MM Status Mostly unchanged (Feb. 3 rd 2016). Parts Mildly modified bridges, allowing to actually move 130nm pickup tools along r*phi –Turned out to be.

Slides:



Advertisements
Similar presentations
News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Advertisements

Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Mitsubishi RA90 4 axis Wire EDM
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Status Update on Mechanical Prototype in Rome November 6,
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Background New 3mm thick optical filter
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
The Ariel Assembly Instruction By Laser Dollhouse Designs.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
SolidWorks: Extruded Cuts, Fillets, and Patterns Introduction to Robotics.
Automated Tooth Paste Dispenser By: Cameron Bauer.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Basic Screen Printing Procedures for T-Shirts GOP_5-2 Screen Printing.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Top surface of B3L Top surface of B3L B3L12 Tried to blow off, but couldn’t Insde of tube. B3L15 The dot at the middle.
PLATE CHANGER for OIL microscopes Gabriele Sirri INFN Bologna for INFN Bologna and LNGS.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
Vienna Fast Simulation LDT Munich, Germany, 17 March 2008 M. Regler, M. Valentan Demonstration and optimization studies by the Vienna Fast Simulation Tool.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
G. Sirri - Bologna videoconf /9 Lateral X-rays with ESS  Goal: implementation of the lateral mark finding in the ESS software  test version.
Design Studies 20 ‘Show Off’ Project How to make a computer monitor In Google Sketchup By: Liam Jack.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Advanced Graphing Using Excel V.1 Part II: Giving your graph style Written and Created by: James Golen University of Michigan – Dearborn Science Learning.
Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Update on Module Mounting on Staves and Stavelets 25/8/11 1.
The Larsen Autoblocker Calibrating Your System for Maximum Productivity and Quality.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Magnet Fiducialization.
Loading stave 4000  Receiving test of modules : No problem despite some damages at one edge of few modules (AMS) One MCC failure in one module, reworked.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
QXF Coil working group 2/11/16 Dan Cheng J. DiMarco, C. Hernikl, D. Humphries, S. Myers, X. Wang MQXFA Coil Fiducialization Proposal.
Automatic Test Equipment Development with C-ON Seo Dong Gon Yonsei University.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Ork Watch Tower – First Floor Measurements may vary on your printer
ATLAS pixel module assembly flow
Check the focal distance of the lens
Filter drilling status
Update on Module Mounting on Staves and Stavelets and a description of how the new system will work 11/7/11.
Are there better ways to build a stave?
Gluing jigs for Demonstrator
Equipment for Assembly – UK Experiences
WG4 – Progress report R. Santoro and A. Tauro.
Lesson 3 Advanced Settings
¾”-2”.
GLAST Large Area Telescope:
Bunker Wall Design Wall ESS
Presentation transcript:

MM Status Mostly unchanged (Feb. 3 rd 2016)

Parts Mildly modified bridges, allowing to actually move 130nm pickup tools along r*phi –Turned out to be blocked by cutout at bottom side of the bridge New bridge layout is “done” in a first iteration –Pickup tools have been ordered and delivered, looking good –Still needs base parts for the bridge, some fine-pitch screws…

Todo List Minor modifications: –Vacuum check lights, possibly with sensing –Vacuum distribution and source Currently available from clean room vacuum, would like to decouple this to so as to not harm general cleanroom operation due to larger flow from the MM system –Remake mount for cameras + laser range finder Currently unstable and without large FOV webcam –Straight line reference Almost ready New mount for camera arrived Modification to Laser to also hold target is needed Major modifications: –Still hoping to get an interferometer (end of year money) –New bridges whenever they happen

Thermomechanical Stave Stave is currently on mounting table and has been scanned with the laser range finder on both sides (Monday and Tuesday evening) Two Bridges are available for mounting modules –Min. 4 modules ready to be installed No EOS cards for that yet –The current layout used for thermo cycling and testing has a feature that prevents the covers from being mounted without modification – do we want that? Still need to run through position numbers for fiducials on the stave, to allow placement through software defined positions

Thermomechanical Stave Glue Pattern: Octothorpe –Lines: How thick –Worry about bending due to tooling (pressure points currently on the outside) Add extra dots in all four corner of the module? Hand Stave to Graham again before fully loaded for initial tests –Needs the EOS to arrive first