SSE-14 Invensys Simulation System. Rio Tinto is expanding its Cape Lambert iron ore offloading site. Rio Tinto’s Cape Lambert Port B (CLB) will process.

Slides:



Advertisements
Similar presentations
DAQMASTER Features and Benefits
Advertisements

© 2010 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.
Mobile Application Architectures
Niobrara R&D Corp Compact PLC Upgrades With the CERI.
1/1/ / faculty of Electrical Engineering eindhoven university of technology Architectures of Digital Information Systems Part 1: Interrupts and DMA dr.ir.
Snapshot of the Chinese overseas investments. Overall picture -In 2012, China’s non-financial overseas direct investment (ODI) reached to US$77.2 billion,
1 AutoCAD Electrical Seminar Advanced Micro Systems, Inc.
1 Manufacturing Solutions Division AutoCAD Electrical 2007 What’s New? AMS | CAD Consulting Group
1/1/ / faculty of Electrical Engineering eindhoven university of technology Introduction Part 3: Input/output and co-processors dr.ir. A.C. Verschueren.
Concept V2.5 Lesson 14 Objectives: After completing this lesson, the learner will be able to: –Utilize the special function blocks for configuring analog.
1 Storage Today Victor Hatridge – CIO Nashville Electric Service (615)
Modular PLC systems A, AnS and Q Series PLCs. System concept Wide range of solutions Added functions for Q series A, AnS and Q Series PLCs Questions.
1 RIO Pocket PLC. 2 Smart. Compact. Low Cost. Lots of I/O. Smart – RISC processor, memory, pulse counters, PID process loops, web interface, capability,
TAC Vista Security. Target  TAC Vista & Security Integration  Key customer groups –Existing TAC Vista users Provide features and hardware for security.
Chapter 9 Multimedia, Web Authoring, and More. Multimedia Multimedia integrates all kinds of information. Pages are linked by buttons. Story boards show.
Applying Wireless in Legacy Systems
Palletizing the Easy Way
1 AutoCAD Electrical 2008 What’s New Name Company AutoCAD Electrical 2008 Top Reasons to Move from AutoCAD AMS CAD Solutions
New Generation Automation Controller (PAC) Overview and Trend eAutomation Group Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
SLAC asyn class, Day 1, August 26, 2010 Example asyn driver Modbus Mark Rivers, Marty Kraimer, Eric Norum University of Chicago Advanced Photon Source.
eAutomation Enabler – Advantech Industrial NETworking
An example of platform independence in UNICOS control systems Koutli Maria CERN EN-ICE-PLC 07/02/14.
The Role of Communications in Mining Innovation Mining Automation Remote Operations & Control Critical Communications About Us.
Introduction to USB Development. USB Development Introduction Technical Overview USB in Embedded Systems Recent Developments Extensions to USB USB as.
Creating shared value Joanne Farrell Global head – Health, Safety, Environment and Communities.
1 Presentation by Johan Myburgh Manager, Coal Marketing Portfolio Committee on Public Enterprises 28 JANUARY 2010.
PLC introduction1 Discrete Event Control Concept Representation DEC controller design DEC controller implementation.
PLC: Programmable Logical Controller
Research, Development, Consulting, Training High Fidelity Modeling and Simulation Where we are going… …future plans.
1 Product & Technology Quality Excellence Support American Global Products Product & Technology TeSysPort Ethernet Interface for TeSys June 5, 2007.
Delta Motion Product – Motion System
Delta PLC DVP-MC Series Network Type Motion Controller
1 The Surging Fortunes of Aluminium Oscar Groeneveld Sydney Mining Club December 1, 2005.
Partnerships for Success Laurie Ball, Community Investment Advisor Rio Tinto WA.
1 AutoCAD Electrical 2008 What’s New Name Company AutoCAD Electrical 2008 What’s New AMS CAD Solutions
1 AutoCAD Electrical What’s New? AutoCAD Electrical 2006 – What’s New? Advanced Micro Systems, Inc.
MINER A Software The Goals Software being developed have to be portable maintainable over the expected lifetime of the experiment extensible accessible.
1 AutoCAD Electrical 2008 What’s New Name Company AutoCAD Electrical 2008 Top Reasons to Move from AutoCAD AMS CAD Solutions
Niobrara R&D Corp SY/MAX PLC Upgrades With the SERI.
Queensland Mining Industry Health & Safety Conference 2003 A member of the Rio Tinto Group Queensland Mining Industry Health & Safety Conference 2003 Innovation.
1 Chapter 9: Computers. Roles of Computers in Education Object of Instruction As a Tool Instructional Device Teaching Logical Thinking.
Unique push back exercises, practiced at Iron Ore Company of Canada to optimize Humphrey pit designs ALI CHAMANARA*, KAZEM ORAEE**, DAVID R. G. MITCHELL***
Intelligent System
Route Optimisation Using Wonderware Transnet Saldanha Bulk Terminal Emma Livesey Engineer – Hatch Africa.
Five Components of Computers Input Output Memory Control Datapath Processor.
File management and Performance. File Systems Architecture device drivers physical I/O (PIOCS) logical I/O (LIOCS) access methods File organization and.
CS 351/ IT 351 Modeling and Simulation Technologies HPC Architectures Dr. Jim Holten.
New product introduction:
Page 1 Next Generation Software Technologies using 3D Emulation for the Mining Industry Rev. 3.0.
The business logic engine for Microsoft IIS Speaker T.M. Arnett.
Thursday August 20, 2009 John Anderson Page 1 Accelerator Interlock System Issues Flow Down of Requirements from the Safety Order to Engineered Safety.
CONFIDENTIAL © 2007 Maplesoft, a division of Waterloo Maple Inc. Confidential MapleSim Pilot Test Program.
Device/Driver Support for Network Based Devices EPICS Collaboration Meeting Jun, 2003.
1 1999/Ph 514: Supported Hardware EPICS Supported Hardware Ned D. Arnold APS.
BASIC STRUCTURE OF PLC.
Metal and Nonmetal Fatal Accident Review CY 2005.
DriveWorksEZ for the G7 Drive The Intelligent Choice for Distributed Control PP.DWEZ.01 Date: 7/30/06, Rev:
"Minerals for Development” (M4D) a Finnish initiative for transferring good practices to producing countries Prof. Elias Ekdahl, Director General Geological.
SEMINAR ON P.L.C. SUBMITTED BY HRIDAY MUKHERJEE AMIT DEBNATH SOMNATH SHIL
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
An Overview When Connecting to Yaskawa Drives Date: 8/14/06, Rev: PP.AFD.26.
Seminar on "PLC” (Programmable Logic Controller)
Dynamometer for Testing Frequency Inverter Performance Andres Calle Otero, Alexander Sawyer, Christian Ratliff Advanced Power Electronics and Electric.
Introduction to Methods Engineering
CS703 - Advanced Operating Systems
Menu MAP EXPANDS ON CLICK Click on map to enlarge
Graphite® Control Platform
Architectural Features
● ERDENET MINING COMPANY
XC9500 Architectural Features
Presentation transcript:

SSE-14 Invensys Simulation System

Rio Tinto is expanding its Cape Lambert iron ore offloading site. Rio Tinto’s Cape Lambert Port B (CLB) will process 100 million tonnes per year. The engineering company behind the expansion, SKM, contracted Invensys to build a simulation system for development and testing of the PLC control system for CLB.

With the process model outside of the PLC code, this allows SKM to: Test the complex IO mapping in advance Eliminate the need to remove “simulation” blocks from the PLC code after Factory Acceptance.

Invensys’ simulation group utilized DYNSIM and its Mining, Metals, & Minerals (M3) object library to model the processes. The M3 Conveyor object was expanded to include functionality for the extreme and diverse situations of the offloading site.

The fidelity of the M3 library and the flexibility of DYNSIM allows SKM to rigorously test their high- level “Task Management System” - independent of the 26 lower-level PLCs.

Invensys also enhanced its Modbus communications link between DYNSIM and the Schneider PLCs to include the specialized IO cards and intelligent devices used extensively throughout CLB.

The simulation system is currently leading the development of many systems of the controls – SKM’s controls engineers are testing their logic at every stage leading up to and including Factory Acceptance Testing (FATs).

SKM and Rio Tinto have plans to expand the CLB simulation system for operator training once the controls are complete.