN Director's Review Dec

SBN SBN Far Detector installation and integration plans have started –Team recently formed to develop the plan Personnel will increase as we continue working on this –Preliminary structure on management and communication is in place –Provisional schedule exists Accumulating and updating information on tasks, schedule, and manpower as the team learn more about installation –Effort focus on the most urgent needs Ongoing development of a plan for T600 detector installation Preliminary thoughts on detector grounding Conclusions 12/16/201A. Stefanik | SBN Director's Review Dec