CLB meeting APC Tentative action/work list.

Slides:



Advertisements
Similar presentations
CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

Quality Improvement and Control System QuIC ILYA NIKANOROV
Managing Your Organisation’s Portal Team Account Tutorial 7.
Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
26 February 2002ATLAS Muon Electronics Meeting1 MROD: the MDT Read Out Driver Status of MROD-1 Prototype Adriaan König University of Nijmegen.
October 8, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Procurement Processes SAP Implementation
Welcome all Math Coaches!!! Please meet with your Regional PLT groups until 9:40.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
Configuration Management Process and Environment MACS Review 1 February 5th, 2010 Roland Moser PR a-RMO, February 5 th, 2010 R. Moser 1 R. Gutleber.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
P. Jansweijer Nikhef Amsterdam Electronics- Technology October 15, 20091VLVnT-09 Athens Measuring propagation delay over a coded serial communication channel.
Agenda Process Flow Design and Platform Configuration
February 26, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
August 06, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Pre-OTS Testing in Penticton Sonja Vrcic Socorro, December 11, 2007.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
Report writing final report fall Agenda Each group make a short presentation of their project addressing the challenges of the project Feedback.
September 11-12, 2013KM3NeT, CLBv2 Workshop Valencia Peter Jansweijer Nikhef Amsterdam Electronics- Technology Shore station brainstorm 1.
A Systematic Approach to the Design of Distributed Wearable Systems Urs Anliker, Jan Beutel, Matthias Dyer, Rolf Enzler, Paul Lukowicz Computer Engineering.
Mercury. One single online platform: Mercury Highlights – USP’s Web-based platform: accessible from any computer in any location without installing any.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
January 28, 2015CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Developing Flipped Learning Experiences Date: Time Instructor Name Click the microphone icon at the top of the Audio & Video window to enter the Setup.
VLV T – Workshop 2003 Read Out and Data Transmission Working Group Synchronous Data Transmission Protocol for NEMO experiment.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
July, IFIC (CSIC – Universidad de Valencia) CLB: MULTIBOOT 1.
January 28-30, 2014KM3NeT, Electronics Workshop A‘dam Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Online Control and Configuration KM3NeT Design. KM3NeT Detection Units VLVnT2011 S. Anvar, CEA Irfu Saclay – KM3NeT 2.
Receiving 91 PB this week: A little bit more of work load! (We will be for a while production guys :) Test bench separated in two parts: 1.- The PB will.
CERN F. Alessio & R. Jacobsson CERN LHCb Electronics Upgrade Meeting, April 15, LHCb Upgrade Front End  Back End Readout Architecture Proposal.
NIKHEF 2014 David Calvo IFIC (CSIC – Universidad de Valencia) Time to Digital Converters for KM3NeT Data Readout System.
December 10, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
Agenda 1. Key Activities, Accomplishments and Status 2. Meeting Notes and Action Items.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Peter Jansweijer Nikhef Amsterdam Electronics- Technology September 14, 2012KM3NeT, CLBv2 Meeting via EVO KM3NeT CLBv2 1.
29 Oct, 2014 IFIC (CSIC – Universidad de Valencia) CLB: Current status and development.
LM32 DEVELOPMENTS ONGOING WORK ON TDCs AND OTHER ISSUES (LM32) Diego Real David Calvo CLB group online meeting, 27 March
J-W Schmelling Nikhef Amsterdam Electronics- Technology of January PPM-DU optics for KM3NeT Collaboration meeting Marseille PPM-DU: A three.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Peter Jansweijer Nikhef Amsterdam Electronics- Technology November 21, 2012KM3NeT, CLBv2 Meeting via EVO KM3NeT CLBv2 1.
CLBv2 issues Diego Real 5 March A SVN repository created for KM3NeT svn+ssh://isvn.ific.uv.es/repos/KM3NeT.
Agenda Mededelingen PMT – Measurements of Hamamatsu PMTs, Erwin – New persons Dorothea – Test area, euipment, etc. VEOC/String – debriefing meeting at.
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
Agenda Mededelingen – equipment for rope stretch test arrived – ropes SK78 40 m for tests arrived – rope DM20 offer asked (6 x 1 km) (1 euro / m, deliverty.
Peter Jansweijer Nikhef Amsterdam Electronics- Technology September 19, 2012KM3NeT, CLB/DAQ Videocon KM3NeT CLBv2 1.
July 31, 2013KM3NeT, CLBv2 Meeting Peter Jansweijer Mesfin Gebyehu Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
October 29, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
P. Jansweijer Nikhef Amsterdam Electronics- Technology Amsterdam July 5-6, 2010KM3NeT: General WPF/L meeting 1 Measuring time offset over a bidirectional.
Off & On Shore Electronics overview KM3Net APC Paris 05 / 09 / 2012 Frédéric LOUIS.
BSA 385 Week 4 Individual Assignment Frequent Shopper Program Part 3 For the items specified in the technical architecture document developed for the Frequent.
2 protos in MASER (One in Valencia, One sent to Nikhef)
“FPGA shore station demonstrator for KM3NeT”
Testing Multimedia Products
STANDARD WR STRAW-MAN ARCHITECTURES FOR PHASE II & WRS RELIABILITY
DOM integration meeting
KM3NeT institute board meeting
TTC System Status May 2007 System overview Production Status
The DAQ and IT infrastructures of KM3NeT
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Characteristics of Reconfigurable Hardware
Functionality Calibrates Bump Tests Charges Prints certificates
Selecting Your Year 9 Options
Presentation transcript:

CLB meeting APC Tentative action/work list

Overview with CLB-related items and currently assigned names CLB in PPM-DU – IFIC, Diego – Nikhef, Maarten – Demokritos, Tassos – Saclay, Frederic FPGA choice – IFIC, Diego Real – IFIC, David Calvo – Nikhef, Peter Jansweijer CLB layout – Nikhef, Calibration/instrumentation – ECAP, Robbert – IFIC, Diego Data format – Nikhef, Maarten Test setups for DOM production – APC, Christian Seafloor network – CPPM, Patrick Organisation – Nikhef, Leo and Els

CLB in DOMs for PPM-DU Organisation tests of Valencia-CPB (Diego) Firmware / Data format for PPM-DU (Maarten) Order of test crate (for 1 DOM) to be made by Saclay: – Already interest from Valencia (Diego) APC (Antoine) Nikhef (Ruud) Genova (Marco D’A) ECAP? (Uli) – Inventory to be made complete (Tassos) – Price to be provided (Frederic)

CLB functionality Defined by Saclay’s CLB prototype Documentation at wiki: Frederic

In the following slides Results of the discussion on the CLB-meeting of 5 September in APC In yellow boxes the work to be done In the white boxes: names of institutes/persons working on the work specified in the yellow boxes In the with boxes: the targeted delivery date Please, note that this is a tentative list of names (which is to be verified) Please, add institutes/names where applicable

FPGA requirements Operating system (processor?) Power consumption Costs Clock extraction TDC channels TDC resolution/serial link speed Dynamic reconfiguration  Documented FPGA choice Names: IFIC, Diego Real Nikhef, Peter Jansweijer APC, Cédric Champion When: 1 October 2012

Check of FPGA choice Buy evaluation board Check TDC implementation Check synchronisation  Verified FPGA (Note: CLB board layout starts already earlier) Names: IFIC, David Calvo Nikhef, Peter Jansweijer APC, Cédric Champion When: 1 December 2012

CLB design upgrade Define test interface on-board Justify decision on integration instrumentation vs use of piggy- backs On-shore: mirror of CLB – Instrumentation Setup communication layer+ configuration Explore multiple I2C lines Are all sensors always active: control?  Proto-design CLB Names: IFIC, David Calvo Nikhef, Peter Jansweijer When: 1 December 2012

Data format Define precisely data frame size and data format (impact on DAQ architecture and network) Define timing requirements setting Take into account scalability  Documented data format Names: INFN-Bologna, Simone (?) Nikhef, Maarten When: 1 December 2012

For DOM production Development of test setups for CLB production (Cedric, Christian) Set up of data base for test results Quality management (Christian) Names: APC, Christian Olivettei APC, Cédric Champion When: ….

Seafloor network + DU-foot Detailed inventory of requirements for instrumentation in seafloor network – Calibration units? – Data formats? – CLB in DU-foot? – CLB in each JB? Names: CPPM, Patrick INFN, Riccardo Nikhef, Eric When: 1 October 2012

Organisation Put all information directly on the WPF/L wiki Minutes of all (smaller) meetings on the WPF/L wiki ( erlangen.de/index.php/Electronic_group#WPF.2FL_Meetings) erlangen.de/index.php/Electronic_group#WPF.2FL_Meetings (alternatively, km3net.org  internal  WPF/L wiki  electronic group) (km3net, pyrosoma) The current mailing list can be found at the Indico pages (participants if you enter as manager); must be setup in KM3NeT portal (Els) Video/telcons full group – Bi-weekly first, later more relaxed – Next video-con: 19 September 2012, 10-12h – – Please add anything you want to share/discuss during the meeting to your name

FPGA considerations Pushing data! Revisit timing scheme (White Rabbit) Use tiny-TCP for data to DOM Use UDP from data Open cores in FPGA