Meeting 6 Giugno 2012 Riunione Gruppo Pisa 6 Giugno 2012C.Roda1.

Slides:



Advertisements
Similar presentations
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Advertisements

Jet Slice Status Report Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 9 July 2014.
Searches for di-lepton and di-photon resonances at ATLAS 1OCPA7, Yanwen Liu/USTC Yanwen Liu University of Science and Technology of China (USTC) On behalf.
1 First Considerations on LNF Tier2 Activity E. Vilucchi January 2006.
1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
Muon Data Quality and Performance A. Belloni - G. Zevi Della Porta for the ATLAS Harvard Group DOE Site Visit
Shift summary ZHU Chengguang. Class 1: ACR shifts - Shifts in ATLAS Control Room and Tier-0/ADC shifts at Point-1. units :shifts – weekend and night shifts,
The ATLAS/TILECAL Detector Control System Helena Santos (LIP − Lisbon) on behalf of the Tile Calorimeter Group EBC LBC LBA EBC TILECAL is the hadronic.
Sept 30 th 2004Iacopo Vivarelli – INFN Pisa FTK meeting Z  bb measurement in ATLAS Iacopo Vivarelli, Alberto Annovi Scuola Normale Superiore,University.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
SiPM measurement setup NINO board Adapter board Very first measurement: time difference between SiPM signal and Laser Sync (no optimization, T ambient)
Management Committee Summary Effort at CERN Operational Tasks Cost Sharing and New Expenses ZDC Collaboration Management roles Papers, Conferences and.
O FFLINE T RIGGER M ONITORING TDAQ Training 30 July 2010 On behalf of the Trigger Offline Monitoring Experts team.
Preliminary comparison of ATLAS Combined test-beam data with G4: pions in calorimetric system Andrea Dotti, Per Johansson Physics Validation of LHC Simulation.
LHCC Review, CERN, 19/10/99Paul Bright-Thomas, for Alan Watson 1 LVL1 Calorimeter Algorithm Updates Changes since the TDR: Greater “integration” of e/
1 Control Room Model 4 Types of control rooms  Field Control Room (FCR): for example operating near the equipment in USA15. Expected to be needed throughout.
1 Trigger “box” and related TDAQ organization Nick Ellis and Xin Wu Chris Bee and Livio Mapelli.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 3 May 2012.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
Examination of Corrupted Data in the Tile Calorimeter Stephanie Hamilton Michigan State University The ATLAS Experiment Supervisor: Irene Vichou (U of.
September 30, 2004FTK meeting1 Making the FTK Physics Case M. Shochet 9/30/04.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Introduction Ricardo Goncalo HSG5 H->bb weekly meeting, 6 December 2011.
19 November 98 1 Jürgen Knobloch ATLAS Computing ATLAS Computing - issues for 1999 Jürgen Knobloch Slides also on:
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
Muon Shift Organization Outline Class 1 Atlas Control Room Shifts Booking Present Status + Experience+ Feedback Class 2 reminder A. Polini & Z. Yan May.
Reflections of a System Run Coordinator Or Equivalent! Bruce M Barnett STFC, Rutherford Appleton Laboratory L1Calo Collaboration Meeting January.
September 2007CHEP 07 Conference 1 A software framework for Data Quality Monitoring in ATLAS S.Kolos, A.Corso-Radu University of California, Irvine, M.Hauschild.
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
Technical Workshop 5-6 November 2015 Alberto Di Meglio CERN openlab Head.
K. Jon-And, Stockholm University1 Tilecal Team 5 meeting 8 November 2005.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
H->bb Note Schedule Ricardo Gonçalo (RHUL) HSG5 H->bb WH/ZH note meeting with Editorial Board, 28 June 2011.
Trigger Offline Monitoring Report Experts: Jiri Masik, Ricardo Gonçalo Shifters: Iwona Grabowska-Bold, Holger von Radziewski, Gustavo Otero y Garzon, Michael.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Physics Results from CDF and Prospects for a FY 2011 Run Kevin Pitts / University of Illinois DOE S&T Review of Scientific User Facilities June 30 – July.
Introduction S. Rajagopalan August 28, 2003 US ATLAS Computing Meeting.
SU participation in nn bar Sam Silverstein. Who are we? Particle physics group  ATLAS  IceCube Instrumentation physics division  ATLAS L1Calo trigger.
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
ATLAS Napoli Statistica del gruppo: – 16 autori 2 PhD (S.P. – G.Z.) – 1 in qualificazione (F.C.) – 14 M&O – OT.
Preparation for Running Outline Present Schedule Detector Preparation Requests for dedicated runs –Cosmics, Splashes, Alignment Muon Shifts Experts A.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Budget Preparation Calendar. Budget Workshop Agenda for June 26, 2002.
1 Austrian Participation in ATLAS  Innsbruck University  FH Wiener Neustadt  Austrians in ATLAS at CERN RECFA meeting, Vienna, Emmerich Kneringer.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
H->bb Note Plans for Summer Ricardo Gonçalo (RHUL) HSG5 H->bb weekly meeting, 21 June 2011.
Zvi Citron Correlations Between Neutral Bosons and Jets in Pb+Pb Collisions at 2.76 TeV with the ATLAS Detector Zvi Citron for the ATLAS Collaboration.
Summary of Deliverables & Reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Outreach :
Management Committee Summary Effort at CERN Operational Tasks Cost Sharing and New Expenses Papers and Conferences Dates of Upcoming Meetings Humboldt.
Schedule ● External Links ● Calorimeter Signals ● Internal Tests ● System Tests ● Combined Runs ● Schedule Murrough Landon 19 April 2007 A brief update.
Calibration Operations ● Recent Changes ● Required Changes ● Calibration by Shifters Murrough Landon 23 March 2011.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
PADME team leaders meeting
Draft of to institute heads
Runione AtlasItalia Milano 17/11/2009
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
Summary of Deliverables & reached Milestones
Online SW, DB & Calibration
Data Preparation Group Summary of the Activities
Overview of CLAS12 Calibration
Status of ATLAS Resources
Introduction The aim of this talk is to try to get a feeling on the expected degradation of performance of a calibration once we move from MonteCarlo.
DØ and Hunting the Higgs at Arizona
Overview Goal Study GEM variables in SVAC ntuple
Commissioning of the ALICE-PHOS trigger
ATLAS-TileCal Physicists PhD Students Electronic engineers
Presentation transcript:

Meeting 6 Giugno 2012 Riunione Gruppo Pisa 6 Giugno 2012C.Roda1

Dal talk di Fabiola di ieri Riunione Gruppo Pisa 6 Giugno 2012C.Roda2

H  γγ Riunione Gruppo Pisa 6 Giugno 2012C.Roda3 Moving to 2.7 fb -1 today

H  γγ – preliminary combination Riunione Gruppo Pisa 6 Giugno 2012C.Roda4 (signal, "June 2" version) (background, "June 3" version) (improved analysis, "June 1" version) (stat, "June 1" version) (7TeV/8TeV summary note, "June 2" version) June 6 th at new update of the result. (signal, "June 2" version) (background, "June 3" version) (improved analysis, "June 1" version) (stat, "June 1" version) (7TeV/8TeV summary note, "June 2" version) June 6 th at new update of the result.

OTP Da fareFatti o prenotati2012 – so far allocated Class % Class % Class 31.95~1.260% Riunione Gruppo Pisa 21 October 2011C.Roda – Allocated so far Class 1: ACR Tile: Federico 12*1.3, Vincenzo 2 Class 2: 28 (DQ Leader - Chiara) + 14 (Zenone DQ Valid) = 42 Class 3: 0.4 OFV/Chiara, 0.3 DPL-FTK/Paola, 0.1 FTK/Piendibene, 0.07 Laser/Nino Speaker Comm/Chiara Tau-trg/Zenone + ?/Laser Federico 2012 – Allocated so far Class 1: ACR Tile: Federico 12*1.3, Vincenzo 2 Class 2: 28 (DQ Leader - Chiara) + 14 (Zenone DQ Valid) = 42 Class 3: 0.4 OFV/Chiara, 0.3 DPL-FTK/Paola, 0.1 FTK/Piendibene, 0.07 Laser/Nino Speaker Comm/Chiara Tau-trg/Zenone + ?/Laser Federico

Novita` e agenda di oggi Riunione Gruppo Pisa 6 Giugno 2012C.Roda6 Qualificazioni S.Donati ha iniziato la qualificazione con TDAQ (50% - stesso lavoro di Paola) + FTK (50%) S.Leone ha intenzione di iniziare presto  individuare il lavoro in TDAQ, Tile o Data Preparation. Collaboration Board venerdi` si vota per la nuova Spokeperson

Riunione Gruppo Pisa 6 Giugno 2012C.Roda7 Benevenuta a Marina !

Back-up Riunione Gruppo Pisa 6 Giugno 2012C.Roda8

OTP: Operation Task Planner Ma in effetti quello che significa e` lavoro di servizio Riunione Gruppo Pisa 21 October 2011C.Roda9 Pisa in 2012 has 7.5 authors Class1: Atlas Control Room (ACR) shifts. We normally do Calorimeter, Trigger shifts but there are other possibilities: shift leader, DQ, run control. Shifts at night/we are weighted 1.3 while normal shifts are weighted Pisa in 2012 has 7.5 authors Class1: Atlas Control Room (ACR) shifts. We normally do Calorimeter, Trigger shifts but there are other possibilities: shift leader, DQ, run control. Shifts at night/we are weighted 1.3 while normal shifts are weighted

OTP Riunione Gruppo Pisa 21 October 2011C.Roda10 Class2: Additional shifts, data quality, computing shifts, remote shifts, on-call shifts. We normally contribute with TileCal DQ shifts, Tile run coordination. We have to find other areas of contributions: JetEtMiss DQ shifts,… Class 3: expert work. Contribution: Laser calibration for Tile, OF validation for Tile, expert work for FTK

OTP - aggiornato – so far allocated Class 1130%84%0% Class 2173%93%30% Class 399%45%50% Riunione Gruppo Pisa 21 October 2011C.Roda – Allocated so far Class proposta 1: Zenone 7 Federico 11 Vincenzo 4 Nino 4 Class 2: 28 (DQ Leader - Chiara) + 14 (Zenone DQ Valid) = 42 Class 3: 0.4 OFV/Chiara, 0.3 DPL-FTK/Paola, 0.1 FTK/Piendibene, 0.07 Laser/Nino Speaker Comm/Chiara 2012 – Allocated so far Class proposta 1: Zenone 7 Federico 11 Vincenzo 4 Nino 4 Class 2: 28 (DQ Leader - Chiara) + 14 (Zenone DQ Valid) = 42 Class 3: 0.4 OFV/Chiara, 0.3 DPL-FTK/Paola, 0.1 FTK/Piendibene, 0.07 Laser/Nino Speaker Comm/Chiara