XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc.

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
Elec467 Power Machines & Transformers
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
Introduction To Programmable Logic Controllers
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Components, Symbols, and Circuitry of Air-Conditioning Wiring Diagrams
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Digital PECVD Machine Design and Construction Zlatan Ceric William Edwards Timothy Gurtler David Ogden Quan Tran Date:12/10/2010.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
CRYOGENICS AND POWERING
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
© CCI Learning Solutions Inc. 1 Lesson 5: Basic Troubleshooting Techniques Computer performance Care of the computer Working with hardware Basic maintenance.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Magnet Infrastructures and Cavern Layout CLIC Detector WG5, April 1st 2010 Andrea Gaddi Physics Dept. - CERN.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Cryogenics Fault Tree A. Niemi & E. Rogova. Contents 1.Introduction of the current tree structure 2.Failure rates observed in 2015 failure data 3.Unsure.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
BASIC ELECTRICITY AND MAGNETISM
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
S A Griffiths CM42 June 2015 Electrical & Control.
Introduction to W7-X Coil Testing at CEA – Saclay, France G.Croari – March 2008.
Refrigeration of Superconducting Solenoids T W Bradshaw Rutherford Appleton Laboratory Harwell Science and Innovation Campus Didcot, OX11 0QX, UK
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
Teleconf ACS – FREIA 28th March 2017
Final doublet: future activity plan
IT-4189 Supply and installation of a cryogenic distribution system
HFM Test Station Main Cryostat
Status of ELQA equipment and related software
Introduction to W7-X Coil Testing at CEA – Saclay, France
SC1R Cold Box PDR Controls
TEST PLANS for HL LHC IT STRING
Mathew C. Wright January 26, 2009
ILC Experimental Hall Cryogenics An Overview
Hall D Cryogenic requirements
Magnet, Support and Infrastructure
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc coil components (impressions gotten after a visit to SLAC and discussion with W.Craddock) 1)List of the items 2)Solenoid 3)Ancillary equipment 4)Refrigerator and Compressors 5) Controls

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova List of the items 1.The superconducting coil 1.1Cold mass (7.8 t) 1.2Cryostat (3.0 t) 1.3Valve box (0.8 t) 2.Dump resistor (1.2 t) 3.Power supply (5 kA, 20 V) 4.Two racks with controls (0.3 t) 5.Vacuum pumps and related systems 6.Transferline and Quench line 7.Breaker for 5 kA 8.Cables amd misc. Hardware 9.The cold box 10.Compressors 11.Refrig. controls

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The superconducting coil

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The coil has been dis-assembled and it is now mounted inside the transportation tool. There is a point to be fixed with relation to the cold mass blockage in the cryostat. Though the supporting system should be able to hold the transportation loads (3g vertical, 2g axial and 1.5 g lateral), the cold mass was blocked wrt the cryostat. This is documented by photo, not by drawings or engineering reports. Human memory does not help! Same considerations apply for the valve box. Blocking elements not found Status of the sc coil

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of the sc solenoid and its controls The solenoid can be reused. Some care for the transportation (the system for blocking the cold mass, the shield and the valve box shall be reviewed). Sensors on tie rods (strain gages and thermometers) are no more working. The re-assembly on site shall include a replacement of the sensors, a re-alignment of the cold mass, a re-connection of the current leads (with restoration of the electrical insulation). The hardware of the control system includes old instruments (voltmeter, scanner,..). The software is based on an early version of LabView (however SLAC did not use this software). Software and hardware shall be updated by replacing components and implementing new software. My position would be to give a contract to ASG for transporting the magnet, re-assembly it and updating the control system.

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of other ancillaries Dump resistor (0.068  ). No problem for its reuse Breakers. No problem Quench detection. To be re-checked and re-used Pumps. Not checked by me. In principle could be reused Power supply. This component shall be reviewed before deciding its re-use. I would consider to buy a new one. The required ramp rate is max 1.7 A/s (4.3 V + resistive voltage drop). A 10 V - 5 kA power supply (preferably 2 quadrants) would be optimal (200 k€?)

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Cooling system Solenoid heat 4.5 K 50W

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Refrigerator (Liquifier)

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Schematic and working modes Considering the over all heat loads, the cooling capacity exceeds the need of a factor 2.5. Too much? However the presence of further sc devices (IR doublets, spin rotators) suggests to consider this size for the refrigerator.

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova In principle the refrigerator could be reused, but its re- installation and commissioning in Italy would require the involvement of Linde and of the SLAC personnel, who operated the system (the control system was developed at SLAC ). The cost of this operation is presently unclear and involves a lot of expert manpower (I can guess k€). There are risks for using a machine now 15 years old, to be operative for further 15 years. The screw compressors shall be replaced (300 k€). Alternative is a new refrigerator of similar size (2.5 M€). May be a factor 3-4 on cost but limited or no risks. Advice: Set up a small group of experts for evaluating these options asap. Refrigerator reuse

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova There are lots of spare parts for the liquefier including 3 sets (6 total) of spare turbine expanders. The graphical user interface is LabView 7. The PLC programming is RSLogix (ladder logic) from Rockwell software (Allen Bradley) The interface between LabView 7 and RsLogix is RSLinx OEM. For converting and/or update the software the following could be done. 1) Convert LabView 7 to the most recent version or completely rewrite the user interface. 2) Keep the PLC as it is and update the RSLogix and RsLinx. 3) Or replace the PLC with some newer system and rewrite the ladder logic. Much much time and effort was put into constantly revising this logic so it provides a safe operating system with lots of backups and redundancy.. A late comment from Wes Craddock

XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Many components of SC solenoid and refrigerator systems can be reused. Problem (specially for the liquifier) stays in the limited number still available of the expert persons, who designed, built and commissioned the device 13 years ago. The superconducting solenoid group on March 1998