Optics for x-ing IR Andrei Seryi November 5, 2004.

Slides:



Advertisements
Similar presentations
Wire scanners MDW chicane energy collimator 3 MPS collimators in this region end of linac Damage Simulation in MPS Collimators L. Keller Apr. 9, 2006.
Advertisements

1 Collimation Simulations and Optimisation Frank Jackson ASTeC, Daresbury Laboratory.
Emittance dilution due to misalignment of quads and cavities of ILC main linac revised K.Kubo For beam energy 250 GeV,
Emittance dilution due to misalignment of quads and cavities of ILC main linac K.Kubo For beam energy 250 GeV, TESLA-type optics for 24MV/m.
Collimator Damage Adriana Bungau The University of Manchester Cockcroft Institute “All Hands Meeting”, January 2006.
Zero Degree Extraction using an Electrostatic Separator Take another look at using an electrostatic separator and a weak dipole to allow a zero degree.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
January 2004 GLC/NLC – X-Band Linear Collider Peter Tenenbaum Beam Dynamics of the IR: The Solenoid, the Crossing Angle, The Crab Cavity, and All That.
MERLIN 3.0 only considers first order (dipole) modes. Kick is linearly proportional to offset. For offsets close to the axis this is a reasonable approximation.
Crab cavity location for 2-mrad x-ing December 7, 2004 A.S.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
November 2005M. Woodley1 ILC Beam Delivery System layout with end-of-linac undulator.
Bunch compression in the ATF2 M. Pivi, A. Seryi, P. T. February 15, 2005 SLAC Feb 2005.
1 August 12, 2005 Running 2mrad IR in e-e- mode: BDS constraints A.Seryi August 12, 2005.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Proposed machine parameters Andrei Seryi July 23, 2010.
BDS at reduced beam parameters 2nd Baseline Assessment Workshop on Reduced Beam Parameter set Andrei Seryi John Adams Institute 19 January 2011.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
1 IR with elliptical compensated solenoids in FCC-ee S. Sinyatkin Budker Institute of Nuclear Physics 13 July 2015, CERN.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
Optimization of L(E) with SB2009 Andrei Seryi, for BDS and other working groups LCWS 2010 / ILC 2010 March 28, 2010.
N.Solyak, RTMLALCPG 2009,Albuquerque, Oct.2 1 ILC RTML Upgrade in SB2009 Nikolay Solyak Fermilab.
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
SuperB Lattice Studies M. Biagini LNF-INFN ILCDR07 Workshop, LNF-Frascati Mar. 5-7, 2007.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Collimator design and short range wakefields Adriana Bungau University of Manchester CERN, Dec 2006.
Collimation Baseline Configuration and Collimation Studies Frank Jackson ASTeC Daresbury Laboratory.
PROBLEM 1 Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
Review Layout of E- Linac Side of Central Region for Feb 10,2011 Meeting For E+ use Norbert’s data from CF&S meeting 12 th July, 2010, which has coordinates.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Wakefield effect in ATF2 Kiyoshi Kubo
FFAG 4-Bend Injection Line into EMMA C. Johnstone, Fermilab EMMA phone conference July 24, 2007.
G.Kurevlev - Manchester meeting1 Collimators Material Damage Study Previous results In our group - Adriana Bungau’s thesis - heat deposition on.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
Near IR FF design including FD and longer L* issues
Collimation Simulations and Optimisation
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
For discussion of Final Focus and IR of plasma-based collider
Large Booster and Collider Ring
2nd Workshop on a Super B-Factory INFN-LNF, Frascati, Italy
ILC Baseline BDS Collimation Depth Calculations
NEW DESIGN OF THE TESLA INTERACTION REGION WITH l* = 5 m
Updates on IR and FF for super-B factory
Progress activities in short bunch compressors
First look at final focus part of super-B factory
LHC (SSC) Byung Yunn CASA.
Collimation Optimisation
Final Focus optics for Possible New B-Line
S.Kuroda ( KEK ) Final Focus Optics Collimeter Final Doublet
Direct Hits on Titanium Alloy Spoilers
Raimondi-Seryi Final Focus for e+e- Factories?
Super-B Factory in a “4400m” Tunnel
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
ILC Beam Switchyard: Issues and Plans
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
100th FCC-ee Optics Design Meeting
Presentation transcript:

Optics for x-ing IR Andrei Seryi November 5, 2004

SP2 SP4 SP3 FD phase IP phase SP1 NLC optics w. consumable b-spoilers Low betas good for tolerance No high-beta point 90 degrees from high-beta in FF

Lew Keller’s FLUKA results For a beam area of approximately 500 u**2, FLUKA gives for 1 bunch (2e10/bunch for both 250 and 500 GeV/beam) in 0.6 RL Ti E = 250 GeV del_T = 650 deg 22u x 22u E = 500 GeV del_T = 700 deg ________________________________________________ E = 250 GeV del_T = 590 deg 70u x 7u E = 500 GeV del_T = 660 deg Fracture limit is 770 deg. The above values don't take into account the increase of specific heat with temperature

ILC version w. survivable b-spoilers High-beta point 90 degrees from high-beta in FF (kick -> offset in sextupoles)

SP2 SP4 SP3 FD phase IP phase X:  /2 Y:  /2 

Beam size at spoilers Consider b-coll with beta x,y=600,1200m For beam emittance 10x0.03E-6m it gives 950 u**2 at 250 GeV, and 474 u**2 at 500 GeV It looks that the betatron spoilers survive 2 bunches at 250 and one bunch at 500 (if charge is 2e10 in both cases) On the energy GeV, y-size is 26u, x-size is 67u, plus x dispersive size 140u (with 0.2m dispersion and dE/E=7E-4 ) –=> E-spoiler is safe, and E-collimation may even be shortened

SP2 SP3 FD phase IP phase ILCFF6.mad

Turtle tracking results