Field Problems with Instrument Transformer Installations

Slides:



Advertisements
Similar presentations
Induction motor Course no: EE 3107 Md. Nur Kutubul Alam Lecturer
Advertisements

The Electrical GuruTM Paul W. Abernathy,CME
EZCT TURNS RATIO TEST The EZCT’s use the “Voltage Method” to determine the CT Turns ratio The ideal connection is shown in this illustration.
Digital Current Transformer Reporter
Current Transformers: A Tester Survival Guide Bryan Shannon ABB Inc. Coral Springs, FL.
Which type of circuit has more than one path for electricity to flow?
Circuit Tester Explanation How does it work? Capt. David Rifkin, Drawing 1 shows how the little circuit tester responds to.
MNM Fatal Electrical Electrical May 23, 2005 (Nevada) May 23, 2005 (Nevada) Gold Mine Gold Mine Electrician Foreman Electrician Foreman 48 years.
California Friendly ® Landscape Training Irrigation System Troubleshooting The Metropolitan Water District of Southern California and the Family of Southern.
The Association of Electrical and Medical Imaging Equipment Manufacturers Understanding GFCIs Developed by the NEMA 5PP Personnel Protection Technical.
Unit Transformer Unit transformer are step up transformer which is connected to generating house & step up voltage from 15kV voltage to 132 voltage level.
INSTRUMENT TRANSFORMERS
Three Phase Power Three Phase Motors
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
CALPORT 300 Three-Phase Portable Reference Standard
Unit 28 Single-Phase Transformers. Objectives: Discuss the different types of transformers. List transformer symbols and formulas. Discuss polarity markings.
Electrical Fundamentals
Principles of Physics Electromagnetic Induction. Changing magnetic fields can create a voltage (and thus cause current to flow) in a conductor A wire.
LO: Understand the uses of electromagnets
Proficiency Measure #8 Review Electricity and Magnetism.
Instrument Transformers
Electrical Distribution Systems
Radian Research, Inc. Radian Research, Inc. an employee owned company Power and Energy Measurement Specialists 3852 Fortune Drive.
ADT490 TroubleShooting Device Failures. 2 Introduction ‣ Many problems are external to FAS ‣ Many are device problems.
Connections of a CT and a PT to supply, load and relay.
Announcements For lectures 8 to 10 please be reading Chapter 3
Physics Review #1 LCHS Dr.E.
13.5 Transformers Different electrical devices require different amounts of electrical energy to operate. An electric stove requires a lot of electrical.
G1 to G1b LOW VOLTAGE Schematic to Pictorial. You will now draw the Pictorial by following the Schematic.
TEKS 5.6B Demonstrate that the flow of electricity in circuits requires a complete path through which an electric current can pass and can produce light,
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
22.3 Inductance pp Mr. Richter. Agenda  Warm Up  Notes:  Mutual Inductance  Transformers.
Electrical Safety, Subpart K
E. Follow-up discussion on Parallel CT clarification per SMOG (e) (H. Perez) SMOG (e) Paralleling of Current Transformers – Connected burden.
EM InductionInduction 1 Basic definitions Electromagnetic induction : generation of electricity from magnetism Michael Faraday Next Slide Michael Faraday’s.
Single-Phase Transformers Prepared By: Chadarana Jigna( ) Gandhi Disha ( ) Kanani Mital ( ) B.E SEM : 3 Subject:- Electrical.
Craig T. Riesen Energy Workshop II 1 Electricity & Generation Basics of Electricity and Electrical Transmission Transmission Generation electrons.
Electrical Circuits Chapter 20 Section Three. Science Journal Entry #42 Expound upon Ohm’s Law and its relationship to current, resistance, and voltage.
Protection of Power Systems
REDA Production Systems
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
D.C. Machine & Transformer Topic: Instrument Transformer Electrical:-1 presented by: Jill Chauhan ( ) Chirag Agarawal ( )
1 :. Introduction These are special type of transformers used for the measurement of voltage, current, power and energy. As the name suggests, these transformers.
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
Advanced Meter School August 18-20, 2015 INSTRUMENT TRANSFORMER SIZING 2015 David L. Johnson.
COMMUTATION-Methods to improve Commutation. ITM UNIVERSE,VADODARA  Name-Anushka Singh  Enroll. No  Branch- EC  Semester-3  Subject.
HNC/D Engineering Science
Sensor presentation.
Topics covered in this presentation:
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TITLE : TESTING OF CURRENT TRANSFORMER AND VOLTAGE TRANSFORMER PREPARED BY : JOBIN ABRAHAM.
MAGNETISM AND ELECTROMAGNETISM
Associated Hazards and Safety Practices
EZCT TURNS RATIO TEST The EZCT’s use the “Voltage Method” to determine the CT Turns ratio The ideal connection is shown in this illustration.
The Safe Use of Electricity
Magnetism 1.
5.6 (B) demonstrate that the flow of electricity in circuits requires a complete path through which an electric current can pass and can produce light,
Electromagnetic induction
Electrical components and systems
Difference between Earthing & Grounding
TEKS 5.6B Demonstrate that the flow of electricity in circuits requires a complete path through which an electric current can pass and can produce light,
MAGNETISM AND ELECTROMAGNETISM
Presented by: HJ Arnett Industries, LLC
Instruments & Electrical Measurements Lecture 10
Presentation transcript:

Field Problems with Instrument Transformer Installations ElectriCities of North Carolina Advanced Meter School James Whitaker Greenville Utilities Commission Mark Wells Town of Tarboro

Current Transformers Proportionally steps down the current level in the meter circuit Isolates meter personnel and metering equipment from high current flow

FORM 9S WIRING DIAGRAM USING ONLY CTS SOME UTILITIES MAY USE ONLY CTS AND NO VTS THIS IS BY PREFERENCE OR POLICY THE BILLING MULTIPLIER WILL BE DETERMINED BY THE CT RATIO

Voltage Transformers A voltage transformer or VT steps down higher voltage by some ratio to a level that is safer and more practical to meter.

FORM 9S WIRING DIAGRAM USING VTS & CTS THIS DIAGRAM USES SECONDARY VTs TO STEP DOWN THE VOLTAGE TO 120V CTs ARE ALSO USED THE BILLING MULTIPLIER WILL BE A COMBINATION OF VT AND CT RATIO

CT PROBLEMS CT POSITIONED BACKWARDS ON PRIMARY CONDUCTOR THE METER WILL RUN BACKWARDS ON THIS PHASE

ANOTHER CT PROBLEM WIRING REVERSED AT SECONDARY SIDE OF CT SAME EFFECT AS THE PREVIOUS SLIDE, REVERSE ROTATION ON THIS PHASE

CT IMPROPER WIRING POLARITY REVERSED TEST SWITCH CONNECTIONS SAME THING, REVERSE ROTATION ON THIS PHASE

CT INSTALLATION ISSUES CT SHORTING BAR LEFT IN THE CLOSED POSITION NO MEASURERMENT OF CURRENT ON THIS PHASE

LOOSE SCREW ? CT CIRCUIT SHORTED NO OR LOW USAGE ON THIS PHASE

OPEN CT CIRCUIT BROKEN OR BURNED CT WIRING BROKEN NEUTRAL CAN RESULT IN NO REGISTRATION AT ALL AGAIN, NO MEASUREMENT ON THAT PARTICULIAR PHASE POSSIBLE DAMAGE TO CT

OPEN VOLTAGE CIRCUIT BROKEN VOLTAGE WIRING BAD VT = NO VOLTAGE NO MEASUREMENT ON THIS PHASE

POSSIBLE TAMPERING OPEN TEST SWITCHES ON CURRENT OR VOLTAGE SIDE NO MEASUREMENT OF CURRENT ON THESE TWO PHASES

LOCKS HELP USE SOME TYPE OF METER BASE LOCKING DEVICES

BILLING PROBLEMS BILLING MULTIPLIER CT RATIO 200:5=40 VT RATIO 288:120=2.4 40 X 2.4 = 96

WHAT IF ? INSTALLATION CREW GIVES INCORRECT INFORMATION TO THE BILLING DEPARTMENT SERVICE UPGRADE, CTS ARE CHANGED TO A HIGHER RATIO AND THE CHANGE NEVER GETS TO THE BILLING DEPARTMENT BILLING MULTIPLIER IS WRONG!! LOSS OF REVENUE

NEW MULTIPLIER SERVICE AND CT UPGRADE PREVIOUS BILLING MULTIPLIER WAS 96 (40X2.4=96) NEW CTS 600:5 USING THE SAME VTS WHAT IS THE NEW MULTIPLIER? 600:5=120 X 288:120=2.4 (120 X 2.4=288) NEW BILLING MULTIPLIER IS 288

LOSS OF REVENUE ALL OF THESE EXAMPLES AND MANY OTHER PROBLEMS CAUSE A TREMENDOUS AMOUNT IN REVENUE LOSS EACH YEAR WHAT CAN YOU DO TO CORRECT THIS PROBLEM?

CT TEST PROGRAM CHECK NEW INSTALLATIONS AS WELL AS ANY UPGRADES AS THEY ARE DONE. THIS IS WHEN A LOT OF ERRORS OCCUR AND THEY ARE HARD TO CATCH BECAUSE THERE IS NO BILLING HISTORY HAVE A TEST SCHEDULE TO RECHECK CT INSTALLATIONS PERIODICALLY

SAMPLE FIELD TEST WIRE VERIFICATION CT RATIO AND ACCURACY METER ACCURACY TOTAL SYSTEM ACCURACY

QUESTIONS ?