PXD ATCA DAQ Issues and Announcements S. Lange (Universität Gießen) Belle PXD and SVD Workshop Göttingen, 24.-26.09.2012.

Slides:



Advertisements
Similar presentations
News on PXD Readout Issues Sören Lange, Universität Gießen, Belle II DAQ/TRG, KEK, 七夕, 平成 21.
Advertisements

SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
PCIe based readout U. Marconi, INFN Bologna CERN, May 2013.
CMS Upgrade Workshop November Fermilab POWER DISTRIBUTION SYSTEM STUDIES FOR THE CMS TRACKER Fermilab,University of Iowa and University of Mississippi.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Status Report of CN Board Design Zhen’An LIU Representing Trigger Group, IHEP, Beijing Panda DAQ Meeting, Munich Dec
DEPFET Backend DAQ, Giessen Group 1 ATCA based Compute Node as Backend DAQ for sBelle DEPFET Pixel Detector Andreas Kopp, Wolfgang Kühn, Johannes Lang,
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
Understanding Data Acquisition System for N- XYTER.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
Upgrade: Calo Trigger Calorimeter detector 20 Link = 4 copper wire Serial LVDS 280Mhz 32
Strategy for unified data link Zhen-An LIU Institute of High Energy Physics.
New ATCA compute node Design for PXD Zhen-An Liu TrigLab, IHEP Beijing Feb , 6th International Workshop on DEPFET Detectors and Applications.
Report from Grünberg Workshop Sören Lange, Universität Gießen 5 th International Workshop on DEPFET Detectors and Applications , Valencia,
SVD DAQ and Overall DAQ for DESY Telescope Test Takeo Higuchi (KEK) Sep. 26 th, 2012The 2 nd PXD/SVD Joint Meeting I have a serious problem in the Internet.
Report from 5th PXD DAQ Workshop Tokyo University, November 19-20, 2012 Tokyo Daigakku = „Todai“ symbol is Ginkgo leafs.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Prototype of the SVD Finesse Transmitter Board (FTB) (Sender Part for HSD Link) wacek ostrowicz 14 slides The Prototype of the SVD FTB Recent.
Report from Panda DAQT and Frontend Workshop Sören Lange (for the DAQT Group) XXXIII Panda Collaboration Meeting 05/31-06/04, June 2010 Stockholm.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
1 Hardware Tests of Compute Node Carrier Board Hao Xu IHEP, CAS.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Compute Node Tutorial(2) Agenda Introduce to RocketIO How to build a optical link connection Backplane and cross link communications How to.
Test beam preparations Florian Lütticke, Mikhail Lemarenko, Carlos Marinas University of Bonn (Prof. Norbert Wermes) DEPFET workshop Ringberg (June 12-15,
Data Acquisition of the PXD Takeo Higuchi (KEK) PXD follow up meeting on Nov.7,2010 « DISCLAIMER» Materials prepared for and presented in PXD follow up.
Mu3e Data Acquisition Ideas Dirk Wiedner July /5/20121Dirk Wiedner Mu3e meeting Zurich.
SHARING A HIGH SPEED OPTICAL DATA TRANSMISSION LINK WITH SLOW CONTROL STREAM TIPP2014 Amsterdam June Zhen-An LIU, Jingzhou Zhao, Dehui Sun, Trigger.
PXD DAQ in Giessen 1. How we do programming 2. Proposal for link layer Bonn+Giessen Meeting, Feb 2, 2011.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
B-KLM DAQ 2011/01/25 Trigger/DAQ workshop K. Sumisawa (KEK) Introduction Summary +7 pages.
Status Report of the PC-Based PXD-DAQ Option Takeo Higuchi (KEK) 1Sep.25,2010PXD-DAQ Workshop.
AMC-based Upgrade of Compute Node Hao XU Trigger group of IHEP, Beijing PANDA DAQT and FEE Workshop, Rauischholzhausen Castle April 2010.
Status of Compute Node Zhen’an Liu, Dehui Sun, Jingzhou Zhao, Qiang Wang, Hao Xu Triglab, IHEP, Beijing Wolfgang Kühn, Sören Lange, Univ. Giessen Belle2.
Johannes Lang: IPMI Controller Johannes Lang, Ming Liu, Zhen’An Liu, Qiang Wang, Hao Xu, Wolfgang Kuehn JLU Giessen & IHEP.
PXD DAQ News S. Lange (Univ. Gießen) Belle II Trigger/DAQ Meeting (Jan 16-18, 2012, Hawaii, USA) Today: only topics important for CDAQ - GbE Connection.
DHH at DESY Test Beam 2016 Igor Konorov TUM Physics Department E18 19-th DEPFET workshop May Kloster Seeon Overview: DHH system overview DHE/DHC.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
DHH progress report Igor Konorov TUM, Physics Department, E18 DEPFET workshop, Bonn February 7-9, 2011 Outline:  Implementation synchronous clock distribution.
Private Notes on the 3 rd PXD DAQ/Trigger Workshop T.Higuchi (KEK) Jul.8,2011B2GM.
The Data Handling Hybrid
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
Markus Friedl (HEPHY Vienna)
PXD DAQ Workshop June 9 and 10, 2011 Münzenberg (near Gießen) Goals: 1
PANDA collaboration meeting FEE session
Future Hardware Development for discussion with JLU Giessen
The Data Handling Hybrid
DHH progress report Igor Konorov TUM, Physics Department, E18
Update on New Compute Node design for PANDA experiment
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
PXD ATCA DAQ for DESY Test
The University of Chicago
Development of new CN for PXD DAQ
The LHCb L0 Calorimeter Trigger
Presentation transcript:

PXD ATCA DAQ Issues and Announcements S. Lange (Universität Gießen) Belle PXD and SVD Workshop Göttingen,

Belle II SVD and PXD, Göttingen 2012SL 2 Old Assignment (2008/09, see also TDR) 1 HalfLadder 1 DHH 1 Compute Node 1 FPGA To EVB LVDS optical 1:1:1:…

Belle II SVD and PXD, Göttingen 2012SL 3 New (Bayrischzell Workshop) DHH as ATCA module - Consequences for Assignment DHHC 5 inputs (2 inner and 3 outer) HalfLadder and DHH 4 outputs optical links to one ATCA CN DHH

Belle II SVD and PXD, Göttingen 2012SL 4 Consequences: 1. Load balancing on DHH ( )%/5 = 0.42 % 2. ATCA builds HALF-EVENTS on 1 CN (forward or backward PXD) w/o using the ATCA backplane 5 half-modules, 5 DHH but 1 optical link (6.5 Gbps) For next event: - same 5 DHH - next optical link - next CN (round robin assignment) PXD DAQ - DHH Assignment CN DHHC

Belle II SVD and PXD, Göttingen 2012SL 5 Tests at Giessen  Ongoing tests are tests beyond DESY test setup  1. Joined hardware QA checks (IHEP & Giessen) of all available CN Vers. 2 and Vers. 3 Several minor issues: power supply filter capacitor burned (12 V, 1 piece ~100 Euros), JTAG download (FPGA broken on AMC board?), oscillators (re-soldering required in many cases)  2. ATCA backplane communication (RocketIO) between several CN Tests ongoing Details to be reported at PXD/SVD DAQ and Trigger Workshop in November

Belle II SVD and PXD, Göttingen 2012SL Visit of „parlametary secretary of state“ Dr. Helge Braun Covered in both Giessen newspapers Giessener Allgemeine and Giessener Anzeiger

Belle II SVD and PXD, Göttingen 2012SL 7 Next PXD DAQ and Trigger Workshop  November University of Tokyo  Hotel block reservation at Akihabara („electric town“) 9,450 JPY per night  Plan to move from KEK to Tokyo on Sunday 18 (shops are open, so you can already buy optical cables, transistors, etc. TAXFREE)  organized by Higuchi-san  if you like to participate, please contact  strong thematical focus on DESY test

BACKUP

Belle II SVD and PXD, Göttingen 2012SL 9 Data Rates (for bandwidth session)

Belle II SVD and PXD, Göttingen 2012SL 10 Data Rates (for bandwidth discussion)

Belle II SVD and PXD, Göttingen 2012SL 11 ATCA backplane subevent building (OLD) All 40 FPGAs get a data packet (even if zero hits ! empty event, but header) Main task of event building: 1 FPGA collects all packets via ATCA backplane 3-step transfer sender-FPGA ! [serial] ! switch-FPGA ! [RocketIO] ! switch-FPGA ! [serial] ! receiver-FPGA Not trivial but manageable For next event, next FPGA (round-robin) Half-Events vs. Full-Events on ATCA

Belle II SVD and PXD, Göttingen 2012SL 12 ATCA backplane subevent building (NEW) Half-event building per 1 CN Half-events stored by a CN-1of4-“master“ Task of event building: 2 FPGAs with 2 half-events need to find each other No empty headers for same event on any of the others FPGAs For next event: some other two FPGAs Need to keep bookkeeping of - non-ready half-events - half-events in use - built events