Group Technology HV Plant By: Sakkie van AardeDate: 29-01-2016Slide: 1 of 5 Fault Path Indicators CLARIFICATION MEETING Presented by: Sakkie van Aarde.

Slides:



Advertisements
Similar presentations
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Advertisements

COMPULSORY BRIEFING SESSION Office Space for the RAF Johannesburg branch RAF /2014/00029 Date: 21 November 2014 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032 Date: 15 January 2013 Time: 11:00.
Procurement in PPPs February 27, When do you start thinking about procurement? Preliminary Scoping & teaming Viability assessment Choice between.
Multi-Stage Bidding.
ESOS COMPLIANCE PROCESS 26 FEBRUARY REGULATORY APPROACH.
Government Services How to Respond to a Request for Proposal (RFP) 2006.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
The Threshold Has Changed: Now What Should I do? Presented by Jan Giffin, CPPO, CPPB, VCO Procurement Management Account Executive, DGS/DPS.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031 Date: 15 January 2013 Time: 09:00.
NON-UNIT EMPLOYEE EVALUATION PROCESS
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009 Date: 26 March 2014 Time: 11:00.
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date: 04.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00028 Date: 12 November 2012 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00034 Date: 14 January 2013 Time: 11h00.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00010 Presenter: Anna Mosupyoe, Khongi Molohlanye and Cammy Mkhize Date: 30 January 2012 Time:
Electronic Engineering Department Final Year Projects September 2008.
United Nations Procurement Division
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00001 Date: 17 July 2015 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00029 Date: 07 December 2012 Time: 11:00.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2015/00012(IV) Date: 23 June 2015 Time: 14:00.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
ENQUIRY NO. CORP 3140R CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE DESIGN, MANUFACTURE, TESTING, SUPPLY, DELIVERY AND OFF- LOADING OF ESTIMATED.
ENQUIRY NO. CORP 3035 CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE DESIGN, MANUFACTURE, TESTING AND SUPPLY OF ESTIMATED QUANTITIES OF COMPOSITE,
DRAKENSBERG PUMPED STORAGE SCHEME 29 June Unit 1-3 Generator Stator refurbishment (Tender: PS(DPS)2015/DJ/01) Clarification Meeting 29 June 2015.
Clarification Meeting: Provision of laundry services at the Kendal Contractor’s Village and Wilge Artisan Village 14 August 2015 Tender no: Tender no:
Millennium Challenge Account-Benin II Feasibility Study to Establish a Power Generation Company (GENCO) Pre-proposal Meeting March 30, 2016 Brief Procurement.
CONVEYOR IDLERS CORP 3340 Financial Requirements Presented by: Commercial Finance Date: Thurs 22 October 2015.
GROUP TECHNOLOGY & COMMERCIAL TACTICAL PROCUREMENT PROCUREMENT PROCESS PRESENTED BY MARTHA DE BRUYN 24 NOVEMBER
Environmental Requirements for Supply of inline Gas Filters on GIS balancing pipe Compiled by: Silindile Mbhele.
Teleprotection Equipment Clarification Meeting Tejin Gosai PTM&C 24 th April 2015.
PRE-BID MEETING CONSTRUCTION OF MEDUPI BORUTHO 400kV TRANSMISSION LINES PRE-BID MEETING PROJECT MANAGEMENT Presented by: Theo Meveni 13 January 2015.
The Provision of Facilities Management Services to Eskom Real Estate (ERE) Corporate & Zone office buildings in Gauteng Clarification Meeting on 26 February.
1 WELCOME This is for RFP 7227 ONLY Restrooms Cell Phones Turn on vibrate Take calls outside Sign in sheets – please sign in Conference will focus on.
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
ENQUIRY NO: MPPPSC The drilling of boreholes, supply and installation of windmills. Prepared by: Hector Mabaso Date: 05 May 2016.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
CORP 2987: Vehicle Accessories Financial Requirements Presented by: Commercial Finance.
Power Quality Monitoring Meters Financial Requirements Presented by: Commercial Finance Date: Friday 15 May’ 15.
CORP3397 Clarification Meeting Technical Evaluation of Meters Enquiry Date: 5 February 2016 Presenter: Mohamed Omar.
MEDUPI Catering PS(M)(R)2012 / AB /01: Financial Requirements Presented by: Commercial Finance Date: Thurs 11 Sept 2014.
Invitation to Tender No The Provision for Polygraph Test Services Period 5 Years CORP 3293.
KUSILE POWER STAION PROJECT PROVISION OF CAR WASH SERVICES ENQUIRY NUMBER : MPP (SC) DATE: 19 SEPTEMBER 2014.
Quality Management Supplier Quality Requirements The Manufacturer, testing at works and supply of various distribution cut- outs for wires business on.
ENQUIRY NO. CORP 3282 CLARIFICATION SESSION FOR REQUEST FOR QUOTATION FOR THE MANUFACTURE, TESTING, SUPPLY AND DELIVERY (TRANSMISSION, DISTRIBUTION AND.
CORP3341 Clarification Meeting Technical Evaluation of Metering Substation panels and modules Enquiry Date: 27 November 2015 Presenter: Henri Groenewald.
Clarification Meeting : CORP 3309 FOR THE PROVISION OF CONFIGURATION MANAGEMENT SERVICES FOR A PERIOD OF FIVE (5) YEARS Auditorium 1, Eskom Enterprise.
FIDIC Tendering Procedures
Quality Management Supplier Quality Requirements Clarification Meeting Media Monitoring Mothusi Itumeleng.
COMPULSORY BRIEFING SESSION Maturity Assessment and implementation recommendation for ITIL V3, COBIT 5 and KING III Chapter 5 RAF /2015/00016 Date:
Tender Briefing Session COR34/2016
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00032
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00010
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RFP /2017/00033 Supply and delivery of Corporate Uniform Date: 07 July 2017 Time: 11:00.
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021
Content of Tender Dossier - Instructions to Tenderers - Tenders
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Particular Conditions of Contract & Appendix to Tender
International Open Procedure (1) – PRAG 4.3
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00029
Curriculum Forms Guidelines and Information
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00001
Passenger Mobility Statistics 21 May 2015
Fasset Briefing Session
United Nations Procurement Division
Presentation transcript:

Group Technology HV Plant By: Sakkie van AardeDate: Slide: 1 of 5 Fault Path Indicators CLARIFICATION MEETING Presented by: Sakkie van Aarde (Power Plant) Date: 29 January 2016

Group Technology HV Plant By: Sakkie van AardeDate: Slide: 2 of 5 TECHNICAL REQUIREMENTS 11 & 22 kV Item DescriptionSAP No.Specification NoBG Drg No 1 Conductor Mounted FPI, 3 phase (Advance unit) 11 to 132 kV with DNP 3 IRTU DSP 34 – 1080 Rev 0 & DSP_ Rev 0 D-DT Rev 2

Group Technology HV Plant By: Sakkie van AardeDate: Slide: 3 of 5 TECHNICAL PAPER EVALUATION 1. Level 1 Gate-Keepers. This is meant for establishing if all the tender returnables are met. 2. Level 2 scoring. If all the tender returnables are met at level 1 the tender submission must score 80% to be considered to participate in the Competitive Enquiry stage. 3. Disqualification : Suppliers, who do not achieve a minimum score of 80%, shall be disqualified on the basis that they have not achieved Eskom’s minimum requirements. 4. Factory evaluation will only be done after the RFQ The factory/engineering evaluation will only be done if the supplier meets the requirements. If a factory evaluation was done with the last contract, it will not be done with this new evaluation.

Group Technology HV Plant By: Sakkie van AardeDate: Slide: 4 of 5 TECHNICAL SUBMISSION DOCUMENTS 5. Covering letter, containing a list of items offered. [1 x electronic copy (MS Word)] 5.1 Technical information. Separate folders shall be created per item offered with descriptive folder names, e.g.: “Item 1:- FPI– Outdoor, conductor mounted” The A&B and deviation schedules must be complete with the submission. The folder shall contain files, with descriptive files names, for at least the following documents: 5.1.1Drawings as specified, [1 x electronic copy (pdf format)] 5.1.2Completed test report summary sheet, [1 x electronic copy] 5.1.3Test reports as specified in Rev 2 & Rev 0, clearly marked and arranged in the same order as the type test report summary sheet, [1 x electronic copy].

Group Technology HV Plant By: Sakkie van AardeDate: Slide: 5 of 5 QUESTIONS ?