Cooling Water and Heat Recovery system Thomas Hjern Harald Bäck Design Leader Process systems Conventional Facilities Accelerator Review November 3-4,

Slides:



Advertisements
Similar presentations
HVAC 11a CNST 305 Environmental Systems 1 Dr. Berryman
Advertisements

It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Components of HVAC System
IDEAL PHARMACEUTICAL FACILITY PRESENTED BY: IHSAN ULLAH KHAN KHATTAK Chief Manager Production Highnoon Laboratories Limited 17.5 K.M. Multan Road, Lahore,
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
ESS Cooling and Heat Recovery system Thomas Hjern
Group Meeting #1 January 29 th, 2013 Michael Bentel Jeremy David Erik Peterson Arpit Shah 1.
Advanced hydraulic solutions
Hydraulics.
Overall issues for adequate design for high-ambient temperature operation by: Samir Hamed Petra Engineering Ind. Co. Rtoc member.
POWER PLANT.
44 th Annual Conference & Technical Exhibition By Thomas Hartman, P.E. The Hartman Company Georgetown, Texas Sustainable Chilled Water.
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
POWER CONTROL LIMITED Introducing “PermaFrost” Presented by Ir. K.M. Wong.
High Temperature Cooling of Cryoplants and RF Systems at the European Spallation Source 2 nd Workshop Energy for Sustainable Science at Research Infrastructures.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Diesel Power Plant Mr.B.Ramesh, M.E.,(Ph.D) By
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Solar cooling systems.
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Automatic Tube Cleaning System for Condensers and Heath Exchangers
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
N O R T H A M E R I C A C O M M E R C I A L TDP
Click left mouse button to advance, “back” to return Phasefale November 2007 Presscon Network Click left mouse button to advance, “back” to return.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
Facilities Management and Design Chapter 7 HVAC Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Lecture Objectives: Differences in Conduction Calculation in Various Energy Simulation Programs Modeling of HVAC Systems.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
Free cooling on RTAF Chiller
1 ESS Warm End Linac Cooling Water 5-6 May 2014 John Jurns.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Presentation Title Presented by Joe Blow Heat Transfer 101 & ROI.
Ullrich, DESY Dubna GDE XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Water cooling XFEL Desingn of the XFEL water cooling.
Air conditioning is a combination of activities such as conditioning the air i.e., heating or cooling, ensuring air.
GPAEE New Technologies Blitz 960 Brook Road, Unit 3, Conshohocken, PA * Phone: (610) * Fax: (610) * Feb 18, 2016.
Industrial Resources, Inc.
Free Air Cooling for Data Centres
Advisor: Dr. Shangchao Lin
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
The Data Center Challenge
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
WELCOME Indoor Chillers.
Cooling technology Main components and equipments
Cooling systems for HL-LHC (WP17.3)
Energy Efficiency in District Coiling System
Introducing the WaterMagnet®
WELCOME Indoor Chillers.
ILC Experimental Hall Cryogenics An Overview
Maintenance at ALBA facility: Strategy for the conventional services
Lecture Objectives: Learn about plumbing system and pumps
Tracer Applications.
LEBT water cooling system
Objective Revie the Cooling Cycle Learn about air distribution systems
Björn Eldvall ESS P&ID.
Presented by Mike Zacharias
Presentation transcript:

Cooling Water and Heat Recovery system Thomas Hjern Harald Bäck Design Leader Process systems Conventional Facilities Accelerator Review November 3-4, 2014

NSS design teams Equipment design Vendor contacts In-king deliveries Target design teams Equipment design Vendor contacts In-king deliveries CF Process design task Accelerator design teams Equipment design Vendor contacts In-king deliveries “Work package 16” CW requirement coordination CW interface to “machine” Contaminated CW systems Local CW systems CF Process Cooling Water production (CUB) Site distribution Main headers in buildings Heat recovery systems CF HVAC Heating Cooling ESS Energy Team District Heating

 Reliability“..never cause shutdown of accelerator..”  Availability6500 hours per year at full load “..never have total CW shutdown..”  StabilitySupply temperature +/- 1 °C Supply pressure +/- 0,1 bar  FlexibilityWide operating range Design margins for critical components  R ecyclingRecover waste heat  R esponsibleHigh energy efficiency Design objectives ! ! !

Cooling water station (CUB)

Simplified Cooling water block diagram

Cooling water site distribution CUB expansion area ? To Campus area

Distribution piping

Accelerator layout

3D CAD view

Isolated sub-systems Sub-system Main CW system to/from CUB Contaminated systems To low design pressure To high operating pressure

Example – Interface to CW consumers Constant flow consumersVariable return temperature

Reliability Chillers, heat pumps and pumps have standby units Redundancy for critical control components Competent monitoring and alarm functionality Backup power for critical components (Operator training and operational procedurs) Design objectives (cont.)

Availability Backup air coolers (reduced capacity) Service & maintenance of machinery at low load periods Pressure vessels inspection at low load periods Online tuning and reconfiguration of control system Two independent power supplies Design objectives (cont.)

Stability Pressure control for CW distribution Buffer tanks for CWM & CWL Advanced control capacity -Feed forward -Multi variable controls -Variable PID gain -Online tuning & configuration Design objectives (cont.) PC CWL Buffer tank 150m3 CWM Buffer tank 150m3 HEAT PUMPS PC CHILLERS CW return <30⁰C CW return 30-50⁰C CW supply 25⁰C CW supply 10⁰C CW supply 50⁰C CW return >50⁰C

Flexibility Expandability for additional heat pump and chillers Over-sizing of distribution piping Reserved space for future distribution piping Advanced control capacity Design objectives (cont.)

R ecycling Heat recovery from CW to Lund DH Heat recovery from CW to internal DH Heat recovery at ESS is both sustainable and profitable! Design objectives (cont.)

R esponsible Energy efficient heat pumps and chillers -Ammonia screw compressors Low temperature internal district heating (55°C) Integrated design “from klystrons to district heating” -Use high supply temperature -Produce high return temperature -Maximize direct cooling from CUB to Accelerator Design objectives (cont.)

Conductivty ~1µS/cm (0,5-2) Slip-stream to de-mineralizers in CUB Oxygen <15 ppb Slip-stream to degassers in CUB High pH prel – Polishing with cat-ion exchanger after de-mineralizers “Particle free” Full flow filtration at 1000 µm out of CUB Slip-stream filtration at 100 µm in CUB Local filtration at sensitive equipments Online control of conductivity, oxygen and pH Cooling water specifications

CF design standard -Common design standard for all design projects by CF -Design pressure 12 bar g / PN16 -Diff. pressure supply/return 3 bar g(2-4 bar g) -316L for piping, valves and equipments -Condensation protection for CWL supply and return -Strict manufacturing procedures Recommendations to CW consumers -Use 316L as much as possible (304 might be OK) -Use copper only when absolutely required -Don’t use brass, elastomers, plastic, etc CW Design standards

Examples – 316L components Pipes and tubing Heat transfer

Examples – 316L components Fittings Hoses and quick couplings

 Recent major changes have major impact on system design -Collector cooling 80-55°C -HVAC dehumidification -DHL capacity 6->30MW  Risk of new requirements Mitigation Re-design and/or Re-build Risk - New requirements

 Low conductivity increase corrosion rate!  Very high corrosion rate on copper at medium oxygen levels  Transition between Cu(I) and Cu(II) release particles  (Risk of copper hydroxide precipitation?) Mitigation Online monitoring Expandability for deminerilizing, degassing and filtering Large water volume => stable conductivity, oxygen and pH Gather external experiences and knowledge -Accelerators -Power industry Risk - Corrosion, fouling & plugging

Thank you!