EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.

Slides:



Advertisements
Similar presentations
Recording Narration to a PP presentation For an unattended PP, recorded narration may be added to replace a presenter Be careful-poor narration is worse.
Advertisements

Object Linking and Embedding Objective 6.02 Linking and Embedding.
11 This document contains DRS Technologies proprietary information. Copyright © 2012 DRS Technologies, Inc. All rights reserved. Halvorsen Parts Order.
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
© Wiley Inc All Rights Reserved. MCSE: Windows Server 2003 Active Directory Planning, Implementation, and Maintenance Study Guide, Second Edition.
Learning the features. *Right Click Collections. *Choose Create New Collection *Name the Project.
System Analysis (Part 3) System Control and Review System Maintenance.
May 7, We manage documents and their changes with versioning and check out/check in procedures.
Version Control with SVN Images from TortoiseSVN documentation
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Copyright © 2006 by The McGraw-Hill Companies,
Copyright © 2004 VMware, Inc. All rights reserved. Utility Portal Overview.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST5 Training Alternate Assemblies.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. Example 1-Ad A.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama BRIC-17 TIR Overview Aug 28, 2012 Tony Cox EO20.
Introduction to Payload Planning Will Kirby (256)
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
A. Maillet, POIWG#25, Feb 3-5, Inc Experiments supported by CADMOS and using the EPM Alain MAILLET CADMOS
1 Increment 1 Lessons Learned Many things are not happening as predicted. Major differences are: –Scheduling and stowage –Turnaround times for troubleshooting.
July 26, 2005 Nelda Allen/Colsa1 Configuration Management Process 2 Minor Changes (pages 2 & 5)
EO10-PPO-044 Revision G 9/21/15 PARC/T. Cassady Body Measures 1:15 BODYM-NODE2-VID R5 :15 1:25 Crew Unattended :30 P/L-RSTRCT VID-CNFG TEXTFlexible :05.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory First Contact Package for KSC Payloads #3 of 5 June 5, 2013 Getting.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Cell Bio Tech Demo TIR Overview Aug 28, 2012.
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
EO10-PPO-118 parcall /2/15 PARC/M.Cash MOON IMAGERY 0:10 Crew Commanding Time Critical Unattended Additional Activities TEXT FLEXIBLE MOON-CAMERA-FOCUS.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
Revision G 8/22/13 PARC/T. Cassady Pro K  FD15 (+/- 5 days), FD30 (+/- 14 days), FD60 (+/- 14 days), FD120 (+/- 14 days), and FD180/R-14 (+14/-0 days)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kevin Kasperitis EO10 (256) OC.
February 14, 2013 POIWG Technical Overview CR / HM-3430 Ku Forward Capability.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
PARC/D. Westbrook EO10-PPO-099 Revision I 10/24/14 MSL-MICAST-EVAC CMD: 0/05:00 MSL-MICAST-HEAT1 CMD: 0/02:00 MSL-MICAST-HEAT2 CMD: 0/04:00 MSL-MCS212-EQUIL.
Revision A 12/19/12 PARC/T. Cassady Spinal Ultrasound SPINAL-S/W-REV_OPR SPINAL-CREW-CONF_OPR Operator Software Review and Crew Conference Ops before Spinal.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
Lisa Prendergast EO20/ Operations Lead January
EO10-PPO-020 OCR emcs /15/14 PARC/C. Traylor Crew Additional Activities Unattended EMCS Facility Cleanup Post Gravi-2 Ops EMCS-GASRMV MOD-RPL :20.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
Payload Operations and Integration Center MSFC Daily Summary for PDs.
SFU Samples Run (Sample Number) A (1) G1 Video C (1) B (2) C (2) B (3) C (3) B (4) C (4) B (5) C (5) B (6) C (6) B (7) C (7) BCAT-C1 Simon Fraser University.
Glacier PARC/D. Rigsby EO10-PPO-094 Revision I 3/3/15 Hardware Ground Powerup 1 1.Scheduled by OCR. 16:00 GLACIER#-DNLK-CMD GLACIER#-HW-DRY GLACIER#-HW-PWR.
Revision C 12/19/12 PARC/E. Litkenhous Crew Unattended Ground Additional Activities TEXT Flexible Nanoracks On-Orbit Operations Platform-X Install & Activate.
PARC/D. Westbrook Revision B 10/23/13 SODI Procedure Review SODI-PROC-REVIEW :30 A Crew Additional Activities TEXT Flexible.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.
Multi-Droplet Combustion Apparatus (MDCA) Training Strategy Team #1 P T A E A E S T I S A N O I T A N R T O N L I N C D O P E R A O Y L A P A T I O N S.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
POD Team PARC/M. Barnett EO10-PPO-079 Revision F 8/10/15 Payload Crew Conference :30 PAYLOAD-CREW-CONF (at least twice per increment, monthly preferred)
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
File Uplinks Through the Payload MDM POIWG Session 15 Tuesday, September 9, 2003, 3:15 to 3:35 David Deitsch, CPO Command and Data Systems Team MSFC Flight.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Initial MELFI Facility.
Revision E 12/19/12 PARC/E. Litkenhous JAXA-SDRM WGVOPN-PLC PRO-SDRM ACT-CMD 1:00 SpaceDRUMS Experiment Operations SDRM-EXP-POWER UP Nominal Operations.
I&T&C Organization Chart
(Business Professional)
(B.P :51) ( B:P52 ).
Uploading Data in the Staff Interchange
Approve Documents (Requisitions) in Owl Link
Multi-Disk Install Steps for Unicenter NSM r11 Ingres
Draft Recommendation Overview
Batch Parties Changes.
Update on LIBSIP and TTCN-3.org
Update on LIBSIP and TTCN-3.org
Portable Biotechnology
Integration & Test Instrument Operations Coordination
Forms.
Presentation transcript:

EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within 18 months after last session). PPFS-BP MIC-REPLACE

EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :25 :10 1:00:25:50:25 PPFS-PD SPCLST-CNSLT :10 :50 PPFS-S/U LAB-VIDEO :25 PPFS-CAL LAB-VIDEO :15:20 PPFS-UOP1-TRACK Maintenance Calibration Crew Commanding Unattended  Sessions required once every 3 years (within 3 years after last session).  Following each session, a minimum of 5 days is required before next use of Portable PFS, to allow PD time to create updated calibration files for uplink. PRO-PLMDM FILE-CMDPPFS-H/W-SETUP/PWRUP PPFS-H/W-PWRDN/STOW PPFS-DATA DNLK-CMDPPFS-VOLUME-CAL PRO-PPFS ACT-CMD PRO-PPFS DACT-CMD PPFS-MPP CAL-CMDPPFS-CAL-VIDEO S/UPPFS-MAINT-CMD > :15 PPFS warm up

EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :15 TFM Insert Removal TEXTFlexible Crew  Sessions required as needed (due to hardware anomaly, applicable increment OCR). PPFS-TFM INS-REMOVE

EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO Baseline27/28 & Subs 4/1/11--- EO10-PPO Revision A29/30 & Subs 6/23/11Nominal: 1.83 Reserve: 0.00 Inc 29/30 Working PTP 4/22/11 Nominal: 1.75 Reserve: 0.00 Nominal: - Portable PFS Maintenance Calibration (before end of Dec 2011). - Crew time for payload-specific use of Portable PFS is included in the PPO of the payload using the system. Reserve: - N/A EO10-PPO Revision B31/32 & Subs 12/8/11--Crew time for payload-specific use of Portable PFS is included in the PPO of the payload using the system. EO10-PPO Revision C33/34 & Subs 6/28/12Nominal: 0.33 Reserve: 0.00 Inc 33/34 Working PTP 5/11/12 Nominal: 0.00 Reserve: 0.00 Nominal: - BP Microphone Replacement (0.33 hrs/session): 1 session (before 10/22/2012). - Crew time for payload-specific use of Portable PFS is included in the PPO of the payload using the system. Reserve: - N/A EO10-PPO Revision D33/34 & Subs 8/30/12--Video resources modeled in separate unattended(s). No change to crew roll-up from last revision. EO10-PPO Revision E35/36 & Subs 12/19/12--Crew time for payload-specific use of Portable PFS is included in the PPO of the payload using the system. EO10-PPO Revision F37/38 & Subs 6/13/13--Ops: - Portable PFS Maintenance (periodically as required). Nominal: - N/A Reserve: - N/A PPO Change Log *Crew Roll-up is not maintained real-time.

EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS Change#RevisionIncDateCrew Roll-up* (hrs) PTP (hrs) Notes EO10-PPO Revision G39/40 & Subs 12/12/13Nominal: 0.00 Reserve: 1.75 Inc 39/40 Working PTP 10/21/13 Nominal: 0.00 Reserve: 2.08 Ops: - Portable PFS Maintenance (periodically as required). Nominal: - N/A Reserve: - Portable PFS Maintenance Calibration (1.75 hrs/session): 1 session (before Nov 2014). EO10-PPO Revision H39/40 & Subs 8/18/14--Added PPO document number to reflect new EO10 OPR Configuration Control Plan for PPOs. EO10-PPO Revision I41/42 & Subs 9/24/14Nominal: 0.00 Reserve: 0.00 Inc 41/42 Working PTP 8/27/14 Nominal: 0.33 Reserve: 0.00 Ops: - Portable PFS Maintenance (periodically as required). Nominal: - N/A Reserve: - N/A PPO Change Log *Crew Roll-up is not maintained real-time.