SmartMeter Status Report For December, 2011 (Prepared January, 2012) Work Plan Deliverable Continue the general meter deployment in the Coastal Region.

Slides:



Advertisements
Similar presentations
TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
Advertisements

What we do Larotecs Web2M is an off-the shelf, end-to-end, web-based solution designed to manage multiple widely distributed devices.
Where is IT Asset Management in ITIL? Nicole Conboy, NCA IT Service & Asset Management Consultant.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
11 Rate Design to Complement AMI Implementation in Danville, Virginia Presentation by Denise Sandlin Support Services Director Danville, VA APPA 2009 Business.
© 2013 Rainforest Automation, Inc.. 2 Who We Are ● Founded 2004; based in Vancouver, BC ● Focused on Real-Time Energy Feedback and Control ● Deep communications.
DoD’s FPDS-NG Training Day Project Overview and Status 20 April 2006 Business Transformation Agency.
2 Breakout Session # 1411 Robert F. Watts, Senior Consultant, ESI International Date: April 16 Time: 2:40 – 3:40 PM Buying Results Through Service Level.
1 HON Introduction Honeywell Confidential Today’s Economic Realities Civic leaders face many issues… Improving productivity Improving safety & security.
Team 01: PICA Power Information Collection Architecture Amy Ball (EE), Kendrick Wiersma (EE), Nate Jen (EE), Avery Sterk (EE)
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
EPRI Smart Grid Demonstration and CIM Standards Development
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
LECTURE-6. Lets remember What do mean by Objectives ? What about Nature of Objectives And Business Sub-System LECTURE-5 OBJECTIVE OF TODAY’S LECTURE Today.
High-Level Assessment Month Year
Advanced Metering Infrastructure
American Electric Power (AEP) Virtual Power Plant Simulator (VPPS) Tom Jones, Manger – Corporate Technology Development American Electric Power Grid-InterOp.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Solar Metering and Performance Monitoring Exposition June 4, 2007.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April/May 2012.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – January 2013.
© 2006 Jupitermedia Corporation Webcast TitleSuccessful Rollout Planning 1 January 19, :00pm EST, 11:00am PST George Spafford, President Spafford.
Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma.
May 2014 Zimele Technologies Customer convenience through mobile MDMS applications.
SOE and Application Delivery Gwenael Moreau, Abbotsleigh.
Oregon’s Road Usage Charge Program - SB810 Implementation 2015 AASHTO Audit Conference July 21, 2015.
Public Safety Radio System Upgrade County Administration / Public Safety November 23, 2010.
Challenges Faced in Developing Audit Plans and Programs 21 st March, 2013.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – February 2012.
King George Wireless Authority Joseph W. Grzeika Chairman King George Board of Supervisors.
SMART METER TEXAS Status Update July 29, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
Configuration Management T3 Webinar Feb 21, 2008 Chuck Larsen ITS Program Coordinator Oregon Department of Transportation.
1 Jon Sudduth Project Engineer, Intelligent Grid Deployment SWEDE April 26, 2011.
CONTENTS 1. Introduction 2. Smart Metering System 3. How does the system work? 4. Advantage of AMR system Electric company benefits.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
SCSC 311 Information Systems: hardware and software.
SMART METER TEXAS Status Update June 3, AGENDA Release 1 Smart Meter Texas Online Portal Update – SMT Solution Update – Registration Statistics.
Seattle City Light – AMI Business Case Results
UNICEF’s work and planned activities for the production of data on children with disabilities Claudia Cappa, Data and Analytics Section, UNICEF, NY.
The Secrets to Successful AMI Deployment – The Ontario Experience Paul Murphy, President & CEO Independent Electricity System Operator February 19, 2007.
AMI project for Israel Electricity Corporation
September 22, 2010 LIOB Meeting Independent Evaluation of PG&E’s Electric SmartMeters™ Structure Consulting Group, LLC. provided report at September 2,
© Mahindra Satyam 2009 Configuration Management QMS Training.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
© 2010 VMware Inc. All rights reserved vSphere 4.1: Install, Configure, Manage.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
MARS Taskforce RMS Update November 16, AMS Meter Installation Status Report Oncor (approximately): Installed: 2,190,927 as of Deployment.
Spotlight: Personal Natural Resource Consumption Profiler Younghun Kim, Zainul Charbiwala, Akhilesh Singhania, Thomas Schmid, Mani B. Srivastava Networked.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
An Overview of the Smart Metering Programme in GB.
11 PUBLIC HEARINGS ON CONDITIONAL GRANTS AND CAPITAL EXPENDITURE 2008/2009 PARLIAMENT 27 AUGUST 2008.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – December 2012.
MARS Taskforce COPS Update August 10, Definitions AMC – AMS (IDR) meter type settled using the 15-Minute LSE data received from TDSP AMDG – 15 Minute.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – March 2012.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – August 2012.
Automating Work Order Processes for Advanced Metering Infrastructure (AMI) Devices with Collector for ArcGIS and Portal for ArcGIS Subrahmanyam Pendyala.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April 2013.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
Blue Mountain Quality Resources, Inc. Global Compliance and Standardization with an Enterprise CMS Jim Erickson, President Blue Mountain Quality Resources,
Small Cell Networks Market to Global Analysis and Forecasts by Small Cell Type, Operating Environment and by Service No of Pages: 150 Publishing.
SCADA For DG Sets Management for TMTL
Chapter 1 Computer Technology: Your Need to Know
SmartMeterTM Steering Committee Update – March 2013
MBIE arrangements for finalising remaining technical regulatory settings in the Telecommunications (New Regulatory Framework) Amendment Act, 2018 Presentation.
SmartMeterTM Steering Committee Update – February 2013
Presentation transcript:

SmartMeter Status Report For December, 2011 (Prepared January, 2012) Work Plan Deliverable Continue the general meter deployment in the Coastal Region. Continue “clean up” of remaining installation exceptions in the other regions. Continue network component installation in the South Region. AMI Meter Deployment SummaryTGB (Network) Deployment SummaryUpcoming Month’s Rolling Deliverables Summary of the Month’s Accomplishments During the month, a total of 22,751 Smart Meters were installed. Year to date, 551,897 Smart Meters have been installed. General meter deployment continued in the Coastal Region. One (1) new TGB was installed. The TGB was located in the Coastal Region and was the last to install in that region. Testing of the new RNI software continued. Upcoming Activities Meter Status No. of Meters Region(s) Total Number of Meters Installed 2,173,466 Metro Regions Northeast Northwest West Central In Production (Used For Billing) 2,148,720 Total GPC Meters2,441,039 Total Company (Current Month) AMI As A Percent of Total GPC Meters 89% TGB Status (On Preparation Date) No. of TGB’s Region(s) Total Number of TGB’s Commissioned 192 Metro Regions, Northeast, Northwest, West, Central, East, Coastal, and Southern Number of TGB’s Currently Planned 218 Total Company by 2012 Percent of TGB’s Installed 88% Summary of Meter QualitySummary Of Overall Project Completion Meter Deployment Completion Status Project Areas (See Map On Reverse) Completed Metro West, Metro North, Metro East, Metro South, Northwest, Northeast, Central, West, and East Regions In ProgressCoastal Region (Springfield). Upcoming Twelve Months Coastal Region (Springfield and Savannah, through May), and South Region (through August). Beyond Twelve MonthsProject complete. Type Test Low (<98%) Within Limits (98% to 102%) High (>102%) New meter incoming quality test Existing in-service meters tested for re-use Initiated by metering systems 3124 Customer-requested test (AMI) 0110 Customer-requested test (non-AMI) 000 Total Continue meter deployment in the Coastal Region. Continue installation of TGB network components in identified areas that need additional coverage as well as the site acquisitions for 2012 TGB schedule. Continue testing of new RNI software.

Glossary of Terms AMI/SmartMeter – Advanced Metering Infrastructure; describes the complete system to collect customer energy usage, including the meters, towers, and communication systems. A-Men—Also called Metermen; a classification of meter technicians used to install and maintain the more complex meters. ItronEE – A meter data management system used to collect, validate and prepare all meter data for billing. Metadigm– Metadigm Services, Inc., the installation contractor for most meters (formally Lynn Edwards Professional Services, Inc.). Meter Test – Three types of tests are applied: 1) an Incoming Quality Inspection is used upon receipt of meters from the factory to verify their accuracy and basic functionality. 2) A In- service test is applied to meters that have been previously installed at a premise, but before any subsequent installation to verify the meter continues to be accurate. 3) A Customer- requested accuracy test using NIST traceable standards in a metering test van is performed when consultation, audits and comparison tests do not satisfy the customer’s concern. In all tests listed above, meters shown to be registering less than 98% or more than 102% of true accuracy are removed from service. RNI – Regional Network Interface, the servers used to control the operation of the AMI system and to provide limited storage of meter and end point data. TGB – Tower Gateway Base Station, a key network component usually located on a cell tower or pole. The TGB receives data from the meters and other end point devices and is also used to communicate commands from the RNI. Meter Deployment Plan Issues Expected to Result In Material Cost Increases Or Overall Schedule Delays  None Current Challenges  Test and implement next level of cyber-security.  Continue to monitor Smart Meter issues in other states.  Continue to respond to customer concerns on an individual basis (approximately 350 YTD). SmartMeter Status Report For December, 2011 (Prepared January, 2012)