1 J-PARC Status - Conquering the earthquake disaster and a new step forward to MW J-PARC operation - Yujiro Ikeda J-PARC Center JAEA & KEK

Slides:



Advertisements
Similar presentations
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Advertisements

Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
Status of ATF/ATF2 and machine schedule in this fall Impact of the earthquake Recovery status, alignment Schedule in this fall N. Terunuma, KEK.
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
KEK / Fujio Naito How J-PARC recovered from the big earthquake Outline About J-PARC The earthquake Damage on J-PARC Recovery plan Beam study results Summary.
KEK, High Energy Accelerator Research Organization.
New results from K2K Makoto Yoshida (IPNS, KEK) for the K2K collaboration NuFACT02, July 4, 2002 London, UK.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
Multiplicity and Energy of Neutrons from 233U(nth,f) Fission Fragments
Chalmers University of Technology, Sweden
J-PARC upgrade T. Nakadaira (KEK / J-PARC). Outline J-PARC overview & on-going program Motivation of future experiment in J-PARC Overview of future experiment.
J-PARC: Where is it? J-PARC (Japan Proton Accelerator Research Complex) Tokai, Japan 50 GeV Synchrotron (15  A) 400 MeV Linac (350m) 3 GeV Synchrotron.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
June 20, 2008Shin'ya Fermilab E9061 J-PARC and Dimuon Experiments Shin’ya Sawada KEK (High Energy Accelerator Research Organization, Japan)
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
050928ICFA seminar Daegu 1 Inter-University Research Institute Corporation High Energy Accelerator Research Organization KEK Yoji Totsuka.
1 Status and Plans at J-PARC Linac Kazuo Hasegawa J-PARC Center/Japan Atomic Energy Agency Collaboration meeting between CERN and J-PARC December 18, 2013,
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
KamLAND : Studying Neutrinos from Reactor Atsuto Suzuki KamLAND Collaboration KEK : High Energy Accelerator Research Organization.
F Project X Overview Dave McGinnis October 12, 2007.
KEK Plans for J-PARC Particle Physics at J-PARC CERN-KEK Committee March 29, 2010 at KEK Koichiro Nishikawa Institute for Particle and Nuclear Studies,
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Development of the beam loss monitor for beam halo measurement in the J-PARC RCS Masahiro Yoshimoto *, Hiroyuki Harada, Shinidhi Kato, Kota Okabe, Michikazu.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Asian Test Beam Facilities Satoru Uozumi Kyungpook National University Mar-29 th 2010 Beijing China IHEP Beijing TBF Russia.
Test-beam facility at IHEP CAS An Guangpeng, Li Jiacai CEPC-SPPC Study Group Meeting IHEP
1 Progress of the J-PARC Shoji Nagamiya Director, J-PARC Center at KEK/JAEA July 6, GeV PAC.
Overview of the KEK Neutrino Beam Facility and its Operation Summary after September 2000 FNAL) K.H. Tanaka for the KEK-PS Beam Channel Group.
1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
G-2, EDM, COMET muon particle physics programmes at J-PARC Mu_01 Satoshi MIHARA IPNS, KEK FKPPL-FJPPL workshop, Yonesei Univ.
Neutrino-­nucleus (nucleon) Reaction Measurement by J-PARC MLF sterile neutrino search experiment (J-PARC P56) Takasumi Maruyama (KEK) for J-PARC P56 working.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Test beams status  Protvino source: V. Ammosov  Dubna source: P.Rukoyatkin, E.Strokovsky Václav Vrba Institute of Physics, AS CR, Prague – LCTW09, LAL,
Road Map of Neutrino Physics in Japan Largely my personal view Don’t take too seriously K. Nakamura KEK NuFact04 July 30, 2004.
Copyright © 2015 SCKCEN ADS accelerator developments presently on-going for MYRRHA and possibly for the Chinese-ADS Dirk Vandeplassche 1 Eucard-2 — APAE.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
Medium baseline neutrino oscillation searches Andrew Bazarko, Princeton University Les Houches, 20 June 2001 LSND: MeVdecay at rest MeVdecay in flight.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
1 Status of the T2K long baseline neutrino oscillation experiment Atsuko K. Ichikawa (Kyoto univeristy) For the T2K Collaboration.
The Polarized Internal Gas Target of ANKE at COSY
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
LOGO Status and activities of the Korea Proton Accelerator Users Association *Korea Proton Accelerator Users Association S. J. Noh Department of Applied.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
1 Heavy-Ion Physics at J-PARC Shoji Nagamiya RIKEN / KEK / JAEA January 20, 2016 Tokai 1) Motivation 2) J-PARC vs. FAIR.
SUPERKEKB MAIN RING TUNNEL MOTION M. Masuzawa, T. Adachi, H. Iinuma, T. Kawamoto and Y. Ohsawa, KEK Tsukuba, Japan
Status Report of the Realignment for J-PARC 3GeV RCS N. Tani, H. Hotchi, M. Yamamoto, J. Kamiya, K. Horino, M. Kinsho J-PARC Center, JAEA 1 Outline 1.
The machine status and operating mechanism of BEPCII CAO, Jianshe Institute of High Energy Physics, CAS April 16, 2013 The 4th Accelerator.
ICFA mini-Workshop on Beam Commissioning for High Intensity Accelerators Yasuhiro Watanabe (J-PARC / JAEA) Tracking between bending and quadrupole families.
Ver. 1.1 [Nov.06]NBI2012, CERN, Geneva, Switzerland, 6 th – 10 th November 2012 Ishida et al. J-PARC/KEK J-PARC Upgrade Plan for Future and Beyond T2K.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Development Plan for Reliable Card-size IOC N. Kamikubota and S.Yamada, J-PARC/KEK May 2015 in MSU, kami, KEK/J-PARC.
UK Neutrino Factory Conceptual Design
J-PARC main ring lattice An overview
News and brief overview of Beamline plans for the next few months
Results from T2K and Prospects for Hyper Kamiokande
Status of ATF/ATF2 and machine schedule in this fall
LAL meeting on e+ studies, Oct. 2010
Status of SuperKEKB May 11, 2007 SuperB Workshop Masa Yamauchi KEK.
A Superconducting Proton/Electron Linac
Industrial Use at J-PARC
Presentation transcript:

1 J-PARC Status - Conquering the earthquake disaster and a new step forward to MW J-PARC operation - Yujiro Ikeda J-PARC Center JAEA & KEK Meeting for the Hyper- Kamiokande Project at KIPMU

2 ADS: Nuclear Transmutation (Phase 2) Joint Project between KEK and JAEA since 2001 with 1.9 B$ 2 Materials and Life Science Experimental Facility Hadron Beam Facility 500m Linac (330m) Neutrino to Kamiokande J-PARC Facility 3 GeV Rapid Cycle Synch. (25 Hz, 1MW) 50 GeV Main Ring (0.75 MW) J-PARC = Japan Proton Accelerator Research Complex

3 J-PARC Facility (KEK/JAEA ) Bird’s eye photo in January of 2008 South to North Neutrino Beams (to Kamioka) JFY2009 Beams 50 GeV Main Ring Hadron Exp. Facility Materials and Life Experimental Facility JFY2008 Beams 3 GeV RCS CY2007 Beams Linac

4 Goals at J-PARC Need to have high-power proton beams  MW-class proton accelerator R&D toward Transmutation at 0.6 GeV Nuclear & Particle Physics at 50 GeV Materials & Life Sciences at 3 GeV

5 Before the Earthquake

6 Power upgrade scheme before J-PARC Power Expectation [MW] JFY2008 JFY2009 JFY2010 JFY2011 JFY2012 JFY2013 JFY kW 3 GeV MR 30 GeV 200 kW MR 115 kW Earthquake 145 kW Operation Start

7 1/T ( 温度 ) log ( 伝導率 ) 常温 New materials Tokyo Institute of Technol.,Toyota 、 KEK, issued 「 Nature Materials 」 Present Ceramics for Li battery materials Crystal structure P4 2 /nmc (137); a = (18) Å, c = (4) Å Neutron Defraction Japanese press highlighted Steady production of good exciting results

8 Excitement from T2K 8 Expected BG 1.5±0.3evts 6 e candidates found! (  m 23 2 >0)(  m 23 2 <0) Central value 90%CL range Prob. of 6 are all BG: 0.7% (2.5  equiv) Allowed region Selected to Physics World Top 10 Breakthroughs (England) in news/48126 Indication of e appearance (non-zero  13 )

9 TOF counters I have done ! Hadron Hall bustles ---waiting for beam Students, researchers, technicians, Professors, ・・・, from worldwid first beam K1.8 first beam KOTO (E15) experimental team K1.8 experimental preparation K1.8BR preparation New commerK1.8 area completion of TOF counter setup KL measurement room at midnight KL background measurement

10 Before earthquake – 200kW beam, 400kW power tested – 145kW for MR FX, 6 events of electron neutrino – Experiments started at Hadron Hall – Scientific production form MLF users – JAEA : Public User Program under a Law started Open for international users and industries – Throughout all facility, internationalization endeavor is needed – Effective program for foreign scientist to come – More promotion of neutron to industry Summary

11 Recovery from the Earthquake

12 LINAC Immediately after the Earthquake After recovery The road rose up Ground water of 100 ton came into LINAC tunnel :: alert for submergence The ground droped down with 1.5 m Water was discharged

13 3 GeV Synchrotron (RCS) The capacitor bank collapsed new old Immediately after the earthquake: there were road winding and landslid The stage of power supply was bent. Lifted up

14 50 GeV Synchrotron (MR) Amplified x mm 0.6 mm Height horizontal vertical Maximum 20 mm displacement (horizontal) and 8 mm (vertical) for 400 magnets Beam line distorted seriously All adjusted to within 0.4 mm.

15 Materials & Life Science Experimental Facility (MLF) Immediately after the Earthquake Re-stacking all blocks 530 pieces and 2800 tons in total (Experimental Halls) West Extended Building Subsided ~20 cm There were no severe damages in the MLF main building. Piling into basement rock Dislocated a lot! The entire annex building was jacked up.

16 Neutrino & Hadron Experimental Facilities An outdoor unit leaned. The ground sank. recovered Fixed

17 MLF User Program Investigation Recovery Power-on Test New Hg Target Shielding recovery BL Components MLF User Operation NU Experiment Cooling Water Alignment Recovery NU or HD Operation 3GeV synchrotron 50GeV synchrotron Materials & Life Science Experimental Facility Hadron Experimental Facility Neutrino Experimental Facility Investigation Recovery HD Experiment All the J-PARC members worked hard and coherently to attain the December Recovery. Beam Injection Beam Commissioning Power-on Test Extended Bulg Infrastructure Linac RCS MR MLF Hadron Neutrino Beam Test User Operation Start Emergency Recovery Full Recovery Work J-PARC Recovery Schedule )

18 December 9, :30 Key was on. 14:00 Beam went throughout the Linac at 3 MeV with RFQ acceleration. Nov. of The first beam was on at the Linac. 3 days before the target date Remarkably fast recovery

19 Resuming User Operation

20 History of beam power (3GeV RCS) 280 kW on June kW Restored the J-PARC from the Great East Japan Earthquake within a year. Smooth recovery has been achieved

21 Trend of Number of Proposals Affiliation of approved proposals (General Use) Very high fractional ratio of industrial applications Neutron and Muon User Program Increase of proposals

22 Recent Results 10 electron neutrino candidates are detected Expected BG (  13 =0) is estimated to be 2.73±0.37 evts Probability to observe >=10 evts w/  13 =0 is 0.08% (3.2  ) –C.f. 0.7% (2.5  ) in 2011 Evidence of ELECTRON NEUTRINO APPEARANCE Reported at the IIV International Conference on Neutrino Physics and Astrophysics (Neutrino2012)

23 Summary Quick recovery for the earthquake –Facility and beam is on. –User operation resumed. Stable operation since then –Till now, 3GeV 200kW, even 300kW at MLF, –Keeping 8 cycle user time, –In 2013, preparatory work for 1MW at RCS will be shceduled.

24 Govrnment review and 5year plans After previous review 5 years ago The great east Japan earth quake Next 5 years plan and priority 2012 March to June

25 Accelerator and neutrino : Power –RCS  1 MW –MR  750kW ( MR Power supply improvement ) Neutron –New BL (JAEA 3, KEK 1), Computer, Sample environment Muon –New S-line (  SR) and H-line (g-2, EDM) ハドロン –High momentum beam line + COMET (  ->e) ADS(Accelerator Driven Nuclear Transmutation) Facility buildings –User main building, Radioactive materials storage, Lodging Clear prioritize is needed Red = JAEA Blue = KEK High priority demands from now Keeping budget for 200 days operation is critical key. * cost rise is headache.

26 Near term operation schedule

27 FY2012 operation schedule As many as possible, provide user time 8 cycles (~ 180 days ) From October, RCS for MLF :>300kW MR for FS >200kW for SX>10kW To keep machine time as much as for 5 s of neutrino events. Continue operation regardless of the new year holiday

28 Installation and tests of all needed for 1MW: 400 MeV LINAC 1MW Ion source, RFQ 132 days user operation time FY2013 operation schedule Trying to keep enough machine time for 5 s statistics of neutrino events!! Operate by the end of July even it is Summer time!! Time Shift Cost pushing

29 Promise J-PARC is the facility to get as much value you can in your science. Thank you very much for your attention!