Ex-ante state aid control initial assessment of the planned state aid performed by the Ministry of Finance.

Slides:



Advertisements
Similar presentations
State aid and Structural Funds Carlos Tenreiro DG Competition Brussels 9 April 2003 DG Competition.
Advertisements

Management verifications Franck Sébert European Commission DG Employment, Social Affairs and Equal Opportunities.
European Union Cohesion Policy
Subsidy Contract Lead Partner seminar October 2008, Riga Arina Andreičika Managing Authority
Single Audit Strategy LATVIA. Audit System The Audit Authority functions are carried out by the Internal Audit Department of the Ministry of.
Arrangements regarding ECP 2014–2020 implementation 1.Implementation of the Republic of Slovenia Budget Act Specific section for the period:
Brussels, 12 July 2006 Klaus-Otto JUNGINGER-DITTEL State aid rules and programming of Structural Fund’s programs for
30. Conference of Directors of EU Paying Agencies Workshop1: The possibilities for optimizing the processes of implementation of direct payments Agency.
EU: Bilateral Agreements of Member States. Formerly concluded international agreements of Member States with third countries Article 351 TFEU The rights.
1 / LiveLink number Passenger Land Transport in Portugal: Improving Competition by Legislative Reform José Luís Moreira de Silva Ana Pereira de Miranda.
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
Implementation of Leader Axis measures by Jean-Michel Courades AGRI-F3.
Info Day on New Calls and Partner Café Brussels, 10 February 2011 How to apply: Legal Framework – Beneficiaries – Application and Selection Procedure.
1 Swiss-Slovak Cooperation Programme April SWISS-SLOVAK COOPERATION PROGRAMME  New possibilities of financial support for the 10 new member states.
Public Procurement in the Republic of Cyprus By: Theodosis Tsiolas Public Procurement Directorate Treasury of the Republic.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Regional Policy Major projects approval process in Brendan Smyth DG REGIO.
Analysis and Elaboration of a Unified Methodology for Projects that within Five Years from the Completion of Operation have Undergone Substantial Modifications.
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
PUBLIC SECTOR FINANCIAL CONTROL OF THE REPUBLIC OF LITHUANIA By Ms Daina Vaivadienė Chief Specialist of the Internal Audit and Financial Control Methodology.
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Legal framework:
1 ACCREDITATION – BG situation April 2014, Prague STATE AGENCY STATE AGENCY FOR METROLOGICAL AND TECHNICAL SURVEILLANCE TECHNICAL SURVEILLANCE 1.
The concept of State aid – Definition NB: De verstrekte informatie geeft de mening van de auteur weer en kan niet beschouwd kan worden als de officiële.
Regional Policy Major Projects in Cohesion Policy Major Projects Team, Unit G.1 Smart and Sustainable Growth Competence Centre, DG Regional and Urban Policy.
Provisional FP-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 1. The Rules of the Programme.
Managing Authority of EU Funds – Ministry of Finance 1 Methodology of selection of project applications for EU funds including preparation of appraisal.
Institutional structures for Structural Funds assistance Ministry of Finance September 10, 2003.
Determining the applicable national social security scheme An overview of the main rules in Regulations n° 883/2004 & 987/2009, …but also in Regulations.
Information on first level control, national eligibility rules and national co–financing provisions for European Territorial Cooperation programmes in.
1 Homologues Group Meeting Slovenia, October 2009 Republika SlovenijaEuropean Union Ljubljana, October 2009 EC rules on state aid Ljubljana,
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
State Aid - An Introduction Stephen Martin Scottish Government State Aid Unit.
Directive on the Authorisation of electronic communications networks & Services Directive (2002/20/EC) Authorisation Directive Presented by: Nelisa Gwele.
Communication Temporary framework for State aid measures European Commission DG Competition 21 January 2009.
Structural Funds Managing Authority – Ministry of Finance 1 Technical Assistance Ilze Aleksandroviča Head of Control and Development Division EU Funds.
Initial eligibility assessment and ex-post monitoring of State aid in EU funds co-financed projects.
Ministry of Education, Research and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism GR07 Research within.
Structural Funds in Ireland Structural Funds in Ireland Financial management, Financial management, control & audit - Ireland Dermot Byrne Head of Unit.
EMTA General Meeting Prague May 2012 Round table on PSO Regulation 1370/2007 “Two years after enforcement, where are we? How efficient is the regulation?
Dace Berkolde Director State Aid Control Department Ministry of Finance Latvia 1.
Simplified Cost Options Impatto della semplificazione sulle attività dei controlli Francisco MERCHÁN CANTOS Direttore Audit DG EMPL Firenze, 21 novembre.
S&E and BMW Regional Operational Programmes 14 – 20 Training for Local Authorities involved in DUCGS projects, 21st April 2016 REPORTING, DATA COLLECTION.
STATE AID MONITORING & INVENTORY CASE STUDY The Romanian Story on State Aid Kyiv February 25 th, 2016 Stefan S ă b ă u Competition & State Aid Attache.
Leader Subcommittee: Focus Group 1 Leader implementation models in the programming period Rome, 24 March 2010 Jean-Michel Courades DG Agriculture.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 6 – Company Law Bilateral screening:
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Financial management system of structural funds. Entities involved in financial management system Managing Authorities (MA) Managing Authorities (MA)
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
Managing Authority of EU Funds – Ministry of Finance 1 Selection of Project Applications for EU Funds in the Programming Period Linda Barbara.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 11 – Agriculture and rural development.
competition rules in inland transport
Marek Stavinoha Legal officer DG MOVE A4 European Commission
Transnational training seminar for potential Lead Partners and Partners to INTEREGG IIIB-CADSES procedures for 3° call for proposal CADSES implementation.
Public Participation in Biofuels Voluntary
EUROPEAID/121737/D/SV/RO - Training in Project Cycle Management, Procurement and Contracting of Pre-Accession Projects and Management of EU Structural.
State aid in the fishery and aquaculture sector
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
PRESENTATION OF MONTENEGRO
4.4 Procurement by grant beneficiaries
Drafting the Guidelines for applicants
PRESENTATION OF MONTENEGRO
The Mutual Recognition Regulation
UA – Same biocidal product SPC translation review
INTERREG IPA CBC “GREECE ALBANIA ”
INTERREG IPA CBC “GREECE ALBANIA ”
“State aid and EU funding – Are they compatible?”
Academic Year Prof. Pietro Boria
State aid in the field of Energy: challenges
Pedro Cruz Yábar Brussels, 21st June 2016
The EDPS: competences and processing of personal data in EU funds
Presentation transcript:

Ex-ante state aid control initial assessment of the planned state aid performed by the Ministry of Finance

Insurance that only legal and compatible state aid is granted in Latvia Planned new aid measures and planned amendments/ modifications in existing aid measures shall be submitted to the Ministry of Finance for the initial assessment Assessment is made to identify as to whether planned measure: -qualifies as state aid according to Article 107(1) of the TFEU -includes all the obligatory state aid requirements required by the respective EC state aid rules -shall be notified to the Commission in accordance to Article 108(3) of the TFEU or is exempted from the notification obligation

Elaboration of aid measures: Obligatory State aid requirements to be included in state aid scheme/ individual aid Objective Eligible activities Aid form Eligible expenditures Maximum aid amount per project, applicable procedures for big projects (for certain objectives) Applicable aid intensity Non-eligible sectors & sectors with special requirements Cumulation of aid Duration of aid (from – to)

Procedures to be complied with to grant lawful state aid Submission of the notification to the EC Article 108(3)TFEU – applicable for all cases where state aid is granted in accordance to state aid guidelines, frameworks, etc. Exemption from the prior notification Regulation 800/2008 (set of horizontal objectives) – submission of summary information to the EC Regulation 1370/2007 (transport public services – rail, bus, tram) – no procedure to be followed Decision 842/2005 (other public services) - no procedure to be followed Regulation 1998/2006 (de minimis aid) - no procedure to be followed

Submission of the information to the EC (in schema) European Commission Latvian Permanent Representation to EU Ministry of Finance, State Aid Control Department  initial assessment Line MinistriesMunicipalities

Implementation of a state aid measure and control of compliance Granting of an aid Controlling of an aid Aid scheme/ project - Includes all minimum required requirements - Procedural requirements complied with respect of notification/ summary information submission to the EC Contract for granting an aid - Includes all minimum required state aid requirements established in aid scheme/ project Actual implementation of a project - Done in compliance with the contract and aid scheme/ project requirements Legal aid and compatible measure - ex-ante assessment requirement respected

Different steps of state aid control Ex-ante state aid control is followed by the implementation of planned state aid measure, where project application is cross-checked for eligibility under state aid measure (scheme/ project) Ex-post monitoring of state aid is performed by the aid granting authority (on-the-spot, interim and final checks)